Oregon Bulletin
February 1, 2011
Rule
Caption: Modifies the eligibility criteria
for residential alternative energy devices and calculation of net costs.
Adm.
Order No.: DOE 16-2010
Filed with Sec. of
State: 12-22-2010
Certified to be
Effective: 12-22-10
Notice Publication
Date: 12-1-2010
Rules Adopted: 330-070-0019
Rules Amended: 330-070-0010, 330-070-0013, 330-070-0014,
330-070-0020, 330-070-0021, 330-070-0022, 330-070-0024, 330-070-0025,
330-070-0026, 330-070-0027, 330-070-0045, 330-070-0055, 330-070-0059,
330-070-0060, 330-070-0062, 330-070-0063, 330-070-0064, 330-070-0070,
330-070-0073, 330-070-0089, 330-070-0091, 330-070-0097
Rules Repealed: 330-070-0010(T), 330-070-0013(T), 330-070-0019(T),
330-070-0022(T)
Subject: The rule amendments are for changes to the Residential
Energy Tax Credit (RETC) rules. The rules are modified to change the
definitions to include energy purchase agreements, installed output , and third
party financing; redefine net costs and eligible alternative vehicles. The rule
amendments modify the criteria for determining the amount of credit and system
certification requirements; and extend the time for technician tax credit
certification from an annual to a three-year cycle, increase the standard for
total solar resource fraction, and increase the eligibility requirements for
appliances.
Rules Coordinator: Kathy Stuttaford—(503) 373-2127
330-070-0010
Purpose
(1) The department will grant or deny tax credits in
accordance with ORS 469.160 through 469.180 which allow tax credits for
Alternative Energy Devices (AEDs).
(2) These rules establish the criteria and standards
for issuance of tax credits for AEDs. None of these rules replace any building
code requirements.
(3) All decisions made by the department regarding AED
eligibility, issuance of tax-credit technician certification, complaints
regarding performance of tax-credit certified technician, revocation of
technician tax-credit certification and other matters relating to the
administration of this program after the effective date of these rules will be
made consistent with the criteria and standards contained in these rules.
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 12(Temp), f. & ef.
10-14-77; DOE 3-1978, f. & ef. 3-7-78; DOE 5-1978, f. & ef. 9-27-78;
DOE 6-1979, f. & ef. 11-13-79; DOE 1-1982, f. 1-12-82, ef. 2-1-82; DOE
6-1983, f. 12-16-83, ef. 1-1-84; DOE 1-1986, f. & ef. 2-7-86; DOE 4-1987,
f. 12-18-87, ef. 1-1-88; DOE 1-1989, f. & cert. ef. 6-15-89; DOE 2-1989, f.
12-28-89, cert. ef. 1-1-1990; DOE 1-1995, f. & cert. ef. 1-17-95; DOE
1-1996, f. & cert. ef. 4-1-96; DOE 1-1997, f. 12-15-97, cert. ef. 1-1-98;
DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE 2-2000, f. 12-29-00, cert. ef.
1-1-01; DOE 2-2001, f. 10-5-01, cert. ef. 10-8-01; DOE 1-2004, f. & cert.
ef. 1-21-04; DOE 2-2005, f. 12-30-05, cert. ef. 1-1-06; DOE 4-2006, f.
12-29-06, cert. ef. 1-1-07; DOE 4-2007, f. 11-30-07, cert. ef. 12-1-07; DOE
7-2008, f. 10-31-08, cert. ef. 11-1-08; DOE 7-2010(Temp), f. & cert. ef.
7-1-10 thru 12-28-10; DOE 16-2010, f. & cert. ef. 12-22-10
330-070-0013
Definitions
For the purposes of Oregon Administrative Rules,
Chapter 330, Division 70 the following definitions apply unless the context
requires otherwise:
(1) “AED” – Alternative Energy Device.
(2) “AED Agreement” – A contractual agreement
between a homeowner and a third party financing entity, where the homeowner
agrees to purchase energy generated by an AED or make a lease payment for
equipment that was installed under a third party financing model.
(3) “Active Solar Heating” – A solar system that
uses air or water that is moved by pumps or fans to collect, store and
distribute the sun’s energy to a dwelling or part of a dwelling.
(4) “AHRI” – Air-Conditioning, Heating, and
Refrigeration Institute.
(5) “Alternative Energy Device” (AED) – A device
or system that reduces the amount of conventional energy used by a dwelling.
AEDs include, but are not limited to, systems that collect and use solar
energy; ground source heat pump systems; energy-efficient appliances, energy-efficient
heating, ventilating and air conditioning systems; premium efficiency biomass
combustion devices, fuel cell systems; alternative fuel vehicles and related
alternative fuel devices or wind devices that supply, offset or supplement
electricity used for a dwelling or that supply electricity to a utility.
(6) “Alternative Fuel” – Electricity, natural
gas, ethanol, methanol, propane, and any other fuel approved by the Director.
(7) “Alternative Fuel Device” – An alternative
fuel vehicle, equipment necessary to convert a vehicle to use an alternative
fuel, or a fueling system necessary to operate an alternative fuel vehicle.
(8) “Annual Fuel Utilization Efficiency” (AFUE) –
The energy output divided by the energy input, calculated on an annual basis
and including part load and cycling effects. AFUE ratings shall be determined
using the U.S. Department of Energy test procedures (10 CFR Part 430) and
listings in the Air-Conditioning, Heating, and Refrigeration Institute (AHRI)
Directory of Certified Furnace and Boiler Efficiency Ratings.
(9) “Applicant” – A person who applies for a
residential alternative energy device tax credit under this section, which may
include:
(a) A person who files an Oregon tax return and applies
for a residential alternative energy device tax credit under this section, or
(b) An Oregon Investor Owned Utility (IOU) as defined
in ORS 757.005 or its subsidiaries and affiliated interests as defined in
757.015 that is designated by an applicant under OAR 330-070-0013(7)(a) to receive
the residential tax credit certificate for a qualifying alternative fuel device
on behalf of that designated applicant.
(10) “ARI” – Air Conditioning and Refrigeration
Institute.
(11) “ASHRAE” – American Society of Heating,
Refrigerating and Air Conditioning Engineers.
(12) “AWEA” – American Wind Energy Association.
(13) “Btu” – British Thermal Unit.
(14) “CEF” – Energy Factor for Combined Systems:
A non-dimensional descriptor of efficiency for combined space and water heating
systems during operation in the water-heating mode only. This part of the
three-part rating (which also includes space heating efficiency and combined
efficiency) takes into account the standby losses from the storage tank, if
any. A higher energy factor denotes better efficiency. Testing is accomplished
using the ANSI/ASHRAE 124 test method.
(15) “Coefficient of Performance” (COP) – The
ratio calculated by dividing the usable output energy by the electrical input
energy. Both energy values must be expressed in equivalent units.
(16) “Combined Annual Fuel Utilization Efficiency”
(CAFUE) – The effective efficiency of the combined appliance in
performing the function of space heating. A descriptor of efficiency for
combined space and water heating systems during operation in the space heating
mode only. This part of the three-part rating (which also includes water
heating efficiency and combined efficiency) does not count standby losses from
the storage tank, if any. A higher AFUE denotes better efficiency. Testing is
accomplished using the ANSI/ASHRAE 124-1991 test method.
(17) “Consumer Disclosure” – A department
approved form completed by the TCCT and provided to the buyer of AEDs, except
for energy-efficient appliances and alternative fuel devices, including
estimated energy savings of the AED, required conservation items, required
maintenance, and freeze protection information.
(18) “Domestic Water Heating” – The heating of
water used in a dwelling for bathing, clothes washing, dishwashing and other
related functions.
(19) “Ductless Mini-split Heat Pump” – An
air-source heat pump consisting of an outdoor unit connected directly to one or
more indoor units where the refrigerant is condensed and conditioned air is
delivered directly to the room or zone of a home rather than through a central
air handler.
(20) “Dwelling” – means real or personal property
inhabited as a principal or secondary residence. “Dwelling” includes, but is
not limited to, a single-family residence and an individual unit within
multiple unit residential housing.
(a) Principal residence is the dwelling owned by the
applicant who on the date of the application has legal title to a dwelling,
including the mortgagor under a duly recorded mortgage of real property, the
trustor under a duly recorded deed of trust or a purchaser under a duly
recorded contract for the purchase of real property, and who inhabits the
dwelling for no fewer than 14 days in a calendar year.
(b) Secondary residence is a vacation or other dwelling
owned by the applicant that is not the applicant’s principal residence.
(c) A dwelling does not include a motor home or
recreational vehicle as defined in ORS 446.003.
(21) “Electric Load” – Appliance and lighting
exclusive of any water or space heating use.
(22) “Energy Efficiency Ratio” (EER) – EER is
calculated by dividing the cooling capacity in Btu per hour (Btu/hr) by the
power input in watts at any given set of rating conditions, expressed in Btu/hr
per watt.
(23) “Energy-Efficient Appliance” – A clothes
washer, clothes dryer, water heater, refrigerator, dishwasher, space
conditioning system, solar electric alternating current (AC) module, or any
other major household appliance that has been certified by the department to
have premium energy efficiency characteristics.
(24) “Energy Factor” (EF) – Energy Factor is the
ratio of useful energy output from the water heater to the total amount of
energy delivered to the water heater. EF is a metric used to compare relative
efficiencies of water heaters. The higher the EF is, the more efficient the
water heater. EF is determined by the DOE test procedure, Code of Federal
Regulations, Title 10, Section 430.
(25)
“Energy Yield Chart” – Chart approved by the department showing first
year energy yield of an AED.
(26) “Energy Recovery Ventilator” (ERV) – A
device or system designed and installed to provide balanced fresh air
ventilation for homes with the ability to transfer energy from the outgoing air
stream to the incoming air stream that is also capable of at least 30 percent
Latent Recovery/Moisture Transfer (LRMT) at 32 degrees F when operating at the
lowest fan speed.
(27) “EUI (FURNACE)” – The Energy Use Index for a
furnace, used to determine its electric efficiency, and calculated by the
following formula, with inputs derived from the appropriate values in the
Air-Conditioning, Heating, and Refrigeration Institute (AHRI) Directory of
Certified Efficiency Ratings for Heating and Water Heating Equipment: 3.412 x
EAE / (3.412 x EAE + 1,000 x EF) ≤ 2.0 percent.
(28) “EUI (HERV)” – The Energy Use Index for an
HRV or ERV, used to determine its electric efficiency, and calculated by
dividing a model’s power consumption, in watts, by the net supply air
delivered, in cubic feet per minute (cfm), while the unit is operating in the
lowest speed for which performance data is provided in the Home Ventilating
Institute (HVI) Directory.
(29) “FERC” – Federal Energy Regulatory
Commission.
(30) “First Year Energy Yield” – Usable energy
produced under average conditions by an AED in its first year of operation.
Expressed in kWh, usable energy is the gross energy contribution minus any
parasitic energy used to operate the system.
(31) “Fuel Cell Stack” – The portion of a fuel
cell system where the electrochemical reactions take place, generally
consisting of an anode, an electrolyte, and a cathode and supporting systems
bringing fuel to the stack and carrying away the electricity, electrochemical
products and thermal energy generated.
(32) “Fuel Cell System” – A system for producing
electricity electrochemically and non-reversibly, using a hydrogen rich fuel
and oxygen, and producing an electric current, water, and thermal energy.
(33) “Ground Source Heat Pump” – A heating,
ventilating and air-conditioning system, also known as a ground source heat
pump, earth-coupled heat pump, geothermal heat pump or ground loop AED, that
utilizes a subsurface closed loop heat exchanger to extract or reject heat to
the earth.
(34) “Heat Recovery Ventilator” (HRV) – A device
or system designed and installed to provide balanced fresh air ventilation for
homes with the ability to transfer energy from the outgoing air stream to the
incoming air stream.
(35) “Heating Season Performance Factor” (HSPF) –
The total heating output of a heat pump during its normal annual usage period
for heating divided by the total electric power input in watt-hours during the
same period. HSPF is measured according to test procedures defined by AHRI in
its Standard 210/240 as well as ASHRAE Standard 116 and the DOE Test Procedure
in 10 CFR; Part 430, Appendix M (ARI, 2003).
(36) “HUD” – U.S. Department of Housing and Urban
Development.
(37) “Hybrid Vehicle” – An alternative fuel
vehicle that draws propulsion energy from on-board sources of stored energy
that include both an internal combustion or heat engine and a rechargeable
energy storage system.
(38) “Hydronic Space Heating System” – A system
that uses hot or warm water to deliver heat from a boiler or water heater to
the living spaces in a home.
(39) “Installed Output” – The rated capacity of a
photovoltaic system measured in average alternating current watts for the
purpose of determining the tax credit. Installed output equals 0.7 multiplied
by the rated direct current capacity as measured at standard test conditions.
(40) “IREC” – Interstate Renewable Energy
Council.
(41) “kWh” – Kilowatt-hour; 1 kWh = 3413 BTUs for
purposes of department calculations.
(42) “Latent Recovery Moisture Transfer” (LRMT) –
In an HRV or ERV, moisture recovered to the ventilation supply air stream
divided by moisture being exhausted, corrected for cross leakage, if any. LRMT
= 0 would indicate that no exhausting moisture is recovered for the incoming
supply air stream. LRMT = 1 would indicate that all exhausting moisture is
transferred.
(43) “MCFC” – Molten carbonate fuel cell.
(44) “Modified Energy Factor” (MEF) – The
non-dimensional efficiency rating for clothes washers. This measure, unlike the
EF, takes into account the moisture removed from the wash load in the spin
cycle, thereby changing energy use in the drying cycle. A higher MEF denotes a
more efficient clothes washer.
(45) “MM” – Million (M = 1000, MxM = 1000 x 1000
= 1,000,000).
(46) “Net Cost” – The applicant’s cost for the
design, acquisition, construction, installation, permitting and inspection of
an AED. Net cost may include the value of federal tax credits or utility
incentives. Net cost does not include service contracts, rebates, or refunds.
(47) “Net Generation” – The gross kWh produced
minus internal losses and parasitic loads. The net generation includes both the
amount of generation available to serve dwelling loads and to provide to a
utility.
(48) “OG” – Operating guidelines developed by the
Solar Rating and Certification Corporation (SRCC) including system performance
or component characteristics defined by SRCC in its directory.
(49) “Owner-Built” – An AED that is assembled and
installed on an owner’s property and with an owner’s labor only.
(50) “Parasitic Power” – The electrical energy
the system uses to operate.
(51) “Passive” – A solar AED that relies on
heated liquid or air rising to collect, store and move heat without mechanical
devices.
(52) “Passive Solar Space Heating” – A system or
building design that collects and stores solar energy received directly though
south facing windows. The system/design is without powered moving parts and
includes provisions to collect, store and distribute the sun’s energy using
only convection, radiation and conduction of energy.
(53) “Pass-Through Amount” – The amount required
to be passed through to an eligible AED owner in exchange for the right to
claim the tax credit. The pass-through amount shall be determined periodically
by the Director.
(54) “Pass-Through Provider” – An individual or
business that pays the pass-through amount to an applicant and receives the tax
credit in place of the applicant.
(55) “Pass-Through Verification” – A
determination based on information collected by the department that the
approved pass-through amount has been provided, that the applicant has
relinquished his or her claim to a tax credit and has assigned the credit to
the pass-through provider.
(56) “Peak Power Ratio” – The maximum power
available from the electric motor of a hybrid vehicle providing propulsion
energy when powered by the rechargeable energy storage system, divided by the
total of such maximum power and the SAE net power of the internal combustion or
heat engine.
(57) “Performance Checked Duct System”— A forced
air duct system that has been tested for duct leakage by a tax credit certified
technician using the department’s approved testing procedures, and that has
been repaired or constructed for premium efficiency using the department’s
approved materials to reduce duct air leakage. For purposes of the tax credit,
performance checked duct systems are considered energy-efficient appliances.
(58) “Performance Checked Heat Pump or Air Conditioner”
– A heat pump or air conditioner that has been tested and repaired or
serviced for premium efficiency by a tax credit certified technician using
department approved procedures to assure that refrigerant charge and system air
flow are within ranges recommended by the equipment manufacturer. For purposes
of the tax credit, performance tested heat pumps and air conditioners are
considered energy-efficient appliances.
(59) “Premium Efficiency Biomass Combustion Device”
– Any device that burns wood, compressed wood or other non-gaseous or
non-liquid solid fuels of 100 percent organic origin for aesthetic or
space-heating purposes.
(60) “PV System” – A complete solar electric
power system capable of delivering power to either the main or sub-panel in a
dwelling. Necessary components include solar electric modules, inverter,
mounting system, and disconnection equipment.
(61) “Seasonal Energy Efficiency Ratio” (SEER) –
A measure of the efficiency of a cooling system over the entire cooling season
(cooling accomplished divided by power used), expressed in Btu/kWh.
(62) “Solar Attic Fan” – A device that uses
photovoltaics to power a fan that pulls hot air out of an attic or roof space.
Such a device may either be a complete, all-in-one unit or be comprised of a
small photovoltaic panel and a DC powered attic fan designed to be run by
photovoltaic panel.
(63) “Solar Domestic Water Heating System” – A
configuration of solar collectors, pump, heat exchanger and storage tank
designed to heat water. System types include forced circulation, integral
collector storage, thermosyphon, and self-pumping. For the purpose of
determining system yields, a configuration of components is considered a new
system if changes occur in any of the following: type or size of collectors,
heat exchanger type or effectiveness, size of storage tank, or system type.
(64) “Solar Electric AC Module” – A solar
photovoltaic module coupled with a utility interactive inverter. The combined
system must be Underwriters Laboratory (UL) listed and meet all current
Institute of Electronic and Electrical Engineers (IEEE) 929 requirements.
(65) “SRCC” – Solar Rating and Certification
Corporation.
(66) “Sensible Recovery Efficiency” (SRE) – In an
HRV or ERV, the measurable (sensible) energy recovered to the ventilation
supply air stream minus supply fan and preheat coil energy use divided by the
total sensible energy being exhausted plus exhaust fan energy. This measure of
efficiency accounts for the effects of cross leakage between air streams,
purchased energy for fan controls, and defrost system energy use.
(67) “Standard Test Conditions” (STC) – 25
degrees Celsius cell temperature and 1000 watts per square meter.
(68) “Sunchart” – A chart or form issued or
approved by the department, and completed, signed and dated by tax-credit
certified technician showing the plotted path of the sun and any objects,
including both plant life and structures, that block the sun from an AED. The
viewpoint must be from the center of the lower edge of the collector, and must
depict whether any plant life is made up of evergreen or leafy trees. A lack of
shading on the AED must be indicated in writing on the chart.
(69) “System Certification” – Certification that
an AED as described in an application for tax credit meets all criteria for the
tax credit.
(70) “System Owner” – A person who owns the AED.
(71) “Tax-Credit Certified Technician” (TCCT) – A
technician who has been approved by the department to implement the tax credit
program. A tax-credit certified technician is responsible for assuring that
AEDs are installed in accordance with the department’s rules and must verify
system installation quality and performance.
(72) “Tax-Credit Listed Company” – A company that
employs at least one tax-credit certified technician.
(73) “Third Party Financing Model” – A project
financing model where an AED is installed at a dwelling but, financed and
maintained by a third party financing entity.
(74) “Total Solar Resource Fraction” – The
fraction of usable solar energy that is received by the solar panel/collector
throughout the year, which accounts for impacts due to external shading,
collector tilt and collector orientation.
(75) “Unheated Spaces” – Attics, garages, and any
space with an average ambient temperature of 50 degrees Fahrenheit or below during
the heating season.
(76) “Used Equipment” – Any product or any piece
of equipment not under a current manufacturer’s warranty or which has been
acquired by a previous owner or user.
(77) “Wastewater Heat Recovery Device” – A device
designed to recover thermal energy from household wastewater streams for the
purpose of returning a portion of this energy to the dwelling’s hot water
supply system.
(78) “Water Factor” (WF) – The measure of water
efficiency in clothes washers, measured in gallons per cubic foot of tub
capacity, per cycle (gal/ft3/cycle).
(79) “Wind AED” – A qualifying wind energy
conversion system that uses wind to produce mechanical or electrical power or
energy, including turbines, towers and their associated components needed to
form a complete system.
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 1-1982, f. 1-12-82, ef.
2-1-82; DOE 1-1986, f. & ef. 2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88,
Renumbered from 330-070-0023; DOE 1-1989, f. & cert. ef. 6-15-89; DOE 2-1989,
f. 12-28-89, cert. ef. 1-1-90; DOE 1-1995, f. & cert. ef. 1-17-95; DOE
1-1996, f. & cert. ef. 4-1-96; DOE 1-1997, f. 12-15-97, cert. ef. 1-1-98;
DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE 2-2000, f. 12-29-00, cert. ef.
1-1-01; DOE 2-2000, f. 12-29-00, cert. ef. 1-1-01; DOE 2-2001, f. 10-5-01,
cert. ef. 10-8-01; DOE 1-2004, f. & cert. ef. 1-21-04; DOE 2-2005, f.
12-30-05, cert. ef. 1-1-06; DOE 4-2006, f. 12-29-06, cert. ef. 1-1-07; DOE
4-2007, f. 11-30-07, cert. ef. 12-1-07; DOE 7-2010(Temp), f. & cert. ef.
7-1-10 thru 12-28-10; DOE 16-2010, f. & cert. ef. 12-22-10
330-070-0014
Pass-Through Eligibility
(1) Any person or business that purchases the approved
tax credit from the AED system owner is eligible to claim the tax credit
associated with that system in place of the AED system owner. Any person or
business that purchases the approved tax credit from the AED system owner who
owns or constructs an eligible alternative fuel station is entitled to claim
the tax credit associated with that device in place of the system owner or
contractor.
(2) In accordance with ORS 469.170 (9) the department
is establishing the following rates to be used in calculating the pass through
amount:
(a) For tax credits greater than $1,500 when the
pass-through partner is a business, the pass through amount is 80 percent of
the tax credit amount.
(b) For tax credits greater than $1,500 when the
pass-through partner is a resident, the pass through amount is 86 percent of
the tax credit amount.
(c) For tax credits less than $1,500 the pass-through
amount is 95 percent of the tax credit amount.
(3) In addition to other required information,
verification information for tax credits obtained by pass-through providers
shall include verification that the approved pass-through amount has been
provided, and acknowledgement that the person originally eligible to receive a
tax credit has relinquished his or her claim to the credit and has assigned the
credit to the pass through provider.
Stat. Auth.: ORS 469.040, 469.160
- 180 & 469.710 - 720
Stats. Implemented: ORS 469.040,
469.160 - 180 & 469.710 - 720
Hist.: DOE 2-2001, f. 10-5-01,
cert. ef. 10-8-01; DOE 1-2004, f. & cert. ef. 1-21-04; DOE 2-2005, f.
12-30-05, cert. ef. 1-1-06; DOE 4-2007, f. 11-30-07, cert. ef. 12-1-07; DOE
16-2010, f. & cert. ef. 12-22-10
330-070-0019
Net Cost
(1) Notwithstanding the definition in OAR
330-070-0013(46), an applicant who installed eligible AEDs on or after August
1, 2010 and prior to January 1, 2011, other than those under contract on or
before August 13, 2010 and installed prior to January 1, 2011, must determine
“net cost” by calculating the amount the applicant paid for design,
acquisition, building and installation of the AED, including permit and
inspection fees. The net cost must include the value of federal tax credits and
utility incentives. Net cost does not include service contracts, rebates, or
refunds.
(2) An applicant:
(a) With an eligible AED installed prior to August 1,
2010 must clearly indicate on the application that the date of installation
completion was prior to August 1, 2010; or
(b) With an eligible AED installed on or after August
1, 2010 and prior to December 31, 2010, who have a signed contract dated on or
before August 13, 2010, must:
(A) Have provided a copy of the contract for the
installation of an eligible AED to the department no later than 5:00 p.m. on
Friday, August 27, 2010;
(B) Indicate on the application that the project was
completed on or before December 31, 2010; and
(C) Provide the department evidence of the completed
installation in the form of a copy of the approved final inspection, dated on
or before December 31, 2010, as issued by the local jurisdiction.
(3) The department may grant an additional 15 days for
project completion upon the written request of the applicant for good cause
shown. The applicant must request the additional time in writing and explain
the extenuating circumstances as to why the installation was not completed on
or before December 31, 2010. Any project granted the additional time must be
completed no later than Friday, January 14, 2011.
Stat. Auth.: ORS 469.160 - 469.180
Stats. Implemented: ORS
469.160.160 - 469.180
Hist.: DOE 10-2010(Temp), f. &
cert. ef. 7-30-10 thru 1-24-11; DOE 16-2010, f. & cert. ef. 12-22-10
330-070-0020
Eligibility
(1) To qualify for a credit, a person must:
(a) Have an income tax liability in Oregon; and
(b) Purchase an AED, complete construction and
installation if applicable, and obtain a certification in accordance with OAR
330-070-0010 through 330-070-0097; and
(c) Be the owner or contract buyer of an Oregon
dwelling served by the AED, or be a tenant of the dwelling owner; and
(A) Use the dwelling as a primary or secondary
residence; or
(B) Rent or lease the dwelling to a tenant who uses the
dwelling or dwellings as a principal or secondary residence.
(2) If the basis for the credit is the installation of
an energy-efficient appliance, the credit shall be allowed only to the taxpayer
who actually occupies the dwelling as a principal or secondary residence.
(3) If the basis for the credit is a fueling station
necessary to operate an alternative fuel vehicle, unless the certificate is
transferred, the company that constructs the dwelling that incorporates the
fueling station or who installs the fueling station in the dwelling may claim
the credit. If the alternative energy device is an alternative fuel vehicle or
related equipment, the credit must be claimed by the system owner.
(4) Any person that pays the present value of the tax
credit for a qualified alternative energy device to the person who originally
purchases the device shall be entitled to claim the credit in place of the
original credit owner.
(5) For a qualified vehicle owned by a lessor during
the period of first use of a new vehicle, the lessor may pass-through the right
to claim the credit to the lessee exercising the first new use.
(6) Notwithstanding (1)(b), a person may qualify for a
credit of a third party financed AED by meeting the following additional
requirements:
(a) Installations must include a minimum 10 year AED
agreement or lease agreement.
(b) All equipment must be covered by a full service
maintenance agreement provided by a third party financing entity for the entire
length of the AED agreement or lease agreement.
Stat. Auth.: ORS 469
Stats. Implemented: ORS 469.160
Hist.: DOE 12(Temp), f. & ef.
10-14-77; DOE 3-1978, f. & ef. 3-7-78; DOE 5-1978, f. & ef. 9-27-78;
DOE 6-1979, f. & ef. 11-13-79; DOE 1-1982, f. 1-12-82, ef. 2-1-82; DOE
6-1983, f. 12-16-83, ef. 1-1-84; DOE 7-1984, f. & ef. 12-19-84; DOE 1-1986,
f. & ef. 2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88; DOE 1-1997, f.
12-15-97, cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE
2-2001, f. 10-5-01, cert. ef. 10-8-01; DOE 1-2004, f. & cert. ef. 1-21-04;
DOE 2-2005, f. 12-30-05, cert. ef. 1-1-06; DOE 4-2006, f. 12-29-06, cert. ef.
1-1-07; DOE 16-2010, f. & cert. ef. 12-22-10
330-070-0021
Eligible Devices
(1) To earn a tax credit, an AED must:
(a) Be a complete system. The system must be able to
collect, store, convert, monitor, and distribute energy to the dwelling it
serves. Additions to existing AED systems, except for pool, spa, or hot tub
systems, are eligible when those additions increase the energy production
capacity and the kWh saved by the system;
(b) Be a system that is built, installed, and operated
in accordance with ORS 469.160 through 469.180;
(c) Be a system with manufacturers’ warranties against
defects in products and materials;
(d) Be a system that complies with general and specific
standards in these rules as they apply to AED systems and be one of the
following:
(A) A system that uses solar energy;
(B) A ground source heat pump ;
(C) A renewable energy system that heats or cools
space, heats water, or makes electricity;
(D) An energy-efficient appliance including a
wastewater heat recovery device;
(E) An alternative fuel device; vehicles licensed and
registered for first new use on Oregon roadways and used vehicles being modified
for first new use of a qualifying alternative fuel device are eligible for the
tax credit.
(F) A fuel cell system;
(G) A heat pump water heater;
(H) A premium efficiency biomass combustion device;
(I) A ductless mini-split heat pump;.
(J) A gas Furnace;
(K) A boiler;
(L) A heat and Energy Recovery Ventilator; or
(M) An air Source Heat Pump.
(2) The following devices are not eligible for an AED
tax credit:
(a) Standard efficiency furnaces;
(b) Standard backup heating systems;
(c) Wood stoves or wood furnaces, or any part of a
heating system that burns wood except a qualifying premium efficiency biomass
combustion device;
(d) Heat pump water heaters that are part of a
geothermal heat pump space heating system;
(e) Structures that cover or enclose a swimming pool
and are not attached to the dwelling;
(f) Swimming pools and hot tubs used to store heat;
(g) Photovoltaic systems installed on recreational
vehicles;
(h) Additions to existing spa and hot tub systems;
(i) Above ground, un-insulated swimming pools, spas and
hot tubs;
(j) Conversions of systems from one type to another. An
example is a conversion of a draindown solar hot water system to a drainback
solar hot water system;
(k) Used equipment;
(l) Repairs and maintenance of systems having received
prior certification for an AED tax credit;
(m) Water source heat pump: A system that uses surface
or subsurface water in a single pass without recirculation (open loop);
(n) Hydro systems;
(o) Wind systems that are used to heat or cool buildings,
or to heat domestic, swimming pool or hot tub water; and
(p) Renewable energy systems that received
certification under the Business Energy Tax Credit program as Homebuilder
Installed Renewable Energy Facilities or as part of a High Performance Home.
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 1-1986, f. & ef.
2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88; DOE 1-1989, f. & cert. ef.
6-15-89; DOE 2-1989, f. 12-28-89, cert. ef. 1-1-90; DOE 1-1995, f. & cert.
ef. 1-17-95; DOE 1-1996, f. & cert. ef. 4-1-96; DOE 1-1997, f. 12-15-97,
cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE 2-2001, f.
10-5-01, cert. ef. 10-8-01; DOE 1-2004, f. & cert. ef. 1-21-04; DOE 2-2005,
f. 12-30-05, cert. ef. 1-1-06; DOE 4-2007, f. 11-30-07, cert. ef. 12-1-07; DOE
16-2010, f. & cert. ef. 12-22-10
330-070-0022
Amount of Tax Credit
(1) The amount of the AED tax credit is based on the
first-year energy yield of an eligible AED. The energy yield basis for a solar
tax credit may be adjusted by the department to account for less than optimal
solar access.
(2) The amount of the AED tax credit shall not exceed
the lesser of:
(a) $1,500 or the first-year energy yield of the AED in
kWh multiplied by 60 cents for AEDs used for solar or geothermal space heating,
cooling, electrical energy production or domestic water heating for tax years
beginning on or after January 1, 1998. The amount of the credit may not exceed
100 percent of the cost of the system components and their installation. Only
one tax credit for ground source heat pump systems will be issued per year per
residence.
(b) For an alternative energy device used for swimming
pool, spa or hot tub heating, the credit allowed must be based upon 50 percent
of the cost of the device or the first year’s energy yield in kilowatt hours
per year multiplied by 15 cents, whichever is lower, up to maximum credit
amounts set in subsections (a) through (c) of this section.
(c) For each alternative fuel device, the credit
allowed is 25 percent of the eligible cost of the alternative fuel device, not
to exceed $750 for devices placed in service on or after January 1, 1998.
Individual credit may be claimed for both an alternative fuel vehicle and an
alternative fuel fueling system.
(A) Eligible cost is the difference in the cost between
a conventional fueled vehicle of similar size with similar features and the
cost of an alternative fuel vehicle and its charging or fueling systems.
(i) Conventional fuel vehicles manufactured by the same
manufacturer with the same seating capacity and/or cab cubic volume or weight
difference that are less than 20 percent, may be used to define eligible costs,
provided that other features (upholstery, audio, suspension, body appointment)
are similar.
(ii) Low-speed vehicles, as defined under ORS 801.331
(2009 Oregon Vehicle Code) and alternative fuel vehicles capable of using E-85
and gasoline (flex-fuel vehicles) are not eligible for a tax credit.
(d) For fuel cell systems placed in service on or after
January 1, 2007, one tax credit may be issued per year per residence based on
the first-year energy yield of the AED in kWh multiplied by 60 cents, not to
exceed $6,000 and not to exceed 50 percent of the cost of the system. The
maximum credit claimed per year will not exceed $1,500.
(e) For photovoltaic systems installed on or after
November 4, 2005, one $6,000 tax credit per year per residence for four years
($1,500 per year) not to exceed 50 percent of the cost of the system as defined
in OAR 330-070-0022(4).
(f) For wind AEDs installed on or after January 1,
2007, one tax credit may be issued per year per residence based on the
first-year energy yield of the AED in kWh multiplied by $2.00, not to exceed
$6,000 and not to exceed 50 percent of the cost of the system. The maximum
credit claimed per year will not exceed $1,500.
(3) For an energy-efficient appliance, the credit
allowed under this section shall equal:
(a) 40 cents per kilowatt hour saved, or the equivalent
for other fuel saved. The total for each appliance is not to exceed 25 percent
of the cost of the appliance.
(b) $50 per 6,000 Btu/hr of rated capacity, up to $400
or 25 percent of the cost, whichever is less, if the energy-efficient appliance
is a very high efficiency air source ductless heat pump.
(4) For photovoltaic systems:
(a) Installed on or after November 4, 2005 and prior to
January 1, 2011, the credit allowed under this section shall equal $3 per watt
of the installed capacity measure in watts of direct current at industry
standard test conditions.
(b) Installed on or after January 1, 2011, the credit
allowed under this section shall equal $3 per watt of the installed output.
(c) A maximum of one credit valued at $6,000 shall be
issued per residence per year for the year in which it was installed in annual
increments up to $1,500 over a four-year period. The total credit shall not
exceed 50 percent of the cost of the system. All photovoltaic systems installed
at a dwelling within a 5 year period shall be considered a single device.
(5) For premium efficiency biomass combustion devices,
the credit allowed under this section shall be up to $300 or 25 percent of the
cost of the device, whichever is less, based upon the efficiency and the first
year energy yield of the AED in kilowatt hours multiplied by 40 cents as
determined by the department.
(6) The amount of the tax credit must not exceed the
net cost of the AED to the applicant. The sum of any rebates or cash payments,
including public purpose organization or federal grants or credits and the
residential energy tax credit may not exceed costs.
(7) For purposes of the tax credit, the cost of the AED
must:
(a) Comply with OAR 330-070-0060 through 330-070-0097,
as those rules apply;
(b) Be the net cost of acquiring the system.
(A) AEDs using an alternative energy source for only a
part of their energy output or savings will have net cost prorated. Net cost
must be based on that part of the AED’s energy output or savings that is due to
the alternative source;
(B) The department may find an AED to be too large for
a dwelling. In such case net cost must be prorated. Net cost must be based on
the largest useful size of an AED for the dwelling. The department must
determine largest useful size based on the energy needs of the building; and
(C) The amount of credit for the original system and an
addition may not exceed $1,500 per year.
(8) For purposes of the tax credit, the net eligible cost
of the AED is only those costs necessary for the system to yield energy savings
and must not include:
(a) Unpaid labor including the applicant’s labor;
(b) Operating and maintenance costs;
(c) Land costs;
(d) Legal and court costs;
(e) Patent search fees;
(f) Fees for use permits or variances;
(g) Loan interest;
(h) Amounts from vendors of an AED that reduce its
cost. These include rebates, discounts and refunds;
(i) Service contracts;
(j) Cost of moving a used AED from one site to another;
(k) Cost of repair or resale of a system;
(l) Any part of the purchase price which is optional,
such as an extended warranty; and
(m) Delivery fees.
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 1-1986, f. & ef.
2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88; DOE 2-1989, f. 12-28-89, cert. ef.
1-1-90; DOE 1-1996, f. & cert. ef. 4-1-96; DOE 1-1997, f. 12-15-97, cert.
ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE 2-2001, f. 10-5-01,
cert. ef. 10-8-01; DOE 1-2004, f. & cert. ef. 1-21-04; DOE 2-2005, f.
12-30-05, cert. ef. 1-1-06; DOE 4-2007, f. 11-30-07, cert. ef. 12-1-07; DOE
7-2010(Temp), f. & cert. ef. 7-1-10 thru 12-28-10; DOE 16-2010, f. &
cert. ef. 12-22-10
330-070-0024
Year Credit Claimed
(1) The tax credit is must be claimed pursuant to ORS
316.116.
(2) The tax credit may not exceed a person’s tax
liability. Unused credit may be carried forward for a maximum of 5 years as
allowed under ORS 316.116.
(3) Proof of purchase must be a contract or invoices
dated in the year for which the applicant is claiming the credit.
Stat. Auth.: ORS 469
Stats. Implemented: ORS 469.160
Hist.: DOE 4-1987, f. 12-18-87,
ef. 1-1-88; DOE 1-1989, f. & cert. ef. 6-15-89; DOE 2-1989, f. 12-28-89,
cert. ef. 1-1-90; DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE 2-2001, f.
10-5-01, cert. ef. 10-8-01; DOE 1-2004, f. & cert. ef. 1-21-04; DOE
16-2010, f. & cert. ef. 12-22-10
330-070-0025
Application for System
Certification
(1) Applicants for a tax credit must obtain a system
certification from the department.
(2) Applications for a system certification must be
made in a form developed by the department:
(a) All applications must include a statement that the
system and technician or owner-builder will meet all federal, state and local
requirements;
(b) All applications must include the purchaser’s
social security number for use as an identification number in maintaining
internal records. The purchaser’s social security number may be shared with the
Department of Revenue to establish the identity of an individual in order to
administer state tax law.
(c) All applications must state:
(A) The net cost of the AED;
(B) The location of the AED;
(C) Estimated first-year energy yield of the AED
provided by the technician or from the department’s energy yield chart, if any;
and
(D) That the purchaser has received an operating manual
for the AED, except that no operating manual is required for sunspaces or
direct gain space heating systems.
(d) All applications must state that the technician
agrees to make any changes required by the department for the system to comply
with ORS 469.160 through 469.180;
(e) All applications must be signed by the purchaser
and technician, if any, or, a form of electronic signature acceptable to the
department shall be provided; and
(f) A technician or applicant must not give the
department false or misleading information about an AED.
(3) System certification applications for solar water
heating AEDs must contain:
(a) All
the data required in section (2) and must also include:
(b) The number of collectors;
(c) The manufacturer and/or supplier;
(d) The collector dimensions and/or the net area of the
collectors;
(e) The amount of heat storage;
(f) The system type;
(g) Declaration of SRCC certification status or equivalence
as determined by the department;
(h) A description of the freeze protection for the
system;
(i) A description of the over-heat protection for the
system;
(j) The system model;
(k) Orientation and tilt of the collector;
(l) A sunchart for the collector location;
(m) A Consumer Disclosure signed by the applicant and
technician or supplier, if any;
(n) A statement that the purchaser has received a copy
of consumer information supplied by the department; and
(o) Other data the department requires to determine
eligibility.
(4) System certification applications for active solar
space heating AEDs must contain:
(a) All the data required in sections (2) and (3) of
this rule;
(b) A heat loss estimate for the home;
(c) The type and amount of thermal storage;
(d) A sunchart for the collector location; and
(e) Other data the department requires to determine
eligibility.
(5) System certification applications for passive solar
space heating AEDs must contain:
(a) All the data required in section (2) above and must
also contain:
(a) A copy of the building permit plans;
(b) A copy of the window specifications used;
(c) The type and amount of thermal storage;
(d) A sunchart taken at the center of the solar glazing;
and
(e) Other data the department requires to determine
eligibility.
(6) System certification applications for photovoltaic
AEDs must contain:
(a) The data required in section 2 and must also
contain:
(b) The number of modules;
(c) The brand name of the module(s);
(d) The module(s) area;
(e) The rated DC output in watts of the module(s) under
Standard Test Conditions (STC);
(f) A description of the storage provided if storage is
a part of the system;
(g) Storage brand and model;
(h) Storage capacity in kWh;
(i) The brand name of the inverter if an inverter is
part of the system;
(j) The capacity of the inverter;
(k) Orientation and tilt of the array;
(l) A sunchart of the array location;
(m) Other data the department requires to determine
eligibility; and
(n) Must submit copy of final inspection after system
has been permitted by applicant’s local jurisdiction.
(7) System certification applications for ground source
heat pumps must contain:
(a) All
the data required in section (2) of this rule and must also contain:
(b) For all systems connected to a well, data on the
well including:
(A) Depth;
(B) Diameter (cased);
(C) Temperature;
(D) Static water level below grade;
(E) A copy of the well driller’s log, if available; and
(F) Other data the department requires to determine
eligibility.
(c) For systems connected to a heat pump:
(A) Brand name and model number of the heat pump;
(B) Rated output at the entering water temperature;
(C) Estimated system COP rated by ARI under Standard
325 -85 at an entering water temperature of 50 degrees Fahrenheit; and
(D) Any other data the department requires to determine
eligibility.
(d) For ground loop heat pump systems:
(A) All the information in subsection (7)(b) of this
rule; and
(B) Brand name, rated output, estimated COP;
(C) Length and depth of the loop;
(D) Materials and spacing used;
(E) Type of heat transfer fluid; and
(F) Other data the department requires to determine
eligibility.
(8) System certification applications for energy-efficient
appliances must contain:
(a) All the data required in section (2) of this rule
and must also contain;(d) The dealer’s business location;
(e) The brand name, make, model number, capacity and/or
size of the appliance;
(f) A signed copy of the sales agreement, which will
include all of the following:
(A) Verification of purchaser’s name and address; and
(B) Verification of model of appliance; and
(C) Verification of actual price paid for appliance.
(g) Certification of new equipment warranty; and
(h) Other data the department requires to determine
eligibility.
(9) System certification applications for alternative
fuel devices must contain:
(a) Taxpayer’s name;
(b) Taxpayer i.d. or social security number;
(c) State of Oregon vehicle registration number;
(d) Installation location by street address;
(e) The name of the licensed and bonded company
employing the technician;
(f) The company’s business location;
(g) The brand name, make, model number, or component
list of the AFD;
(h) A signed copy of the sales agreement, which will
include all of the following:
(A) Verification of purchaser’s name and address; and
(B) Verification of model of, or components used for
AFD; and
(C) Verification of actual price paid for the AFD.
(i) Certification of new equipment warranty;
(j) An optional letter attached to the application
declaring that the applicant designates an Investor Owned Utility (IOU) or
other qualifying entity as the eligible recipient of the credit certificate on
behalf of the project owner applicant that includes:
(A) Name, address, contact person, phone number,
facsimile number of the IOU or designated qualifying party; and
(B) Signature, or form of electronic signature
acceptable to the department, of an authorized representative of the IOU or
other designated qualifying party stating willingness to accept the tax credit
certificate; and
(k) Other data the department requires to determine
eligibility.
(10) System certification applications for fuel cells
must provide information regarding:
(a) The data required in section (2) and must also
contain:
(b) The rated fuel cell stack peak capacity, in kW;
(c) The rated fuel cell system peak capacity, in kW
(this rating includes peak capacity enhancing devices such as batteries and
other storage devices or systems);
(d) Whether or not the system is grid connected;
(e) The fuel used by the system;
(f) The type of fuel stack (PEM, PAFC, SOFC, etc.);
(g) An estimate of the average load, in kW, expected to
be placed on the system;
(h) The thermal energy production rate, in Btu/hour, at
peak capacity and at the average load specified in (10)(f) above;
(i) Whether or not the system has provisions for
thermal heat recovery, and if so, where the thermal energy is designed to be
used (domestic hot water, space heating, etc.); and
(j) Other data the department requires to determine
eligibility.
(11) System certification applications for premium
efficiency biomass combustion devices must provide information regarding:
(a) The manufacturer, model, capacity, serial number;
and
(b) The device characteristics defined as catalytic,
non-catalytic, or pellet stove or boiler; and
(c) Vendor name and address; and
(d) Price paid for the device, any parts or
installation; and
(e) A signed certification from the applicant verifying
that any wood burning device which is being replaced has been rendered unusable
and will be retired permanently from service; and
(f) The efficiency and grams of smoke per hour
published in the List of EPA Certified Wood Stoves; or
(g) The efficiency and grams of smoke per hour
published in a third-party list approved by the Director in the year in which
the device was purchased; or
(h) A certificate of performance including the grams of
smoke per hour and efficiency for the specific manufacturer and model of wood
burning device from a currently US EPA certified woodstove testing laboratory.
(i) Other data the department required to determine
eligibility.
(12) A system certification may be transferred by an
applicant who does not qualify for tax relief to the first eligible buyer of
the dwelling.
(13) For a third party financed system, the application
must provide copies of an energy purchase or lease agreement and full service
maintenance agreement
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 6-1979, f. & ef.
11-13-79; DOE 1-1982, f. 1-12-82, ef. 2-1-82; DOE 6-1983, f. 12-16-83, ef.
1-1-84; DOE 7-1984, f. & ef. 12-19-84; DOE 1-1986, f. & ef. 2-7-86; DOE
4-1987, f. 12-18-87, ef. 1-1-88; DOE 1-1988(Temp), f. & cert. ef. 1-13-88;
DOE 1-1989, f. & cert. ef. 6-15-89; DOE 2-1989, f. 12-28-89, cert. ef.
1-1-90; DOE 1-1996, f. & cert. ef. 4-1-96; DOE 1-1997, f. 12-15-97, cert.
ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE 2-2001, f. 10-5-01,
cert. ef. 10-8-01; DOE 1-2004, f. & cert. ef. 1-21-04; DOE 2-2005, f.
12-30-05, cert. ef. 1-1-06; DOE 4-2007, f. 11-30-07, cert. ef. 12-1-07; DOE
16-2010, f. & cert. ef. 12-22-10
330-070-0026
Technician Tax Credit
Certification
(1) Technicians may on a voluntary basis apply for the
department’s tax-credit certification for a technology listed in subsection (2)
of this section. Certification is intended to assist consumers with the state
tax credit program, ensure that the systems are installed according to
department rules, and verify system installation quality and performance.
Technician certifications are valid for three years and must be renewed to
remain in effect.
(2) A tax-credit certified technician applies only to
the following products:
(a) Solar water heating systems;
(b) Ground source heat pumps (geothermal);
(c) Photovoltaic systems;
(d) Performance-tested ducts; and
(e) Air source heat pumps/air conditioning systems.
(3) The tax-credit certified technician’s qualification
is based on the following:
(a) Knowledge and understanding of the tax credit
program requirements and expectations;
(b) Ability to provide systems that are designed and
installed consistent with the manufacturer’s warranty; and
(c) Employment by a company with a Construction
Contractors Board (CCB) license.
(d) Those who do not maintain these competencies are
subject to revocation of the certification.
(4) A Tax-credit certified technician qualification
entitles a technician to:
(a) Inform the AED system owner that he or she has
attended the department’s periodic training classes and is familiar with the
rules and requirements of the Residential Energy Tax Credit Program.
(b) Verify that installation of tax-credit qualified
equipment and systems meet department standards for performance and longevity.
(5) Tax-credit certified technician status requires
that the technicians must follow department requirements including:
(a) Duct and air-source heat pump/air conditioning
technicians must have a current or valid certification with Performance Tested
Comfort System (PTCS) or Proctor Engineering CheckMe! Programs.
(b) Solar technicians must show a valid or current
(North American Board of Certified Energy Practitioners-NABCEP certification or
Limited Renewable Energy Technician (LRT) license for solar electric, Solar
Thermal License (STL) for solar thermal, or pass the department’s competency
testing with a score of 70 or above for the technology. On or after May 4,
2009, new applicants for tax credit certified solar technicians must show
NABCEP photovoltaic (PV) certification or or successfully passed the NABCEP PV
Entry-Level Exam or Limited Renewable Energy Technician (LRT) license or Solar
Thermal License (STL) or other certification approved by the Director to be a
tax credit certified solar technician. On and after May 4, 2010 all tax credit
certified solar technicians must show proof of appropriate NABCEP or LRT or STL
certification or other certification approved by the Director to maintain their
tax credit solar certification with the department.
(c) First-time geothermal technician applicants must
show proof of successful completion of International Ground Source Heat Pump
Association training (IGSHPA) or IGSHPA certified manufacturer’s installer
training program or other training approved by the Director.
(d) Solar and geothermal tax credit certified
technician applicants must participate in periodic department tax-credit
training at least once every three years unless otherwise specified in
department rule..
(e) Technicians must verify the AED owner has user
manual for equipment/system.
(f) Technicians must provide the AED owner with a
completed application and a copy of the final itemized dated invoice for the
system that is marked “inspected and paid for.” Verify owner has a written full
warranty for the system that lasts no less than 24 months after the system is
installed.
(g) Technicians must maintain tax-credit certification
status by completing the following technology-specific requirements during the
previous three years:
(A) For solar technology:
(i) Submit and approve two (2) Residential or Business
Energy Tax Credit applications for systems in technology in which technician is
certified and complete four (4) hours of related technical continuing
education; or
(ii) Submit and approve one (1) Residential or Business
Energy tax Credit application for system in technology in which technician is
certified and complete six (6) hours of related technical continuing education;
or
(iii) Complete eight (8) hours of related technical
education.
(B) For air source heat pumps/air conditioning: Must
have a current or valid certification with PTCS or Proctor Engineering CheckMe!
Programs.
(C) For performance tested duct systems: Must have a
current or valid certification with PTCS.
(D) For ground-source heat pumps: Have submitted and
approved a minimum of one (1) tax credit application or proof of having
completed at least two hours of relevant installer training, community college
HVAC course, or other training approved by the Director.
(6) Tax credits for installation of air source heat
pumps/air conditioning systems, performance-tested ducts, geothermal systems,
solar electric and solar thermal systems must be verified by a department
tax-credit certified technician.
(7) A tax-credit certified technician must notify the
department within 30 days if changes are made in any of the information in the
certification application.
(8) The department will list companies employing duct
and air-source heat pump/air conditioning technicians. A listed company must:
(a) Employ a tax credit certified technician who has a
valid or current certification with PTCS or Proctor Engineering CheckMe!
Programs.
(b) Apply in writing and renew their listing on an
annual basis.
(c) Have a minimum of two key administrative staff
participate in the department’s periodic update training.
(d) Tax credit certified technicians that do not meet
the minimum requirements are suspended for one-year after which they may
reapply.
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 1-1982, f. 1-12-82, ef.
2-1-82; DOE 6-1983, f. 12-16-83, ef. 1-1-84; DOE 7-1984, f. & ef. 12-19-84;
DOE 1-1986, f. & ef. 2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88; DOE
1-1989, f. & cert. ef. 6-15-89; DOE 2-1989, f. 12-28-89, cert. ef. 1-1-90;
DOE 1-1995, f. & cert. ef. 1-17-95; DOE 1-1996, f. & cert. ef. 4-1-96;
DOE 1-1997, f. 12-15-97, cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef.
1-1-00; DOE 2-2001, f. 10-5-01, cert. ef. 10-8-01; DOE 1-2004, f. & cert.
ef. 1-21-04; DOE 2-2005, f. 12-30-05, cert. ef. 1-1-06; DOE 4-2007, f. 11-30-07,
cert. ef. 12-1-07; DOE 7-2008, f. 10-31-08, cert. ef. 11-1-08; DOE 16-2010, f.
& cert. ef. 12-22-10
330-070-0027
Application Review Process
(1) The department must review applications for AED tax
credit approval. AEDs must comply with OAR 330-070-0010 through 330-070-0097.
Specific rules for each type of AED are provided in OAR 330-070-0060 through
330-070-0097.
(2) The department will return applications that are
not complete and will identify the additional information needed.
(3) The department must act on a complete application
within 60 days after it is received. The department may require more details
within 30 days of receipt of an initial application. In some cases another
60-day review period may be needed. If so, the department will explain to the
applicant why more time is needed:
(a) If the department fails to meet these deadlines,
the application for tax credit is considered approved;
(b) If the department requests additional data, the
review period will be extended until required data is received;
(c) During review, the department may ask for proof
that the AED complies with OAR 330-070-0010 through 330-070-0097. The
department may also ask for changes to allow the AED and application to comply
with these rules.
(4) To obtain the information needed to evaluate an
application or to verify eligibility and first year energy yield, the
department may, with the owner’s consent, inspect an installed AED:
(a) The department may deny a system certification or
request Department of Revenue (DOR) to initiate proceedings for the forfeiture
of a tax credit if an owner refuses to allow the department to inspect the AED;
(b) The department may require corrections to make the
AED or tax credit application comply with OAR 330-070-0010 through 330-070-0097
to be made within 30 days; and
(c) If such changes are not made within this time
limit, the department may reject the application.
(d) The department may use the results of utility
inspections in lieu of its own inspection.
(5) The department may reject any application if the
AED does not comply with ORS 469.160 through 469.180 and OAR 330-070-0010
through 330-070-0097. The department will explain all rejected applications in
writing. Approved requests for lesser cost than claimed by the applicant will
also include a written explanation of the basis for the determination.
(6) If the department rejects an application for system
certification or approves a certification for lesser cost than claimed by the
applicant, an applicant may appeal the rejection. The appeal must be filed
within 60 days of the mailing of the rejection notice by the department, in
accordance with ORS 183.310 through 183.500.
(7) If the department receives an application(s) for a
qualifying alternative fuel device accompanied by a letter from the applicant
designating an IOU or other qualifying party as the recipient of the tax credit
certificate, then the department may aggregate such applications and issue a
single tax credit certificate to designated qualifying party quarterly for
applications for projects to be completed in that calendar year.
Stat. Auth.: ORS 469
Stats. Implemented: ORS 469.160
Hist.: DOE 1-1982, f. 1-12-82, ef.
2-1-82; DOE 6-1983, f. 12-16-83, ef. 1-1-84; DOE 7-1984, f. & ef. 12-19-84;
DOE 1-1986, f. & ef. 2-7-86; DOE 2-1987, f. & ef. 5-13-87; DOE 4-1987,
f. 12-18-87, ef. 1-1-88; DOE 2-1989, f. 12-28-89, cert. ef. 1-1-90; DOE 1-1997,
f. 12-15-97, cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE
2-2001, f. 10-5-01, cert. ef. 10-8-01; DOE 1-2004, f. & cert. ef. 1-21-04;
DOE 16-2010, f. & cert. ef. 12-22-10
330-070-0045
Enforcement
(1) Applicant’s actions that are cause for revocation
of a residential alternate energy tax credit:
(a) A system certification may be revoked pursuant to
ORS 469.180 if the Director finds that:
(A) The applicant obtained the system certification as
a result of misrepresentation;
(B) The AED has not been installed or operated in
substantial compliance with the plans, specifications or procedures specified
in the application or certificate, such as:
(i) Failure to follow applicable standards;
(ii) Failure to comply with required codes or obtain
required permits or inspections;
(iii) Return of the AED to the seller or installer for
a refund;
(iv) Sale or removal of the device so that it no longer
operates on the property of the applicant; or
(C) The applicant refuses to allow the department to
inspect the AED after a reasonable written request by the department. A
reasonable request must allow applicant to choose a day within three weeks of
the request from the department.
(b) Following revocation, the applicant must forfeit
the tax credit, and the department of Revenue must proceed to collect any taxes
not paid by the taxpayer because of this credit.
(2) A technician’s tax credit certification may be
revoked pursuant to ORS 469.180 if the Director finds that:
(a) The system or technician tax-credit certification
was obtained by fraud or misrepresentation by the technician. The Director may
find that fraud or misrepresentation occurred if false statements were made
regarding the technician’s licenses held, products or warranties carried by the
tax-credit certified technician’s employing company, the company’s range of
product cost, personnel employed in the business, or any other item in the
application for technician tax-credit certification as defined in OAR
330-070-0026.
(b) The technician’s performance regarding sales or
installation of the alternative energy device for which the technician is
issued a tax credit certificate under ORS 469.170 does not meet industry
standards. The Director may find that the technician’s performance does not
meet industry standards under the following conditions:
(A) The technician’s employing company is not
registered with the Construction Contractors Board or does not carry the
required level of insurance, licensure or bonding; or
(B) The technician and/or employing company fails to
obtain the required state, federal or local permits required to install the AED
as defined in OAR 330-070-0040; or
(C) The technician fails to install the AED system in
compliance with standards adopted under OAR 330-070-0060 through 330-070-0097;
or
(D) The technician fails to install the AED system to
comply with manufacturers’ published specifications; or
(E) The technician and employing company fail to honor
contract provisions when there is no legitimate excuse for nonperformance of
the obligation; or
(F) The technician and employing company fail to honor
a warranty which they are contractually obligated to perform; and
(G) The technician and/or employing company fail to
make corrections to remedy failure to comply with paragraphs (A) through (G) of
this subsection requested by the department within 30 days of written
notification from the department of the problem, unless a time extension is
granted by the department.
(H) A tax credit for an AED sold or installed under the
technician tax-credit certification is ordered revoked under subsection (2)(a)
of this rule; or
(I) New information indicates that the AEDs installed
under the technician tax-credit certification and his or her employing company
does not meet eligibility requirements.
(c) The technician or employing company has
misrepresented to the customer either the tax credit program or the nature or
quality of the alternative energy device. The Director may find that the
technician or employing company has misrepresented the tax credit program or
the AED under the following conditions:
(A) The technician or employing company has provided
false or misleading information to the customer regarding the availability of
the tax credit, amount and nature of the tax credit, procedures for tax credit
application, eligibility standards for credit, or any other misleading
information about the program implemented under ORS 469.160 through 469.180; or
(B) The technician or employing company has
misrepresented the nature of the performance of the AED or claimed savings in
excess of those on a yield chart without providing accurate calculations to the
customer and to the department to substantiate the yield. For geothermal heat
pumps, the technician or employing company has claimed savings higher than
other units of similar efficiency; or
(C) The technician or employing company has
misrepresented the cost of a system. For example, the technician or employing
company omits costs in the contract for features necessary for basic
installation and/or operation of the system and/or costs to comply with the AED
eligibility under ORS 469.160 through 469.180; or
(D) The technician or employing company has
misrepresented a competitor’s product or service; and
(E) The technician or employing company fails to make
corrections requested in writing to the department to remedy violations of
(A)-(D) of this subsection within 30 days, unless more time is allowed by the
department; or
(F) The technician or employing company fails to remedy
the construction and/or warranty claim as directed by order of the Construction
Contractors Board.
Stat. Auth.: ORS 469
Stats. Implemented: ORS 469.180
Hist.: DOE 5-1978, f. & ef.
9-27-78; DOE 6-1979, f. & ef. 11-13-79; DOE 1-1982, f. 1-12-82, ef. 2-1-82;
DOE 6-1983, f. 12-16-83, ef. 1-1-84; DOE 1-1986, f. & ef. 2-7-86; DOE
4-1987, f. 12-18-87, ef. 1-1-88; DOE 1-1989, f. & cert. ef. 6-15-89; DOE
2-1989, f. 12-28-89, cert. ef. 1-1-90; DOE 1-1995, f. & cert. ef. 1-17-95;
DOE 1-1997, f. 12-15-97, cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef.
1-1-00; DOE 2-2001, f. 10-5-01, cert. ef. 10-8-01; DOE 1-2004, f. & cert.
ef. 1-21-04; DOE 2-2005, f. 12-30-05, cert. ef. 1-1-06; DOE 4-2006, f.
12-29-06, cert. ef. 1-1-07; DOE 16-2010, f. & cert. ef. 12-22-10
330-070-0055
Consumer Information
(1) A tax credit certified technician must inform the
owner in simple terms:
(a) How to tell if the device is running right. Who to
call if it is not;
(b) How to tell if the freeze protection is in effect.
Who to call if it is not;
(c) What maintenance is needed, annually and long term;
(d) Who will honor warranties; and
(e) The conditions of the warranties including but not
limited to how to start and keep warranties in force.
(2) A tax-credit certified technician or employing
company must provide all AED purchasers with a copy of materials listed in
section (1) of this rule prior to sale of the system.
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 1-1982, f. 1-12-82, ef.
2-1-82; DOE 6-1983, f. 12-16-83, ef. 1-1-84; DOE 7-1984, f. & ef. 12-19-84;
DOE 1-1986, f. & ef. 2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88; DOE
2-1989, f. 12-28-89, cert. ef. 1-1-90; DOE 1-1996, f. & cert. ef. 4-1-96; DOE
1-1997, f. 12-15-97, cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef.
1-1-00; DOE 2-2001, f. 10-5-01, cert. ef. 10-8-01; DOE 1-2004, f. & cert.
ef. 1-21-04; DOE 2-2005, f. 12-30-05, cert. ef. 1-1-06; DOE 16-2010, f. &
cert. ef. 12-22-10
330-070-0059
Solar Pool and Spa AEDs
(1) Installations must be of professional quality, be
installed according to manufacturer’s instructions; and comply with all
applicable state, county, or local codes and regulations.
(2) Consumers who purchase a solar water heating system
must receive written operating and maintenance instructions. These instructions
must at a minimum include:
(a) Clear instructions on how to monitor the system
performance;
(b) Description and recommended frequency of homeowner
maintenance;
(c) Diagram of the system noting location of valves and
monitoring devices; and
(d) What to do and who to call in an emergency and when
the system needs professional maintenance and repairs;
(3) Pool heating system designs and installations must
comply with the following additional requirements:
(a) Collectors and piping must be securely mounted to
withstand local wind loads;
(b) Piping and pump sizing must consider collector
area, total flow rates, pressure drop across collectors, length of run from
collectors to pump, and maximum allowable pressure drop for the system;
(c) Any building insulation disturbed due to the system
installation must be restored to previous condition;
(d) Pool collector materials must come with a minimum
10-year manufacturer’s full warranty (to ensure that equipment designed for
temporary installation is not used).
(e) System must have a method to show that it is
operating correctly. This equipment must be a permanent part of the system, not
require any special tools, and be in an easily accessible location.
(f) Collectors must be mounted in a manner to enable
seasonal drainage by gravity for proper freeze protection.
(g) Pool collectors must be equal to not less than 40
percent of the pool surface area if equipped with swimming pool blanket or not
less than 60 percent if no pool blanket is present.
(4) Spa heating system designs and installations must
comply with the following additional requirements:
(a) System design must be approved by the department.
Approval is based on complete system design documentation and calculation of
annual energy savings.
(b) Controls must be capable of maintaining safe spa
temperatures.
(c) Spa or hot tub must be insulated with not less than
R-15 perimeter and bottom insulation and have a cover rated to not less than
R-5.
(5) The department will provide technicians with a
means of estimating annual energy savings for a pool heating system. Spa
heating system performance will be determined on a case-by-case basis. For the
purposes of determining the tax credit, the annual energy savings will be
reduced by
(a) 25 percent if the total solar resource fraction for
the site is less than 75 percent, and by 100 percent if the total solar
resource fraction for the site is less than 50 percent for systems installed
prior to January 1, 2011.
(b) 100 percent if the total solar resource fraction
for the site is less than 75 percent for systems installed on or after January
1, 2011.
(6) The costs listed in subsection (7)(a) through (h)
of this rule do not include all eligible costs. Other costs will qualify if
justified to the department’s satisfaction as part of a solar water heating
AED. Only total systems will qualify for the tax credit. All systems must
comply with OAR 330-070-0010 through 330-070-0097.
(7) Eligible costs include:
(a) The cost of solar collectors;
(b) The cost of thermal storage devices;
(c) The cost of monitors, meters and controls;
(d) The cost of photovoltaic devices used to supply
electricity to parts of the system;
(e) Installation charges;
(f) Fees paid for design or building;
(g) The cost of swimming pool blankets, if they are
installed with a solar pool heating system; and
(h) Up to $200 of the cost of solar access easements. A
certified copy of the recorded easement and proof of the cost must be submitted
with an application.
(8) The addition of more energy producing capacity to
an existing solar pool heating system may be eligible for an AED tax credit if:
(a) The system addition increases first year energy yield;
and
(b) The system addition is built, installed and
operated in accord with OAR 330-070-0010 through 330-070-0097.
(9) The department will calculate first year energy
yield of a system addition by subtracting the estimated savings of the original
AED from the increased first year energy yield with the addition.
(a) The department will not recalculate the original
AED’s estimated energy savings, even if the AED produces less than estimated.
(b) Any AED which received an AED tax credit in a prior
year shall be assumed to remain in place, for purposes of calculating a tax
credit for a system addition.
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 1-2004, f. & cert.
ef. 1-21-04; DOE 2-2005, f. 12-30-05, cert. ef. 1-1-06; DOE 4-2006, f.
12-29-06, cert. ef. 1-1-07; DOE 4-2007, f. 11-30-07, cert. ef. 12-1-07; DOE
16-2010, f. & cert. ef. 12-22-10
330-070-0060
Solar Domestic Water Heating AEDs
(1) Installations must be of professional quality,
comply with all applicable state, county, or local codes and regulations and be
verified by a tax-credit certified solar technician.
(2) Consumers who purchase a solar water heating system
must receive written operating and maintenance instructions. These instructions
must be plainly mounted/displayed on or near the solar storage or backup
water-heating tank. These instructions must at a minimum include:
(a) Clear instructions on how to determine if the
system is functioning properly;
(b) Description and recommended frequency of homeowner
maintenance;
(c) Diagram of the system noting location of valves and
monitoring devices;
(d) What to do and who to call in an emergency and when
the system needs professional maintenance and repairs; and
(e) How to protect the system from overheating due to
stagnation during periods when the system is not in use during the summer
months.
(3) System designs and installations must comply with
the following additional requirements:
(a) Collectors and piping must be securely mounted to
withstand local wind loads;
(b) Piping and pump sizing must consider collector
area, total flow rates, pressure drop across collectors, length of run from
collectors to pump, and maximum allowable pressure drop for the system;
(c) Pipe insulation must be installed on all solar pipe
runs and protected against damage from exposure in outdoor conditions and be
rated for design condition temperatures;
(d) Any building insulation disturbed due to the system
installation must be restored to previous condition;
(e) For systems using pressurized anti-freeze fluids, a
pressure gauge must be installed to indicate pressure in the system; and
(f) Piping containing pressurized water in attics 24
hours a day must be of the appropriate material allowed by applicable Oregon
plumbing codes. A minimum number of fittings must be used in the attic, and the
fittings shall be copper or brass.
(g) Pipe materials (e.g. copper, PEX, polybutylene)
must be capable of handling the temperature ranges that they will be exposed to
(e.g. freezing or collector stagnation).
(4) Freeze protection must be provided for systems
where the heat transfer fluid may freeze. The freeze protection method must
follow these rules:
(a) The method must be clearly stated in the owner’s
manual.
(b) The method must work in the absence of utility
electric power.
(c) Systems using tanks, piping, pumps and other
components containing water in unheated spaces must be adequately protected
from freezing.
(d) Recirculation is not an acceptable freeze
protection measure, unless the collector used is a heat pipe type.
(e) Drain-down or manual drain systems are not
acceptable freeze protection methods for solar domestic water heating systems.
(f)
Thermosyphon systems may not connect power to the electric element in
roof-mounted tanks as a freeze protection or backup measure.
(5) The annual energy requirement for domestic water
heating must be reduced by setting the water heater thermostat to 120 degrees
F.
(6) A method to show that the system is operating
correctly must be provided.
(a) For passive systems this must be a thermometer in
line between solar storage and backup tank.
(b) For an active system this must be a flow meter in
the supply line to the collectors and a thermometer on the outlet port of the
solar storage tank.
(c) Equipment meeting this requirement must:
(A) Be a permanent part of the system;
(B) Not require any special tools or equipment to
monitor; and
(C) Be in an accessible location.
(7) The costs listed in subsection (8)(a) through (j)
of this rule do not include all eligible costs. Other costs will qualify if
justified to the department’s satisfaction as part of a solar water heating
AED. Only total systems will qualify for the tax credit.
(8) Eligible costs include:
(a) The cost of solar collectors;
(b) The cost of thermal storage devices;
(c) The cost of ductwork, piping, fans, pumps and
controls that move heat from solar collectors to storage and to heat buildings;
(d) The cost of monitors, meters and controls;
(e) The cost of photovoltaic devices used to supply
electricity to parts of the system;
(f) Installation charges;
(g) Fees paid for design or building;
(h) The cost of swimming pool blankets, if they are
installed with a solar pool heating system;
(i) The cost of hot water conservation measures
installed with a water heating AED; and
(j) Up to $200 of the cost of solar access easements. A
certified copy of the recorded easement and proof of the cost must be submitted
with an application.
(9) The department will provide a table of estimated
annual energy savings or “yield chart” for most OG-300 systems common to Oregon
and R&D systems. Annual energy savings will be based on the annual
performance simulations provided by the SRCC modified for conditions required
under state law. Yields must be developed for each of the three weather zones
defined by ODOE and updated at least annually.
(a) OG-300 systems that meet the department’s approval
do not have to be on the yield chart if there has been no request by a
tax-credit certified technician that they appear on the yield chart.
(b) For the purposes of determining the tax credit, the
annual energy savings will be reduced by:
(A) 25 percent if the total solar resource fraction for
the site is less than 75 percent, and by 100 percent if the total solar
resource fraction for the site is less than 50 percent for systems completed
prior to January 1, 2011.
(B) 100 percent if the total resource fraction is less
than 75 percent for systems completed on or after January 1, 2011.
(10) All systems must meet the standards established by
the SRCC OG-300 system certification in effect at the time the rules are
adopted, or equivalent requirements as determined by the Director.
(a) Prior to January 1, 2011, temporary authorization
will be granted to non-OG-300 systems under a special “Research &
Development” status. The department will extend this temporary authorization
for up to 12 systems of a specific design. The solar technician will need to
submit a complete copy of the system design and operation documents provided to
the consumer to the department for approval. The department shall determine
that such system will perform well under the conditions it is designed for and
will likely last in excess of 15 years without replacement of major components.
Tax credit amounts under this status will be determined by the department based
on 90 percent of the estimated annual energy output. On or after January 1,
2011, the temporary authorization provided in this section expires.
(b) Prior to January 1, 2011, temporary authorization
may be extended to non-OG-300 systems under an “OG-300 Applicant” status
providing the system manufacturer is currently applying for OG-300
certification from SRCC. The department will extend an unlimited quantity of
systems to be installed in a 12-month period, providing the department has
reviewed a copy of the SRCC application and determined it to be reasonably
likely to achieve OG-300 certification within the 12-month period.
(c) On or after January 1, 2011, temporary
authorization may be extended to non-OG-300 systems under an “OG-300 Applicant”
status the system must comply with all local codes and the manufacturer must
have submitted an application to the SRCC for OG-300 certification. The department
must review and approve a copy of the SRCC application including the operations
manual prior to the installation of the system.
(11) All technician tax-credit certified-installed
systems must:
(a) Include an O&M manual which specifies
installation instructions, operation instructions, maintenance plan, fluid
quality, service and replacement parts, hazards, and warranty coverage;
(b) Provide clear labeling of on/off/bypass controls
and safety issues;
(c) Have a means of indicating proper operation of the
solar water heating system (flow indicators/meter or thermometers);
(d) Be installed to meet local building codes; and
(e) Have a tempering valve to prevent greater than 120
degree F. water downstream of the valve.
(12) Systems shall be installed with the OG-300
certification sticker located on the manual cover. The manual and any
supporting documentation shall be placed in a waterproof, clear plastic bag
located on or near the solar or domestic hot water heater.
(13) Owner-built and site-built domestic water heating
systems are exempt from the testing requirements. The department will evaluate
the system design and assign it a yield based on 50 percent of its estimated
annual energy performance.
[Publications: Publications
referenced are available from the agency.]
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 12(Temp), f. & ef.
10-14-77; DOE 3-1978, f. & ef. 3-7-78; DOE 5-1978, f. & ef. 9-27-78;
DOE 6-1979, f. & ef. 11-13-79; DOE 1-1982, f. 1-12-82, ef. 2-1-82; DOE
6-1983, f. 12-16-83, ef. 1-1-84; DOE 7-1984, f. & ef. 12-19-84; DOE 1-1986,
f. & ef. 2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88; DOE 1-1989, f. &
cert. ef. 6-15-89; DOE 2-1989, f. 12-28-89, cert. ef. 1-1-90; DOE 1-1995, f.
& cert. ef. 1-17-95; DOE 1-1996, f. & cert. ef. 4-1-96; DOE 1-1997, f.
12-15-97, cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE
2-2000, f. 12-29-00, cert. ef. 1-1-01; DOE 2-2001, f. 10-5-01, cert. ef.
10-8-01; DOE 1-2004, f. & cert. ef. 1-21-04; DOE 2-2005, f. 12-30-05, cert.
ef. 1-1-06; DOE 4-2006, f. 12-29-06, cert. ef. 1-1-07; DOE 4-2007, f. 11-30-07,
cert. ef. 12-1-07; DOE 16-2010, f. & cert. ef. 12-22-10
330-070-0062
Passive Solar Space Heating AEDs
(1) Installations must be of professional quality and
comply with all applicable state, county or local codes and regulations.
(2) The estimated first year energy yield must be the
net usable energy produced under average environmental conditions in one year.
(3) Passive solar space heating systems must produce
energy savings equal to not less than 20 percent of the annual energy used for
space heating in the dwelling to be eligible for a tax credit. Such systems
must:
(a) Have sufficient solar access, not jeopardized by
future buildings or tree growth;
(b) Provide usable heat for the heated space;
(c) Provide adequate thermal storage for solar heat
gained;
(d) Prevent overheating of the heated space that
requires mechanical space cooling; and
(e) In addition, sunspaces must:
(A) Have no backup heating device; and
(B) Be able to be isolated from the heated space.
(4) Determination of annual performance shall be based
on one of the following approved methods:
(a) Using the department’s prescriptive passive solar
heating path to achieve 20 percent savings.
(b) Annual hourly simulation using an approved energy
modeling software (e.g.Energy-10).
(c) Monitored data from system before and after
installation of AED.
(5) Solar device costs eligible for passive space
heating systems include:
(a) The cost of mass or water walls for thermal
storage;
(b) The cost of movable window insulation that is part
of a passive system. It must tightly seal on all sides of the window. It must
also have an R- value of at least three;
(c) The cost of south-facing windows, if the requirements
of section (4) of this rule are met; and
(d) The cost of passive heat distribution components.
(6) The department will use data supplied by the
applicant to determine if the requirements of OAR 330-070-0022 are met.
[Publications: Publications referenced
are available from the agency.]
Stat. Auth.: ORS 469
Stats. Implemented: ORS 469.170
Hist.: DOE 1-1986, f. & ef.
2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88; DOE 1-1989, f. & cert. ef.
6-15-89; DOE 2-1989, f. 12-28-89, cert. ef. 1-1-90; DOE 1-1997, f. 12-15-97,
cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE 2-2001, f.
10-5-01, cert. ef. 10-8-01; DOE 1-2004, f. & cert. ef. 1-21-04; DOE 2-2005,
f. 12-30-05, cert. ef. 1-1-06; DOE 16-2010, f. & cert. ef. 12-22-10
330-070-0063
Combined Active Solar Space and
Domestic Water Heating AEDs
(1) Installations must be of professional quality, made
to manufacturer’s instructions, comply with all applicable state, county and
local codes and regulations, and be verified by a tax-credit certified solar
technician.
(2) Active solar space heating systems must produce
energy savings equal to not less than 15 percent of the annual energy used for
space heating in the dwelling to be eligible for a tax credit.
(3) The estimated first-year energy savings shall be
based on the following:
(a) The house design prior to installation of the solar
energy equipment, not a base code design or reference design.
(b) The total energy savings from both space heating
and domestic hot water heating, with not less than 50 percent of the savings
coming from solar heating.
(c) An annual solar utilization calculation method
approved by the Director that accounts for the operating temperature of the
energy storage and collector system and gives no credit for any insulation
measures not directly associated with the solar AED.
(d) Typical residential occupancy setpoints and
operating behavior. Savings will not be granted for consumer behavior options,
with the exception of nighttime window insulation which will be evaluated at 50
percent of maximum effectiveness.
(4) Applicant must provide the following information:
(a) Complete system design documentation with component
list and controls sequence;
(b) Annual estimated savings calculations; and
(c) Solar equipment specifications and performance test
data.
(5) Solar device costs eligible for the tax credit for
active space heating systems include:
(a) The cost of solar collectors;
(b) The cost of thermal storage devices;
(c) The cost of ductwork, piping, fans, pumps and
controls that move heat from solar collectors to storage and to heat buildings;
(d) The cost of monitors, meters, and controls;
(e) The cost of photovoltaic devices used to supply
electricity to parts of the system;
(f) Installation charges; and
(g) Fees paid for design or building.
(6) The department will use data supplied by the
applicant to determine if the requirements of OAR 330-070-0022 are met.
[Publications: Publications
referenced are available from the agency.]
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 1-1986, f. & ef.
2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88; DOE 1-1996, f. & cert. ef.
4-1-96; DOE 1-1997, f. 12-15-97, cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99,
cert. ef. 1-1-00; DOE 2-2001, f. 10-5-01, cert. ef. 10-8-01; DOE 1-2004, f.
& cert. ef. 1-21-04; DOE 2-2005, f. 12-30-05, cert. ef. 1-1-06; DOE
16-2010, f. & cert. ef. 12-22-10
330-070-0064
Photovolatic AEDs
(1) Installations must be professional quality, comply
with all applicable Oregon codes and be verified by a tax-credit certified
solar technician.
(2) A photovoltaic tax credit for a system installed on
or after November 4, 2005, shall be limited to $6,000 per PV system. The amount
of the credit shall be based on $3 per watt of installed output. The maximum
tax credit given in a calendar year is $1,500. If a system results in a tax
credit larger than $1,500, the remainder will be applied on to the subsequent
year until either the $6,000 limit or the total tax credit is provided.
(3) System size shall be determined by the sum of all
the photovoltaic module DC wattage ratings under standard test conditions
(STC).
(4) The minimum system size must be 200 Watts DC output
under STC.
(5) Photovoltaic AED costs eligible for the tax credit
include the cost of:
(a) Photovoltaic modules;
(b) Inverters;
(c) Storage systems and regulators;
(d) Monitors, meters, and controls;
(e) Wiring and framing materials;
(f) Trackers;
(g) Installation charges; and
(h) Permits and fees, including up to $200 of the cost
of solar access easements. A certified copy of the recorded easement and proof
of the cost must be submitted with an application.
(6) For the purposes of determining the tax credit, the
annual energy savings will be reduced by:
(a) 25 percent if the total solar resource fraction for
the site is less than 75 percent and by 100 percent if the total solar resource
fraction for the site is less than 50 percent for projects completed prior to
January 1, 2011.
(b) 100 percent if the total solar resource fraction
for the site is less than 75 percent for projects completed on or after January
1, 2011.
[Publications: Publications
referenced are available from the agency.]
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 1-2004, f. & cert.
ef. 1-21-04; DOE 2-2005, f. 12-30-05, cert. ef. 1-1-06; DOE 4-2006, f.
12-29-06, cert. ef. 1-1-07; DOE 4-2007, f. 11-30-07, cert. ef. 12-1-07; DOE
16-2010, f. & cert. ef. 12-22-10
330-070-0070
Ground-Source Heat Pump
(1) Only total systems will qualify for a tax credit.
All systems must comply with OAR 330-070-0025 and 330-070-0040 and be of closed
loop design and operation. See also OAR 330-070-0027.
(2) Systems must limit waste of the resource.
(3) Systems must not have adverse effects on:
(a) Other systems; and
(b) Water quality applying the standards of the
Department of Environmental Quality.
(4) Systems must not create hazards such as:
(a) Steam or water vapor;
(b) Vapors or odors;
(c) Noise; and
(d) Hazardous wellhead design.
(5) System parts must have adequate:
(a) Structural strength;
(b) Resistance to weather and fire;
(c) Ease of upkeep; and
(d) Durability.
(6) No system will cause harmful physical effects on
people or unwanted tastes or odors.
(7) Some heat transfer fluids need special handling.
These include toxic, corrosive, and explosive fluids. Such fluids shall only be
used when the system is designed to safely handle them.
(8) Under normal operation, any part of a system that
may be touched by people must be cooler than 141 degrees F. If this cannot be
done, any part that reaches more than 140 degrees F. must have warning labels.
Each system must include a device to limit water for domestic use to 140
degrees F.
(9) Each system and nearby structures must be protected
against pressures, vacuums and temperatures.
(10) Systems must fully protect drinking water as
specified in the Oregon Plumbing Specialty Code.
(11) Systems must use storage tanks built by accepted
methods. Each tank must be tested for leaks.
(12) Expansion and contraction due to changing heat
levels must not cause undue strain or distortion.
(13) Systems that use heat transfer fluids that may
freeze must have freeze protection.
(14) Systems must use accepted methods to guard against
the known corrosion/scaling level of the water.
(15) Systems must also be designed for the least effect
on groundwater.
(16) Ground loop systems must cover enough ground to
meet total annual heating requirements, as required by manufacturers’
recommended design standards. Ground loops used for cooling must restore soil
moisture.
(17) Downhole heat exchangers (direct use geothermal
systems) must include a summary report from Oregon Institute of Technology or
other source approved by the Director which describes the system and indicates
that it will deliver sufficient heat and the design meets current good practice
guidelines. They will be reviewed on a case-bycase basis.
(18) The system COP must be at least 3.3 for closed
loop systems and 3.5 for direct expansion (DX) systems, including energy used
by pumps. COP shall be determined by the following methods:
(a) For water source heat pumps, the COP must be
determined in accordance with ARI Standard 325-85, at an entering water
temperature of 50 degrees F.
(b) For water source or ground loop heat pumps using
ambient surface water as an energy source and for solar assisted heat pumps,
the COP must be the measured ratio of the heating season energy output divided
by the heating season energy input. Both energy values must be expressed in the
same units.
(19) All other types of ground source heat pumps must
be reviewed on their COP.
(20) Bermed or earth covered buildings will not qualify
for the geothermal tax credit.
(21) All ground source heat pumps must include setting
the water heater thermostat to 120 degrees F as a hot water conservation
measure.
(22) A ground source heat pump system may receive a
supplemental tax credit amount, determined by the department, based on
additional energy savings, if the duct system to which it is attached is tested
and certified in accordance with the protocols specified in Section
330-070-0073(9)(a) through 330-070-0073(9)(g). This amount is in addition to
the tax credit amount for the ground source heat pump system itself, and in
addition to the tax credit amount provided for the duct testing and
certification itself. In order to earn the supplemental tax credit amount, the
ground source system must be installed, the duct system must be tested and
certified, and the applications for all tax credit amounts associated with the
system must be received, as a single package, by the department by April 1st of
the tax year following the tax year for which the credits are being claimed.
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 12(Temp), f. & ef.
10-14-77; DOE 3-1978, f. & ef. 3-7-78; DOE 5-1978, f. & ef. 9-27-78;
DOE 6-1979, f. & ef. 11-13-79; DOE 1-1982, f. 1-12-82, ef. 2-1-82; DOE
6-1983, f. 12-16-83, ef. 1-1-84; DOE 1-1986, f. & ef. 2-7-86; DOE 4-1987,
f. 12-18-87, ef. 1-1-88; DOE 1-1989, f. & cert. ef. 6-15-89; DOE 2-1989, f.
12-28-89, cert. ef. 1-1-90; DOE 1-1996, f. & cert. ef. 4-1-96; DOE 1-1997,
f. 12-15-97, cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE
2-2001, f. 10-5-01, cert. ef. 10-8-01; DOE 1-2004, f. & cert. ef. 1-21-04;
DOE 4-2006, f. 12-29-06, cert. ef. 1-1-07; DOE 7-2008, f. 10-31-08, cert. ef.
11-1-08; DOE 16-2010, f. & cert. ef. 12-22-10
330-070-0073
Energy-Efficient Appliances and
Alternative Fuel Devices
(1) Energy-efficient appliances must meet or exceed the
following energy efficiency ratings, as measured in accordance with current
United States Department of Energy (USDOE) test procedures where applicable,
and be currently listed with the department as qualifying premium efficiency
appliances. In the event that the same model number has more than one energy
efficiency rating, one of which is non-qualifying, all units with that model
number will be declared ineligible and removed from the department’s qualifying
list of premium efficiency appliances. Models declared ineligible due to
multiple energy efficiency ratings may be reinstated upon demonstration by the
manufacturer that the problem has been remedied, but not earlier than 12 months
from the time of removal from the list.
(2) Where USDOE test procedures do not exist, the
department will designate a nationally recognized test procedure that will
apply instead.
(3) Clothes washers.
(a) For the purpose of this program, clothes washer
efficiency performance is determined using the USDOE Appendix J1 test procedure
for residential clothes washers in effect at the time the rules are adopted.
(b) Clothes washers purchased on or after:
(A) April 1, 2007 and prior to January 1, 2011 must
have a minimum Modified Energy Factor (MEF) of 2.0 ft3/kWh/cycle and a maximum
Water Factor (WF) of 6.4 gal/ ft3/cycle.
(B) January 1, 2011 must have a minimum Modified Energy
Factor (MEF) of 2.2 ft3/kWh/cycle and a maximum Water Factor (WF) of 4.5 gal/
ft3/cycle.
(c) Equipment efficiency requirements are based on
ENERGY STAR® listing or other third-party certified list approved by the
department.
(4) Refrigerator-Freezers.
(a) Refrigerator-Freezers purchased:
(A) prior to January 1, 2011 must have at least 20
percent lower energy consumption than that allowed by the July 1, 2001 USDOE
standard for refrigerator/freezers;
(B) on or after January 1, 2011 must have at least 30
percent lower energy consumption than that allowed by the July 1, 2001 USDOE
standard for refrigerator/freezers.
(b) Must have a total net volume (sum of the fresh food
compartment and freezer compartment volumes) of at least 12 cubic feet, but
less than 31 cubic feet; and
(c) Must have a fully automatic defrost cycle.
(d) Equipment efficiency requirements are based on
listing by ENERGY STAR® or other third-party certified list approved by the
Director.
(5) Dishwashers.
(a) Dishwashers purchased on or after:
(A) January 1, 2008 and prior to January 1, 2011 must
have an Energy Factor of 0.70 cycles/kWh or higher;
(B) January 1, 2011, standard dishwashers as defined by
ENERGY STAR®, must have an Energy Factor of at least 0.75 cycles/kWh or higher;
and compact dishwashers, as defined by ENERGY STAR®, must have an Energy Factor
of at least 1.00 cycles/kWh or greater.
(b) Dishwashers must have tax credit eligibility based
on an Energy Factor derived from the DOE Dishwasher Test Procedure effective
September 28, 2003.
(c) Equipment efficiency requirements are based on by
ENERGY STAR® listings or other third-party certified list approved by the
Director.
(6) Water Heating Appliances.
(a) Water heater efficiency requirements:
(A) Equipment efficiency requirements for units of
nominal 1-ton or less capacity are based on listing by ENERGY STAR® or
California Energy Commission or on the USDOE Energy Factor, as derived from the
USDOE Appendix E test procedure for residential water heating equipment in
effect at the time the rules are adopted. Efficiency requirements for units
larger than 1-ton in capacity and smaller than 6-tons in capacity, are based on
the system COP at 47 degrees F outdoor air temperature or other rating point
appropriate for the system deemed equivalent by the department.
(B) Electric units of nominal 1-ton or less shall have
an Energy Factor not less than 1.0; units with capacity greater than 1-ton and
less than 6-tons shall have a COP rating of not less than 2.5.
(C) Natural gas, propane, or oil-fired residential
storage type water heaters, as defined by Title 10, Code of Federal
Regulations, Chapter 11, Part 430, Subpart B, Appendix E, must have an Energy
Factor of 0.80 or greater as tested with natural gas fuel.
(D) Whole-home gas fired instantaneous water heaters,
as defined by Title 10, Code of Federal Regulations, Chapter 11, Part 430,
Subpart B, Appendix E, must have:
(i) an Energy Factor of at least 0.80, a maximum firing
rate of at least 140,000 Btu/hour and a minimum firing rate no higher than
24,000 Btu/hour if installed prior to January 1, 2011;
(ii) an Energy Factor of at least 0.82 or greater if
installed on or after January 1, 2011.
(E) Equipment efficiency requirements are based on
either the listing by ENERGY STAR®, the directory of the Air-Conditioning,
Heating, and Refrigeration Institute (AHRI), or other third-party certified
list approved by the Director.
(b) Combined space/water-heating system efficiency must
be based on the water heating Energy Factor for Combined Systems (CEF) as
derived from the American National Standards Institute/American Society of
Heating, Refrigerating, and Air Conditioning Engineers (ANSI/ASHRAE) 124-1991
test method. Water heaters that are part of a combined space and water heating system
may not receive a tax credit for space heating efficiency as a boiler in
addition to the tax credit as a water heating appliance.
(7) For Wastewater Heat Recovery Systems, field
performance data submitted to and approved by the department must be the basis
for tax credit qualification. The following rules also apply:
(a) The systems must meet all plumbing code
requirements for vented double-wall heat exchangers;
(b) The system must not interfere with the proper
operation of the dwelling’s wastewater system; and
(c) Energy recovered must be re-introduced into the
dwelling’s hot water supply system.
(8) Performance Checked Space Conditioning Duct Systems
must meet the following requirements:
(a) All work must be done in accordance with
Performance Tested Comfort Systems (PTCS) specifications, a regionally
developed set of protocols with provisions for testing and sealing duct work
that is maintained by the Regional Technical Forum (RTF), as adopted by the RTF
and in effect at the time the work is performed.
(b) If the home serviced by the performance checked
duct system is new, or the building envelope is being altered, the house must
meet residential energy conservation requirements of the Oregon Structural
Specialty Code or of the Oregon One and Two Family Dwelling Code in effect at
the time the home is constructed or structurally altered.
(c) Duct leakage must be tested in accordance with
Performance Tested Comfort Systems (PTCS) approved testing protocols.
(d) Testing to verify that these standards have been
achieved must be conducted by technicians approved by the department.
(e) Measures eligible for the purpose of calculating a
performance checked duct system tax credit include:
(A) New construction.
(i) Duct sealing labor and materials;
(ii) Heating and cooling load calculations;
(iii) Duct system sizing and design calculations;
(iv) Labor and materials for installing multiple
returns;
(v) Labor and materials for installing passive pressure
relief grilles;
(vi) Duct testing; and
(vii) Labor and materials for bringing duct systems
inside heated space.
(B) New ducts in existing homes.
(i) Duct sealing labor and materials;
(ii) Heating and cooling load calculations;
(iii) Duct system sizing and design calculations;
(iv) Labor and materials for installing multiple
returns;
(v) Labor and materials for installing passive pressure
relief grilles; and
(vi) Duct testing.
(C) Duct repair and sealing/existing ducts in existing
homes.
(i) Duct sealing labor and materials;
(ii) Labor and materials for installing multiple
returns;
(iii) Labor and materials for installing passive
pressure relief grilles; and
(iv) Duct testing.
(f) To apply for a performance checked duct tax credit,
the following information must be submitted in a form approved by the
department:
(A) Application form;
(B) Test results worksheet for “new construction,” “new
duct systems in existing homes,” or “duct repair and sealing”/existing ducts in
existing homes, as applicable; or inclusion of the PTCS identification number
associated with the measure being submitted for tax credit on the application
form.
(C) Copies of heating and cooling load calculations
and/or duct sizing calculations, as applicable, shall be made available to the
department upon request; and
(D) Itemized invoice identifying measures detailed in
(e).
(g) The amount of the tax credit for performance
checked duct systems must be 25 percent of the eligible costs detailed in (e),
up to $250.
(9) Performance Checked Heat Pumps and Central Air
Conditioners must meet the following standards:
(a) Systems must be tested and serviced as needed to
confirm correct refrigerant charge and air flow by technicians certified by the
department and by an approved Performance Tested Comfort System (PTCS)
provider.
(b) Testing shall be in accordance with PTCS
specifications, a regionally developed set of protocols with provisions for
testing the operation of air-source heat pumps and air conditioners that are
maintained by the Regional Technical Forum (RTF), as adopted by the RTF and in
effect at the time the work is performed.
(c) To verify electronically commutated motor (ECM)
installation results, the wattage of the existing fan motor and new ECM fan
motor must be measured using a wattmeter or by clocking the revenue meter using
the following procedure:
(A) Turn off all circuit breakers except the breaker to
the AC/HP air handler.
(B) Turn on the air handler fan (cooling speed).
(C) At the meter, use a stopwatch, and for a period of
at least 90 seconds, count the number of revolutions of the wheel. Record
seconds and number of revolutions.
(D) Record meter data: kWh and multiplier if any.
(E) Calculate the watt draw of the fan: Watts = [kWh x
number of revolutions x multiplier x 3600]/seconds.
(d) Eligible measures must be confirmed by the system
diagnostic tests using PTCS protocols in use at the time of measure
installation. Duplicate tax credits may not be claimed.
(e) Measures eligible for the purpose of calculating a
performance checked heat pump/air conditioner tax credit include:
(A) System diagnostic tests;
(B) Adding or removing refrigerant when initial
diagnostic tests indicate need for refrigerant adjustment and post repair tests
indicate correct charge has been installed;
(C) Altering the duct system to improve air flow when
initial diagnostic tests show low air flow and post repair tests show an air
flow improvement of 10 percent or more;
(D) Cleaning the inside coil when initial diagnostic
tests indicate low air flow and post repair tests show an air flow improvement
of 10 percent or more;
(E) Replacing an existing inside fan motor with an
electronically commutated motor (ECM) when initial diagnostic tests show low
air flow and tests after ECM installation show an air flow improvement of 10
percent or more; and
(F) Control modifications necessary for the system to
pass the diagnostic test.
(f) To apply for a performance checked heat pump/air
conditioner tax credit, the following information must be submitted in a form
approved by the department:
(A) Application form;
(B) Performance checked heat pump/AC diagnostics data
entry form;
(C) Pre and post repair system air flow measurements
using approved methods listed in (b), if applicable;
(D) Watt draw of existing fan motor and new ECM, if
applicable; and
(E) Itemized labor and materials cost information for
applicable measures, testing, and repairs.
(g) The amount of the performance checked heat pump/AC
tax credit must be 25 percent of the cost of testing and modifications to
existing equipment, up to $250.
(10) Alternative Fuel Vehicles must have equipment
installed to make the vehicle capable of storing and utilizing an alternative
fuel for vehicle propulsion. Equipment may consist of original equipment
manufacturer components; or
(a) Components for natural gas powered vehicles that
meet EPA1-A requirements current at the time these rules are adopted; or
(b) Components for hybrid vehicles must provide the
hybrid vehicle with a combination of power between propulsion energy systems
such that the peak power ratio of the vehicle is 0.10 or greater; or
(c) Other components as recognized by the department as
necessary for alternative fuel use.
(d) Those applying for alternative fuel vehicle tax
credits must acknowledge that they do not intend to transfer ownership of the
vehicle to a non-Oregon resident for a period of one year.
(11) Alternative Fuel Fueling Systems must be installed
to meet all state and local fire and life safety codes and be capable of
re-fueling /recharging an alternative fuel vehicle within 14 hours. The
following rules also apply:
(a) On-board charging systems that feed into the
rechargeable energy storage system in a hybrid vehicle must be high-voltage
systems of 100 Volts or higher that have an active regenerative braking system
integrated into the recharging system of the hybrid vehicle; and
(b) The use of an on-board charging system on a hybrid
vehicle must result in significant energy savings as determined by the
Director.
(12) Energy Recovery Ventilators (ERVs) must:
(a) Be tested, rated and certified through the Home
Ventilating Institute (HVI) Division of the Air Movement and Control
Association (AMCA) International, Inc., and listed in the HVI directory;
(b) Be capable of at least 30 percent Latent
Recovery/Moisture Transfer (LRMT) at 32°F when operating on the lowest fan
speed;
(c) Have a maximum EUI(HERV) of 1.5 watts/cfm at the
lowest fan speed for which performance data is published in the HVI directory;
and
(d) Have a minimum Sensible Recovery Efficiency (SRE)
of:
(A) 65 percent at 32°F/0°C when operating at the lowest
fan speed;
(B) 60 percent at 32°F/0°C when operating at the
highest fan speed; and
(C) 60 percent at -13°F/-25°C when operating at the
lowest fan speed, if rated at this condition.
(13) Heat Recovery Ventilators must:
(a) Be tested, rated and certified through the Home
Ventilating Institute (HVI) Division of the Air Movement and Control
Association (AMCA) International, Inc., and listed in the HVI directory;
(b) Have a maximum EUI of 1.5 watts/cfm at the lowest
fan speed for which performance data is published in the HVI directory; and
(c) Have a minimum Sensible Recovery Efficiency (SRE)
of:
(A) 65 percent at 32°F/0°C when operating at the lowest
fan speed;
(B) 60 percent at 32°F/0°C when operating at the
highest fan speed; and
(C) 60 percent at -13°F/-25°C when operating at the
lowest fan speed, if rated at this condition.
(14) Very High Efficiency Air Conditioning Systems must:
(a) Be a central, split-system designed and installed
to operate in conjunction with the air handling unit or furnace of a home’s
heating system;
(b) Be tested and rated in accordance with the DOE test
procedure for residential air-conditioning systems in effect at the time these
rules are adopted, and certified by, and listed in the directory of the Air
Conditioning Heating and Refrigeration Institute (AHRI) in effect at the time
these rules are adopted;
(c) Consist of a matched outdoor unit and indoor unit
(air handler and coil or furnace and coil), as tested, rated and listed in the
directory of the Air-Conditioning, Heating, and Refrigeration Institute (AHRI);
(d) Have a minimum EER rating at DOE standard test
condition “A” conditions of 13.0; and
(e) Be installed in accordance with the protocols
specified in section 330-070-0073(9)(a) through 330-070-0073(9)(g) of these
rules.
(15) Very High Efficiency Air Source Heat Pump Systems
must:
(a) Be tested and rated in accordance with the USDOE
Appendix M test procedure for residential air-conditioning systems in effect at
the time these rules are adopted, and be certified by, and be listed in the directory
of the Air-Conditioning, Heating, and Refrigeration Institute (AHRI) that is in
effect at the time these rules are adopted;
(b) Consist of a matched outdoor unit and indoor unit
(air handler and coil or furnace and coil), as tested, rated and listed in the
directory of the Air-Conditioning, Heating, and Refrigeration Institute (AHRI);
(c) Have a minimum DOE Region IV HSPF rating of 9.0 or
greater;
(d) Have a minimum EER rating at DOE’s standard test
condition “A” of at least 12.0; and
(e) Be installed in accordance with the protocols
specified in section 330-070-0073(9)(a) through 330-070-0073(9)(g) of these
rules.
(16) Very High Efficiency Warm Air Furnace Systems
must:
(a) Be tested and rated in accordance with the USDOE
Appendix N test procedure for furnaces in effect at the time these rules are
adopted, and be certified by and listed in the directory of the
Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in effect at the
time these rules are adopted;
(b) Have a minimum AFUE rating:
(A) of 0.90 (90 percent) for installations completed
prior to January 1, 2009;
(B) of 0.92 (92 percent) for installations completed on
or after January 1, 2009 and prior to January 1, 2011;
(C) of 0.94 (94 percent) for installations completed on
or after January 1, 2011.
(c) Use ducted outdoor air for combustion; and
(d) Must be listed in the Air-Conditioning, Heating,
and Refrigeration Institute (AHRI) directory of Certified Energy Rating in
effect at the time these rules are adopted as an “e” “electrically efficient”
furnace. The “e” electrically efficient designation applies to furnaces whose
electricity consumption is 2 percent or less of the furnaces total energy use,
according to the department’s official test procedure, and is determined according
to the following formula: (EAE x 3.413) / [(EAE x 3.413) + (EF x 1,000)] ≤ 2
percent.
(17) Very High Efficiency Air Handlers must:
(a) Be installed as part of a hydronic space heating
system; and
(b) Be equipped with an electronically commutated, permanent
magnet variable speed DC (ECPM) motor.
(18) Very High Efficiency Hot Water Boiler Systems
must:
(a) Be tested and rated in accordance with the USDOE
Appendix N test procedure for furnaces in effect at the time these rules are
adopted, and be certified by and listed in the directory of the
Air-Conditioning, Heating, and Refrigeration Institute (AHRI) in effect at the
time these rules are adopted;
(b) Have a minimum AFUE rating:
(A) of 0.88 (88 percent) for installations completed
prior to January 1, 2009;
(B) of 0.92 (92 percent) and must include an outdoor
temperature reset control for installations completed on or after January 1,
2009.
(19) Very High Efficiency Air Conditioning, Air Source
Heat Pump or Furnace systems may receive a supplemental tax credit amount,
determined by the department, based on additional energy savings if the duct
system to which it is attached is tested and certified in accordance with the
protocols specified in Section 330-070-0073(9)(a) through 330-070-0073(9)(g). This
amount is in addition to the tax credit amount for the Very High Efficiency Air
Conditioning, Air Source Heat Pump or Furnace system itself, and in addition to
the tax credit amount provided for the duct testing and certification itself.
In order to earn the supplemental tax credit amount, the air conditioning
and/or heating system must be installed, the duct system must be tested and
certified, and the applications for all tax credit amounts associated with the
system must be received, as a single package, by the department by April 1st of
the tax year following the tax year for which the credits are being claimed.
(20) Very High Efficiency Ductless Air Source Heat Pump
Systems must:
(a) Include an inverter-driven variable speed
compressor;
(b) Be listed in the Air Conditioning, Heating and
Refrigeration Institute (AHRI) Directory of Certified Products.
(c) Deliver at least 50 percent of its ARI-certified
rated capacity at 17°F outside temperature;
(d) Include no integrated electric resistance backup
heat;
(e) Be sized and installed per manufacturer
specifications; and
(f) Be installed by a technician trained by the
equipment manufacturer within the last five years.
(21) Very Efficient Biomass Combustion Devices must be:
(a) Less than one quarter of a million British thermal
units (Btu) per hour heat output, and
(b) Installed in an Oregon residential dwelling; and
(c) Installed with a dedicated outside combustion air
intake; and
(d) Listed in the United States Department
Environmental Protection Agency List of EPA Certified Wood Stoves or other
third-party certified list approved by the Director with emissions of 4.5 grams
of smoke per hour or less if it is designated in that list as a non-catalytic
wood stove; or
(e) Listed in the List of EPA Certified Wood Stoves or
other third-party certified list approved by the Director with emissions of 2.5
grams of smoke per hour or less if it is designated in that list as a catalytic
wood or pellet stove; or
(f) Have a certificate of performance for the specific
manufacturer and model of wood burning device from a currently US EPA certified
woodstove testing laboratory. The certificate must show emissions of 4.5 grams
of smoke per hour or less if it is designated as a non-catalytic wood stove or
emissions of 2.5 grams of smoke per hour or less if it is designated as a
catalytic wood or pellet stove.
(22) Any other standards adopted by the department for
energy-efficient appliances and alternative fuel devices, their components,
and/or systems as determined by the Director.
[ED. NOTE: Appendices referenced
are available from the agency.]
Stat. Auth.: ORS 469.086
Stats. Implemented: ORS 316.116
Hist.: DOE 1-1982, f. 1-12-82, ef.
2-1-82; DOE 1-1986, f. & ef. 2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88;
DOE 1-1996, f. & cert. ef. 4-1-96; DOE 1-1997, f. 12-15-97, cert. ef.
1-1-98; DOE 1-1999, f. 12-21-99, cert. ef. 1-1-00; DOE 2-2000, f. 12-29-00,
cert. ef. 1-1-01; DOE 2-2001, f. 10-5-01, cert. ef. 10-8-01; DOE 1-2004, f.
& cert. ef. 1-21-04; DOE 4-2004, f. & cert. ef. 8-2-04; DOE 2-2005, f.
12-30-05, cert. ef. 1-1-06; DOE 4-2006, f. 12-29-06, cert. ef. 1-1-07; DOE
4-2007, f. 11-30-07, cert. ef. 12-1-07; DOE 7-2008, f. 10-31-08, cert. ef.
11-1-08; DOE 16-2010, f. & cert. ef. 12-22-10
330-070-0089
Wind AEDs
(1) To qualify for a tax credit:
(a) A wind AED system manufacturer must provide monthly
data of average energy produced (kWh) and average wind speed for one
consecutive year for each model of system to demonstrate reliable operation of
that model of equipment at a site with average annual wind speeds of at least
12 mph; OR The wind AED system model must be listed on the official list of
Qualified Wind Generators published by the California Energy Commission or the
New York State Energy Research and Development Authority (NYSERDA).
(b) A wind AED system application must include the
nominal rated electric capacity, the power curve and energy production data as
a function of the average annual wind speed.
(c) A wind system must have a minimum five-year
manufacturer’s warranty.
(2) The department reserves the right to deny
eligibility for any wind AED for any reason including, but not limited to: poor
generator performance, concerns about wind generation system design or quality
of data presented; lack of manufacturing support for maintenance, warranties,
etc., insufficient experience with generator, etc.
(3) Systems must be designed and located to reduce the
potential for hazards and unpleasant living conditions. Systems must be
designed and located taking into account:
(a) The proximity of the system to buildings, power
lines, antennae or other similar hazards;
(b) The effect of high winds on the system and on any
building connected to the system by guy wires;
(c) Whether the system blocks fire lanes, obstructs
dwelling access, or otherwise increases fire danger;
(d) Whether the operation of the system significantly
increases background noise; and
(e) Whether connecting the system to other buildings by
guy wires creates vibration and tension in other buildings.
(4) Materials used will assure that the wind AED has
adequate:
(a) Strength;
(b) Resistance to wind, lightning, ice, moisture,
corrosion and fire;
(c) Durability; and
(d) Low maintenance cost.
(5) The wind AED must withstand all natural forces it
may be expected to experience.
(6) No part of a wind AED project must put toxic
substances into the environment in amounts that will cause disease or harmful
physical effects to humans, animals or plants.
(7) Wind AED parts must be serviceable without the need
to trespass.
(8) Maximum Design Wind Speed: All parts of a Wind AED
project must withstand the highest wind speed expected at its location. All
parts must withstand this wind without damage. To meet this requirement, wind
AEDs may be shut down during highest expected winds.
(9) Manual Shutdown: All wind AEDs must have a manual
way to stop the rotor from turning. This method must work safely during high
winds and routine service.
(10) Overspeed Control: Rotor overspeeds shall be
prevented by the wind AED’s design.
(11) Tower safety: All parts of a wind AED project
shall meet accepted engineering standards. Tower design must include consideration
of:
(a) Gravity load; and
(b) Peak thrust on the rotor, nacelle, tail and tower
over the full wind speed operating range.
(12) Electric: All wind AED electrical parts must
adhere to all standards and codes in force at the time they are installed.
(13) Lightning: Wind AEDs must withstand lightning
strikes.
(14) The Director may waive part or all of section (1)
of this rule if production of the wind AED model stopped prior to 1990, or it
is an owner-built system or a mechanical wind AED.
(15) The first-year energy yield of wind AEDs must be
at least 350 kWh.
(a) The first-year energy yield must be estimated using
the measured or estimated wind resource data and the wind AED’s power curve or
energy production data.
(A) The provided wind data must cover at least a
one-year period.
(B) Wind data may be used from:
(i) Three nearby wind monitoring stations;
(ii) The wind AED site itself;
(iii) In the event of less than one year’s measurements
at the wind AED site, the application shall include the months of on-site
measurements and one year’s worth of data from two nearby locations; or
(iv) A nationally recognized firm that provides
estimated wind resource data based on advanced national wind mapping
technology.
(b) The department will use data supplied by the
applicant to verify the first-year energy yield.
Stat. Auth.: ORS 469.160 - 469.180
Stats. Implemented:
Hist.: DOE 1-1999, f. 12-21-99,
cert. ef. 1-1-00; DOE 2-2001, f. 10-5-01, cert. ef. 10-8-01; DOE 1-2004, f.
& cert. ef. 1-21-04; DOE 2-2005, f. 12-30-05, cert. ef. 1-1-06; DOE 4-2007,
f. 11-30-07, cert. ef. 12-1-07; DOE 7-2008, f. 10-31-08, cert. ef. 11-1-08; DOE
16-2010, f. & cert. ef. 12-22-10
330-070-0091
Eligible Costs for a Wind AED
(1) The costs listed in subsections (2)(a) through (m)
of this rule do not include all eligible costs. Other costs will qualify if
directly associated with the acquisition and installation of the AED. Only
total working systems will qualify for a tax credit. All systems must comply
with OAR 330-70-0021 and 330-070-0040.
(2) Eligible costs include:
(a) The cost of wind turbine generators;
(b) The cost of DC/AC converters, inverters and
synchronous inverters;
(c) The cost of wind and system instruments and
controls when part of a total wind AED;
(d) The cost of energy storage (batteries or other
methods);
(e) The cost of tower, foundation and guys;
(f) Fees paid for design and building;
(g) Fee to install;
(h) The cost of electric meters, switches and
electrical safety equipment;
(i) The cost of electric transformers and lines and
supports;
(j) The cost of safety equipment;
(k) Up to $500 of wind permitting cost;
(l) The cost of windmills; and
(m) The cost of pumps, linkage, pump heads, and vacuum
chambers.
Stat. Auth.: ORS 469.160 - 469.180
Stats. Implemented:
Hist.: DOE 1-1999, f. 12-21-99,
cert. ef. 1-1-00; DOE 1-2004, f. & cert. ef. 1-21-04; DOE 4-2007, f.
11-30-07, cert. ef. 12-1-07; DOE 16-2010, f. & cert. ef. 12-22-10
330-070-0097
Electricity Producing AEDs
Generating AEDs linked with an electric utility must be
installed in accordance with local utility interconnect guidelines and be UL
listed and installed per the state electrical code.
Stat. Auth.: ORS 469
Stats. Implemented: ORS 469.170
Hist.: DOE 1-1982, f. 1-12-82, ef.
2-1-82; DOE 1-1986, f. & ef. 2-7-86; DOE 4-1987, f. 12-18-87, ef. 1-1-88;
DOE 1-1997, f. 12-15-97, cert. ef. 1-1-98; DOE 1-1999, f. 12-21-99, cert. ef.
1-1-00; DOE 1-2004, f. & cert. ef. 1-21-04; DOE 2-2005, f. 12-30-05, cert.
ef. 1-1-06; DOE 4-2007, f. 11-30-07, cert. ef. 12-1-07; DOE 16-2010, f. &
cert. ef. 12-22-10
Notes
1.) This online version of the OREGON BULLETIN is provided for convenience of reference and enhanced access. The official, record copy of this publication is contained in the original Administrative Orders and Rulemaking Notices filed with the Secretary of State, Archives Division. Discrepancies, if any, are satisfied in favor of the original versions. Use the OAR Revision Cumulative Index found in the Oregon Bulletin to access a numerical list of rulemaking actions after November 15, 2010.
2.) Copyright 2011 Oregon Secretary of State: Terms and Conditions of Use |