Rule Caption: Electronic submittal of proposed and adopted changes to comprehensive land use plans.

Adm. Order No.: LCDD 4-2013

Filed with Sec. of State: 12-20-2013

Certified to be Effective: 1-1-14

Notice Publication Date: 8-1-2013

Rules Amended: 660-018-0020, 660-018-0040

Subject: The proposed amendments to OAR 660, division 18 authorize, but do not require, local governments to submit mandatory notification materials to the Department of Land Conservation and Development in an electronic format rather than a paper medium as formerly required.

Rules Coordinator: Casaria Taylor—(503) 373-0050, ext. 322

660-018-0020

Notice of a Proposed Change to a Comprehensive Plan or Land Use Regulation

(1) Before a local government adopts a change to an acknowledged comprehensive plan or a land use regulation, unless circumstances described in OAR 660-018-0022 apply, the local government shall submit the proposed change to the department, including the information described in section (2) of this rule. The local government must submit the proposed change to the director at the department’s Salem office at least 35 days before holding the first evidentiary hearing on adoption of the proposed change.

(2) The submittal must include applicable forms provided by the department, be in a format acceptable to the department, and include all of the following materials:

(a) The text of the proposed change to the comprehensive plan or land use regulation implementing the plan, as provided in section (3) of this rule;

(b) If a comprehensive plan map or zoning map is created or altered by the proposed change, a copy of the relevant portion of the map that is created or altered;

(c) A brief narrative summary of the proposed change and any supplemental information that the local government believes may be useful to inform the director and members of the public of the effect of the proposed change;

(d) The date set for the first evidentiary hearing;

(e) The notice or a draft of the notice required under ORS 197.763 regarding a quasi-judicial land use hearing, if applicable; and

(f) Any staff report on the proposed change or information that describes when the staff report will be available and how a copy may be obtained.

(3) The proposed text submitted to comply with subsection (2)(a) of this rule must include all of the proposed wording to be added to or deleted from the acknowledged plan or land use regulations. A general description of the proposal or its purpose, by itself, is not sufficient. For map changes, the material submitted to comply with Subsection (2)(b) must include a graphic depiction of the change; a legal description, tax account number, address or similar general description, by itself, is not sufficient. If a goal exception is proposed, the submittal must include the proposed wording of the exception.

(4) If a local government proposes a change to an acknowledged comprehensive plan or a land use regulation solely for the purpose of conforming the plan and regulations to new requirements in a land use statute, statewide land use planning goal, or a rule implementing the statutes or goals, the local government may adopt such a change without holding a public hearing, notwithstanding contrary provisions of state and local law, provided:

(a) The local government provides notice to the department of the proposed change identifying it as a change described under this section, and includes the materials described in section (2) of this rule, 35 days before the proposed change is adopted by the local government, and

(b) The department confirms in writing prior to the adoption of the change that the only effect of the proposed change is to conform the comprehensive plan or the land use regulations to the new requirements.

(5) For purposes of computation of time for the 35-day notice under this rule and OAR 660-018-0035(1)(c), the proposed change is considered to have been “submitted” on the day that paper copies or an electronic file of the applicable notice forms and other documents required by section (2) this rule are received or, if mailed, on the date of mailing. The materials must be mailed to or received by the department at its Salem office.

Stat. Auth.: ORS 197.040

Stats. Implemented: ORS 197.610 - 197.625

Hist.: LCDC 14-1981, f. & ef. 12-15-81; LCDC 12-1983, f. & ef. 12-29-83; LCDC 3-1987, f. & ef. 11-12-87; LCDD 3-2000, f. & cert. ef. 2-14-00; LCDD 3-2008, f. & cert. ef. 4-18-08; LCDD 6-2011, f. & cert. ef. 10-20-11; LCDD 12-2011(Temp), f. 12-30-11, cert. ef. 1-1-12 thru 5-1-12; LCDD 3-2012, f. & cert. ef. 2-14-12; LCDD 4-2013, f. 12-20-13, cert. ef. 1-1-14

660-018-0040

Submittal of Adopted Change

(1) When a local government adopts a proposed change to an acknowledged comprehensive plan or a land use regulation it shall submit the decision to the department, with the appropriate notice forms provided by the department, within 20 days.

(2) For purposes of the 20-day requirement under section (1) of this rule, the proposed change is considered submitted to the department:

(a) On the day the applicable notice forms and other required documents are received by the department in its Salem office, if hand-delivered or submitted by electronic mail or similar electronic method, or

(b) On the date of mailing if the local government mails the forms and documents.

(3) The submission to the department must in a format acceptable to the department and include all of the following materials:

(a) A copy of final decision;

(b) The findings and the text of the change to the comprehensive plan or land use regulation;

(c) If a comprehensive plan map or zoning map is created or altered by the proposed change:

(A) A map showing the area changed and applicable designations; and

(B) Electronic files containing geospatial data showing the area changed, as specified in section (5) of this rule, if applicable.

(d) A brief narrative summary of the decision, including a summary of substantive differences from the proposed change submitted under OAR 660-018-0020 and any supplemental information that the local government believes may be useful to inform the director or members of the public of the effect of the actual change; and

(e) A statement by the individual transmitting the decision identifying the date of the decision and the date the submission was mailed to the department.

(4) Where amendments or new land use regulations, including supplementary materials, exceed 100 pages, a summary of the amendment briefly describing its purpose and requirements shall be included with the submittal to the director.

(5) For local governments that produce geospatial data describing an urban growth boundary (UGB) or urban or rural reserve that is created or altered as part of an adopted change to a comprehensive plan or land use regulation, the submission must include electronic geospatial data depicting the boundary change. Local governments that create or alter other zoning or comprehensive plan maps as geospatial data are encouraged but not required to share this data with the department. Geospatial data submitted to the department must comply with the following standards endorsed by the Oregon Geographic Information Council:

(a) Be in an electronic format compatible with the State’s Geographic Information System software standard described in OAR 125-600-7550; and

(b) Be accompanied by metadata that meets at least the minimum requirements of the federal Content Standard for Digital Geospatial Metadata.

(6) Local government must notify the department of withdrawals or denials of proposals previously sent to the department under requirements of OAR 660-018-0020.

(7) If a local government did not submit a notice of a proposed change to a comprehensive plan or land use regulation to the department as required by OAR 660-018-0020, the transmittal must clearly indicate which provisions of OAR 660-018-022 are applicable.

NOTE: ORS 197.610 clearly requires all adopted plan and land use regulation amendments and new land use regulations to be submitted to the director even if they were not required to be submitted for review prior to adoption.

(8) ORS 197.620 provides that a local government may cure the untimely submission of materials by either postponing the date for the final evidentiary hearing by the greater of 10 days or the number of days by which the submission was late; or by holding the evidentiary record open for an additional period of time equal to 10 days or the number of days by which the submission was late, whichever is greater. The local government shall provide notice of such postponement or record extension to the department.

Stat. Auth.: ORS 197.040

Stats. Implemented: ORS 197.610 - 197.625

Hist.: LCDC 14-1981, f. & ef. 12-15-81; LCDC 12-1983, f. & ef. 12-29-83; LCDC 3-1987, f. & ef. 11-12-87; LCDD 3-2000, f. & cert. ef. 2-14-00; LCDD 3-2008, f. & cert. ef. 4-18-08; LCDD 6-2011, f. & cert. ef. 10-20-11; LCDD 12-2011(Temp), f. 12-30-11, cert. ef. 1-1-12 thru 5-1-12; LCDD 3-2012, f. & cert. ef. 2-14-12; LCDD 4-2013, f. 12-20-13, cert. ef. 1-1-14


Rule Caption: Minor and technical changes to conform to recent legislation regarding agricultural and forest land.

Adm. Order No.: LCDD 5-2013

Filed with Sec. of State: 12-20-2013

Certified to be Effective: 1-1-14

Notice Publication Date: 11-1-2013

Rules Amended: 660-006-0025, 660-006-0026, 660-006-0055

Subject: The adopted amendments modify rules to make minor and technical changes to conform to recent legislation and to correct references.

Rules Coordinator: Casaria Taylor—(503) 373-0050, ext. 322

660-006-0025

Uses Authorized in Forest Zones

(1) Goal 4 requires that forest land be conserved. Forest lands are conserved by adopting and applying comprehensive plan provisions and zoning regulations consistent with the goals and this rule. In addition to forest practices and operations and uses auxiliary to forest practices, as set forth in ORS 527.722, the Commission has determined that five general types of uses, as set forth in the goal, may be allowed in the forest environment, subject to the standards in the goal and in this rule. These general types of uses are:

(a) Uses related to and in support of forest operations;

(b) Uses to conserve soil, air and water quality and to provide for fish and wildlife resources, agriculture and recreational opportunities appropriate in a forest environment;

(c) Locationally-dependent uses, such as communication towers, mineral and aggregate resources, etc.

(d) Dwellings authorized by ORS 215.705 to 215.755; and

(e) Other dwellings under prescribed conditions.

(2) The following uses pursuant to the Forest Practices Act (ORS Chapter 527) and Goal 4 shall be allowed in forest zones:

(a) Forest operations or forest practices including, but not limited to, reforestation of forest land, road construction and maintenance, harvesting of a forest tree species, application of chemicals, and disposal of slash;

(b) Temporary on-site structures that are auxiliary to and used during the term of a particular forest operation;

(c) Physical alterations to the land auxiliary to forest practices including, but not limited to, those made for purposes of exploration, mining, commercial gravel extraction and processing, landfills, dams, reservoirs, road construction or recreational facilities; and

(d) For the purposes of section (2) of this rule “auxiliary” means a use or alteration of a structure or land that provides help or is directly associated with the conduct of a particular forest practice. An auxiliary structure is located on site, temporary in nature, and is not designed to remain for the forest’s entire growth cycle from planting to harvesting. An auxiliary use is removed when a particular forest practice has concluded.

(3) The following uses may be allowed outright on forest lands:

(a) Uses to conserve soil, air and water quality and to provide for wildlife and fisheries resources;

(b) Farm use as defined in ORS 215.203;

(c) Local distribution lines (e.g., electric, telephone, natural gas) and accessory equipment (e.g., electric distribution transformers, poles, meter cabinets, terminal boxes, pedestals), or equipment that provides service hookups, including water service hookups;

(d) Temporary portable facility for the primary processing of forest products;

(e) Exploration for mineral and aggregate resources as defined in ORS chapter 517;

(f) Private hunting and fishing operations without any lodging accommodations;

(g) Towers and fire stations for forest fire protection;

(h) Widening of roads within existing rights-of-way in conformance with the transportation element of acknowledged comprehensive plans and public road and highway projects as described in ORS 215.213(1) and 215.283(1);

(i) Water intake facilities, canals and distribution lines for farm irrigation and ponds;

(j) Caretaker residences for public parks and public fish hatcheries;

(k) Uninhabitable structures accessory to fish and wildlife enhancement;

(l) Temporary forest labor camps;

(m) Exploration for and production of geothermal, gas, oil, and other associated hydrocarbons, including the placement and operation of compressors, separators and other customary production equipment for an individual well adjacent to the well head;

(n) Destination resorts reviewed and approved pursuant to ORS 197.435 to 197.467 and Goal 8;

(o) Disposal site for solid waste that has been ordered established by the Oregon Environmental Quality Commission under ORS 459.049, together with the equipment, facilities or buildings necessary for its operation;

(p) Alteration, restoration or replacement of a lawfully established dwelling that:

(A) Has intact exterior walls and roof structures;

(B) Has indoor plumbing consisting of a kitchen sink, toilet and bathing facilities connected to a sanitary waste disposal system;

(C) Has interior wiring for interior lights;

(D) Has a heating system; and

(E) In the case of replacement, is removed, demolished or converted to an allowable nonresidential use within three months of the completion of the replacement dwelling;

(q) An outdoor mass gathering as defined in ORS 433.735 or other gathering of fewer than 3,000 persons that is not anticipated to continue for more than 120 hours in any three-month period is not a “land use decision” as defined in ORS 197.015(10) or subject to review under this division;

(r) Dump truck parking as provided in ORS 215.311; and

(s) An agricultural building, as defined in ORS 455.315, customarily provided in conjunction with farm use or forest use. A person may not convert an agricultural building authorized by this section to another use.

(4) The following uses may be allowed on forest lands subject to the review standards in section (5) of this rule:

(a) Permanent facility for the primary processing of forest products;

(b) Permanent logging equipment repair and storage;

(c) Log scaling and weigh stations;

(d) Disposal site for solid waste approved by the governing body of a city or county or both and for which the Oregon Department of Environmental Quality has granted a permit under ORS 459.245, together with equipment, facilities or buildings necessary for its operation;

(e)(A) Private parks and campgrounds. Campgrounds in private parks shall only be those allowed by this subsection. Except on a lot or parcel contiguous to a lake or reservoir, campgrounds shall not be allowed within three miles of an urban growth boundary unless an exception is approved pursuant to ORS 197.732 and OAR chapter 660, division 4. A campground is an area devoted to overnight temporary use for vacation, recreational or emergency purposes, but not for residential purposes and is established on a site or is contiguous to lands with a park or other outdoor natural amenity that is accessible for recreational use by the occupants of the campground. A campground shall be designed and integrated into the rural agricultural and forest environment in a manner that protects the natural amenities of the site and provides buffers of existing native trees and vegetation or other natural features between campsites. Campsites may be occupied by a tent, travel trailer or recreational vehicle. Separate sewer, water or electric service hook-ups shall not be provided to individual camp sites. Campgrounds authorized by this rule shall not include intensively developed recreational uses such as swimming pools, tennis courts, retail stores or gas stations. Overnight temporary use in the same campground by a camper or camper’s vehicle shall not exceed a total of 30 days during any consecutive six-month period.

(B) Campsites may be occupied by a tent, travel trailer, yurt or recreational vehicle. Separate sewer, water or electric service hook-ups shall not be provided to individual camp sites except that electrical service may be provided to yurts allowed for by paragraph (4)(e)(C) of this rule.

(C) Subject to the approval of the county governing body or its designee, a private campground may provide yurts for overnight camping. No more than one-third or a maximum of 10 campsites, whichever is smaller, may include a yurt. The yurt shall be located on the ground or on a wood floor with no permanent foundation. Upon request of a county governing body, the Commission may provide by rule for an increase in the number of yurts allowed on all or a portion of the campgrounds in a county if the Commission determines that the increase will comply with the standards described in ORS 215.296(1). As used in this rule, “yurt” means a round, domed shelter of cloth or canvas on a collapsible frame with no plumbing, sewage disposal hook-up or internal cooking appliance.

(f) Public parks including only those uses specified under OAR 660-034-0035 or 660-034-0040, whichever is applicable;

(g) Mining and processing of oil, gas, or other subsurface resources, as defined in ORS Chapter 520, and not otherwise permitted under subsection (3)(m) of this rule (e.g., compressors, separators and storage serving multiple wells), and mining and processing of aggregate and mineral resources as defined in ORS Chapter 517;

(h) Television, microwave and radio communication facilities and transmission towers;

(i) Fire stations for rural fire protection;

(j) Commercial utility facilities for the purpose of generating power. A power generation facility shall not preclude more than 10 acres from use as a commercial forest operation unless an exception is taken pursuant to OAR chapter 660, division 4;

(k) Aids to navigation and aviation;

(l) Water intake facilities, related treatment facilities, pumping stations, and distribution lines;

(m) Reservoirs and water impoundments;

(n) Firearms training facility;

(o) Cemeteries;

(p) Private seasonal accommodations for fee hunting operations may be allowed subject to section (5) of this rule, OAR 660-006-0029, and 660-006-0035 and the following requirements:

(A) Accommodations are limited to no more than 15 guest rooms as that term is defined in the Oregon Structural Specialty Code;

(B) Only minor incidental and accessory retail sales are permitted;

(C) Accommodations are occupied temporarily for the purpose of hunting during either or both game bird or big game hunting seasons authorized by the Oregon Fish and Wildlife Commission; and

(D) A governing body may impose other appropriate conditions.

(q) New electric transmission lines with right of way widths of up to 100 feet as specified in ORS 772.210. New distribution lines (e.g., gas, oil, geothermal, telephone, fiber optic cable) with rights-of-way 50 feet or less in width;

(r) Temporary asphalt and concrete batch plants as accessory uses to specific highway projects;

(s) Home occupations as defined in ORS 215.448;

(t) A manufactured dwelling or recreational vehicle, or the temporary residential use of an existing building, in conjunction with an existing dwelling as a temporary use for the term of a hardship suffered by the existing resident or a relative as defined in ORS 215.213 and 215.283. The manufactured dwelling shall use the same subsurface sewage disposal system used by the existing dwelling, if that disposal system is adequate to accommodate the additional dwelling. If the manufactured dwelling will use a public sanitary sewer system, such condition will not be required. Within three months of the end of the hardship, the manufactured dwelling or recreational vehicle shall be removed or demolished or, in the case of an existing building, the building shall be removed, demolished or returned to an allowed nonresidential use. A temporary residence approved under this subsection is not eligible for replacement under subsection (3)(p) of this rule. Governing bodies every two years shall review the permit authorizing such mobile homes. When the hardships end, governing bodies or their designate shall require the removal of such mobile homes. Oregon Department of Environmental Quality review and removal requirements also apply to such mobile homes. As used in this section, “hardship” means a medical hardship or hardship for the care of an aged or infirm person or persons;

(u) Expansion of existing airports;

(v) Public road and highway projects as described in ORS 215.213(2)(p) through (r) and (10) and 215.283(2)(q) through (s) and (3);

(w) Private accommodations for fishing occupied on a temporary basis may be allowed subject to section (5) of this rule, OAR 600-060-0029 and 660-006-0035 and the following requirements:

(A) Accommodations limited to no more than 15 guest rooms as that term is defined in the Oregon Structural Specialty Code;

(B) Only minor incidental and accessory retail sales are permitted;

(C) Accommodations occupied temporarily for the purpose of fishing during fishing seasons authorized by the Oregon Fish and Wildlife Commission;

(D) Accommodations must be located within 1/4 mile of fish-bearing Class I waters; and

(E) A governing body may impose other appropriate conditions.

(x) Forest management research and experimentation facilities as defined by ORS 526.215 or where accessory to forest operations; and

(y) An outdoor mass gathering subject to review by a county planning commission under the provisions of ORS 433.763. These gatherings are those of more than 3,000 persons that continue or can reasonably be expected to continue for more than 120 hours within any three-month period and any part of which is held in open spaces.

(z) Storage structures for emergency supplies to serve communities and households that are located in tsunami inundation zones, if:

(A) Areas within an urban growth boundary cannot reasonably accommodate the structures;

(B) The structures are located outside tsunami inundation zones and consistent with evacuation maps prepared by Department of Geology and Mineral Industries (DOGAMI) or the local jurisdiction;

(C) Sites where the structures could be co-located with an existing use approved under this section are given preference for consideration;

(D) The structures are of a number and size no greater than necessary to accommodate the anticipated emergency needs of the population to be served;

(E) The structures are managed by a local government entity for the single purpose of providing for the temporary emergency support needs of the public; and

(F) Written notification has been provided to the County Office of Emergency Management of the application for the storage structures.

(5) A use authorized by section (4) of this rule may be allowed provided the following requirements or their equivalent are met. These requirements are designed to make the use compatible with forest operations and agriculture and to conserve values found on forest lands:

(a) The proposed use will not force a significant change in, or significantly increase the cost of, accepted farming or forest practices on agriculture or forest lands;

(b) The proposed use will not significantly increase fire hazard or significantly increase fire suppression costs or significantly increase risks to fire suppression personnel; and

(c) A written statement recorded with the deed or written contract with the county or its equivalent is obtained from the land owner that recognizes the rights of adjacent and nearby land owners to conduct forest operations consistent with the Forest Practices Act and Rules for uses authorized in subsections (4)(e), (m), (s), (t) and (w) of this rule.

(6) Nothing in this rule relieves governing bodies from complying with other requirement contained in the comprehensive plan or implementing ordinances such as the requirements addressing other resource values (e.g., Goal 5) that exist on forest lands.

[Publications: Publications referenced are available from the agency.]

Stat. Auth.: ORS 197.040, 197.230 & 197.245

Stats. Implemented: ORS 197.040, 197.230, 197.245, 215.700, 215.705, 215.720, 215.740, 215.750, 215.780 & 1993 OL Ch. 792

Hist.: LCDC 1-1990, f. & cert. ef. 2-5-90; LCDC 7-1992, f. & cert. ef. 12-10-92; LCDC 1-1994, f. & cert. ef. 3-1-94; LCDC 8-1995, f. & cert. ef. 6-29-95; LCDC 3-1996, f. & cert. ef. 12-23-96; LCDD 2-1998, f. & cert. ef. 6-1-98; LCDD 5-2000, f. & cert. ef. 4-24-00; LCDD 1-2002, f. & cert. ef. 5-22-02; LCDD 3-2004, f. & cert. ef. 5-7-04; LCDD 2-2011, f. & cert. ef. 2-2-11; LCDD 1-2013, f. 1-29-13, cert. ef. 2-1-13; LCDD 5-2013, f. 12-20-13, cert. ef. 1-1-14

660-006-0026

New Land Division Requirements in Forest Zones

(1) Governing bodies shall legislatively amend their land division standards to incorporate one or more of the following parcel sizes. Under these provisions, a governing body may not determine minimum parcel sizes for forest land on a case-by-case basis:

(a) An 80-acre or larger minimum parcel size; or

(b) One or more numeric minimum parcel sizes less than 80 acres provided that each parcel size is large enough to ensure:

(A) The opportunity for economically efficient forest operations typically occurring in the area;

(B) The opportunity for the continuous growing and harvesting of forest tree species;

(C) The conservation of other values found on forest lands as described in Goal 4; and

(D) That parcel meets the requirements of ORS 527.630.

(2) New land divisions less than the parcel size in section (1) of this rule may be approved for any of the following circumstances:

(a) For the uses listed in OAR 660-006-0025(3)(m) through (o) and (4)(a) through (o) provided that such uses have been approved pursuant to OAR 660-060-0025(5) and the parcel created from the division is the minimum size necessary for the use.

(b) For the establishment of a parcel for a dwelling that has existed since before June 1, 1995, subject to the following requirements:

(A) The parcel established may not be larger than five acres, except as necessary to recognize physical factors such as roads or streams, in which case the parcel shall not be larger than 10 acres; and

(B) The parcel that does not contain the dwelling is not entitled to a dwelling unless subsequently authorized by law or goal and the parcel either:

(i) Meets the minimum land division standards of the zone; or

(ii) Is consolidated with another parcel, and together the parcels meet the minimum land division standards of the zone.

(c) To allow a division of forest land to facilitate a forest practice as defined in ORS 527.620 that results in a parcel that does not meet the minimum area requirements of subsection (1)(a) or (b). Approvals shall be based on findings that demonstrate that there are unique property specific characteristics present in the proposed parcel that require an amount of land smaller than the minimum area requirements of subsections (1)(a) or (b) of this rule in order to conduct the forest practice. Parcels created pursuant to this subsection:

(A) Are not eligible for siting of new dwelling;

(B) May not serve as the justification for the siting of a future dwelling on other lots or parcels;

(C) May not, as a result of the land division, be used to justify redesignation or rezoning of resource lands; and

(D) May not result in a parcel of less than 35 acres, unless the purpose of the land division is to:

(i) Facilitate an exchange of lands involving a governmental agency; or

(ii) Allow transactions in which at least one participant is a person with a cumulative ownership of at least 2,000 acres of forest land.

(d) To allow a division of a lot or parcel zoned for forest use if:

(A) At least two dwellings lawfully existed on the lot or parcel prior to November 4, 1993;

(B) Each dwelling complies with the criteria for a replacement dwelling under ORS 215.213(1) or 215.283(1);

(C) Except for one lot or parcel, each lot or parcel created under this paragraph is between two and five acres in size;

(D) At least one dwelling is located on each lot or parcel created under this paragraph; and

(E) The landowner of a lot or parcel created under this paragraph provides evidence that a restriction prohibiting the landowner and the landowner’s successors in interest from further dividing the lot or parcel has been recorded with the county clerk of the county in which the lot or parcel is located. A restriction imposed under this paragraph shall be irrevocable unless a statement of release is signed by the county planning director of the county in which the lot or parcel is located indicating that the comprehensive plan or land use regulations applicable to the lot or parcel have been changed so that the lot or parcel is no longer subject to statewide planning goals protecting forestland or unless the land division is subsequently authorized by law or by a change in a statewide planning goal for land zoned for forest use.

(e) To allow a proposed division of land as provided in ORS 215.783.

(3) A county planning director shall maintain a record of lots and parcels that do not qualify for division under the restrictions imposed by OAR 660-006-0026(2)(d) and (4). The record shall be available to the public.

(4) A lot or parcel may not be divided under OAR 660-006-0026(2)(d) if an existing dwelling on the lot or parcel was approved under:

(a) A statute, an administrative rule or a land use regulation as defined in ORS 197.015 that required removal of the dwelling or that prohibited subsequent division of the lot or parcel; or

(b) A farm use zone provision that allowed both farm and forest uses in a mixed farm and forest use zone under statewide goal 4 (Forest Lands).

(5)(a) An applicant for the creation of a parcel pursuant to subsection (2)(b) of this rule shall provide evidence that a restriction on the remaining parcel, not containing the dwelling, has been recorded with the county clerk of the county where the property is located. The restriction shall allow no dwellings unless authorized by law or goal on land zoned for forest use except as permitted under section (2) of this rule.

(b) A restriction imposed under this subsection shall be irrevocable unless a statement of release is signed by the county planning director of the county where the property is located indicating that the comprehensive plan or land use regulations applicable to the property have been changed in such a manner that the parcel is no longer subject to statewide planning goals pertaining to agricultural land or forest land.

(c) The county planning director shall maintain a record of parcels that do not qualify for the siting of a new dwelling under restrictions imposed by this rule. The record shall be readily available to the public.

(6) A landowner allowed a land division under section (2) of this rule shall sign a statement that shall be recorded with the county clerk of the county in which the property is located, declaring that the landowner will not in the future complain about accepted farming or forest practices on nearby lands devoted to farm or forest use.

Stat. Auth.: ORS 197.040, 197.230 & 197.245

Stats. Implemented: ORS 197.040, 197.230, 197.245, 215.700, 215.705, 215.720, 215.740, 215.750, 215.780, 215.783 & Ch. 792, 1993 OL

Hist.: LCDC 1-1990, f. & cert. ef. 2-5-90; LCDC 7 1992, f. & cert. ef. 12-10-92; LCDC 1-1994, f. & cert. ef. 3-1-94; LCDC 3-1996, f. & cert. ef. 12-23-96; LCDD 2-1998, f. & cert. ef. 6-1-98; LCDD 1-2002, f. & cert. ef. 5-22-02; LCDD 3-2008, f. & cert. ef. 4-18-08; LCDD 2-2011, f. & cert. ef. 2-2-11; LCDD 5-2013, f. 12-20-13, cert. ef. 1-1-14

660-006-0055

New Land Division Requirements in Agriculture/Forest Zones

(1) A governing body shall apply the standards of OAR 660-006-0026 and 660-033-0100 to determine the proper minimum lot or parcel size for a mixed agriculture/forest zone. These standards are designed: To make new land divisions compatible with forest operations; to maintain the opportunity for economically efficient forest and agriculture practices; and to conserve values found on forest lands.

(2) New land divisions less than the parcel size established according to the requirements in section (1) of this rule may be approved for any of the following circumstances:

(a) For the uses listed in OAR 660-006-0025(3)(m) through (o) and (4)(a) through (o) provided that such uses have been approved pursuant to OAR 660-060-0025(5) and the land division created is the minimum size necessary for the use.

(b) For the establishment of a parcel for a dwelling that has existed since before June 1, 1995, subject to the following requirements:

(A) The parcel established may not be larger than five acres, except as necessary to recognize physical factors such as roads or streams, in which case the parcel shall not be larger than 10 acres; and

(B) The parcel that does not contain the dwelling is not entitled to a dwelling unless subsequently authorized by law or goal and the parcel either:

(i) Meets the minimum land divisions standards of the zone; or

(ii) Is consolidated with another parcel, and together the parcels meet the minimum land division standards of the zone;

(C) The minimum tract eligible under subsection (b) of this section is 40 acres;

(D) The tract shall be predominantly in forest use and that portion in forest use qualified for special assessment under a program under ORS chapter 321; and

(E) The remainder of the tract does not qualify for any uses allowed under ORS 215.213 and 215.283 that are not allowed on forestland.

(c) To allow a division of forestland to facilitate a forest practice as defined in ORS 527.620 that results in a parcel that does not meet the minimum area requirements of section (1). Parcels created pursuant to this subsection:

(A) Are not eligible for siting of a new dwelling;

(B) May not serve as the justification for the siting of a future dwelling on other lots or parcels;

(C) May not, as a result of the land division, be used to justify redesignation or rezoning of resource land; and

(D) May not result in a parcel of less than 35 acres, unless the purpose of the land division is to:

(i) Facilitate an exchange of lands involving a governmental agency; or

(ii) Allow transactions in which at least one participant is a person with a cumulative ownership of at least 2,000 acres of forestland.

(d) To allow a division of a lot or parcel zoned for mixed farm and forest use if:

(A) At least two dwellings lawfully existed on the lot or parcel prior to November 4, 1993;

(B) Each dwelling complies with the criteria for a replacement dwelling under ORS 215.213(1) or 215.283(1);

(C) Except for one lot or parcel, each lot or parcel created under this section is between two and five acres in size;

(D) At least one dwelling is located on each lot or parcel created under this section; and

(E) The landowner of a lot or parcel created under this section provides evidence that a restriction prohibiting the landowner and the land owner’s successors in interest from further dividing the lot or parcel has been recorded with the county clerk of the county in which the lot or parcel is located. A restriction imposed under this section shall be irrevocable unless a statement of release is signed by the county planning director of the county in which the lot or parcel is located indicating that the comprehensive plan or land use regulations applicable to the lot or parcel have been changed so that the lot or parcel is no longer subject to statewide goal 4 (Forest Lands) or unless the land division is subsequently authorized by law or by a change in statewide goal 4 (Forest Land);

(e) To allow a proposed division of land as provided in ORS 215.783.

(3) A county planning director shall maintain a record of lots and parcels that do not qualify for division under the restrictions imposed by OAR 660-006-0055(2)(d) and (4). The record shall be readily available to the public.

(4) A lot or parcel may not be divided under OAR 660-006-0055(2)(d) if an existing dwelling on the lot or parcel was approved under:

(a) A statute, an administrative rule or a land use regulation as defined in ORS 197.015 that required removal of the dwelling or that prohibited subsequent division of the lot or parcel; or

(b) A farm use zone provision that allowed both farm and forest uses in a mixed farm and forest use zone under statewide goal 4 (Forest Lands).

(5)(a) An applicant for the creation of a parcel pursuant to subsection (2)(b) of this rule shall provide evidence that a restriction on the remaining parcel, not containing the dwelling, has been recorded with the county clerk of the county where the property is located. The restriction shall allow no dwellings unless authorized by law or goal on land zoned for forest use except as permitted under section (2) of this rule.

(b) A restriction imposed under this section shall be irrevocable unless a statement of release is signed by the county planning director of the county where the property is located indicating that the comprehensive plan or land use regulations applicable to the property have been changed in such a manner that the parcel is no longer subject to statewide planning goals pertaining to agricultural land or forestland.

(c) The county planning director shall maintain a record of parcels that do not qualify for the siting of a new dwelling under restrictions imposed by this section. The record shall be readily available to the public.

(6) A landowner allowed a land division under section (2) of this rule shall sign a statement that shall be recorded with the county clerk of the county in which the property is located, declaring that the landowner and the landowner’s successors in interest will not in the future complain about accepted farming or forest practices on nearby lands devoted to farm or forest use.

Stat. Auth.: ORS 197.040, 197.230 & 197.245

Stats. Implemented: ORS 197.040, 197.230, 197.245, 215.213. 215.283. 215.700, 215.705, 215.720, 215.740, 215.750, 215.780, 215.783 & Ch. 792, 1993 OL

Hist.: LCDC 1-1990, f. & cert. ef. 2-5-90; LCDC 7-1992, f. & cert. ef. 12-10-92; LCDC 1-1994, f. & cert. ef. 3-1-94; LCDC 3-1996, f. & cert. ef. 12-23-96; LCDD 1-2002, f. & cert. ef. 5-22-02; LCDD 3-2008, f. & cert. ef. 4-18-08; LCDD 2-2011, f. & cert. ef. 2-2-11; LCDD 5-2013, f. 12-20-13, cert. ef. 1-1-14


Rule Caption: Minor and technical changes to conform to recent legislation regarding agricultural and forest land.

Adm. Order No.: LCDD 6-2013

Filed with Sec. of State: 12-20-2013

Certified to be Effective: 1-1-14

Notice Publication Date: 11-1-2013

Rules Amended: 660-033-0030, 660-033-0120, 660-033-0130, 660-033-0140

Subject: The adopted amendments modify rules to make minor and technical changes to conform to recent legislation and to correct references.

Rules Coordinator: Casaria Taylor—(503) 373-0050, ext. 322

660-033-0030

Identifying Agricultural Land

(1) All land defined as “agricultural land” in OAR 660-033-0020(1) shall be inventoried as agricultural land.

(2) When a jurisdiction determines the predominant soil capability classification of a lot or parcel it need only look to the land within the lot or parcel being inventoried. However, whether land is “suitable for farm use” requires an inquiry into factors beyond the mere identification of scientific soil classifications. The factors are listed in the definition of agricultural land set forth at OAR 660-033-0020(1)(a)(B). This inquiry requires the consideration of conditions existing outside the lot or parcel being inventoried. Even if a lot or parcel is not predominantly Class I-IV soils or suitable for farm use, Goal 3 nonetheless defines as agricultural “Lands in other classes which are necessary to permit farm practices to be undertaken on adjacent or nearby lands.” A determination that a lot or parcel is not agricultural land requires findings supported by substantial evidence that addresses each of the factors set forth in 660-033-0020(1).

(3) Goal 3 attaches no significance to the ownership of a lot or parcel when determining whether it is agricultural land. Nearby or adjacent land, regardless of ownership, shall be examined to the extent that a lot or parcel is either “suitable for farm use” or “necessary to permit farm practices to be undertaken on adjacent or nearby lands” outside the lot or parcel.

(4) When inventoried land satisfies the definition requirements of both agricultural land and forest land, an exception is not required to show why one resource designation is chosen over another. The plan need only document the factors that were used to select an agricultural, forest, agricultural/forest, or other appropriate designation.

(5)(a) More detailed data on soil capability than is contained in the USDA Natural Resources Conservation Service (NRCS) soil maps and soil surveys may be used to define agricultural land. However, the more detailed soils data shall be related to the NRCS land capability classification system.

(b) If a person concludes that more detailed soils information than that contained in the Web Soil Survey operated by the NRCS as of January 2, 2012, would assist a county to make a better determination of whether land qualifies as agricultural land, the person must request that the department arrange for an assessment of the capability of the land by a professional soil classifier who is chosen by the person, using the process described in OAR 660-033-0045.

(c) This section and OAR 660-033-0045 apply to:

(A) A change to the designation of land planned and zoned for exclusive farm use, forest use or mixed farm-forest use to a non-resource plan designation and zone on the basis that such land is not agricultural land; and

(B) Excepting land use decisions under section (7) of this rule, any other proposed land use decision in which more detailed data is used to demonstrate that land planned and zoned for exclusive farm use does not meet the definition of agricultural land under OAR 660-033-0020(1)(a)(A).

(d) This section and OAR 660-033-0045 implement ORS 215.211, effective on October 1, 2011. After this date, only those soils assessments certified by the department under section (9) of this rule may be considered by local governments in land use proceedings described in subsection (c) of this section. However, a local government may consider soils assessments that have been completed and submitted prior to October 1, 2011.

(e) This section and OAR 660-033-0045 authorize a person to obtain additional information for use in the determination of whether land qualifies as agricultural land, but do not otherwise affect the process by which a county determines whether land qualifies as agricultural land as defined by Goal 3 and OAR 660-033-0020.

(6) Any county that adopted marginal lands provisions before January 1, 1993, may continue to designate lands as “marginal lands” according to those provisions and criteria in former ORS 197.247 (1991), as long as the county has not applied the provisions of ORS 215.705 to 215.750 to lands zoned for exclusive farm use.

(7)(a) For the purposes of approving a land use application on high-value farmland under ORS 215.705, the county may change the soil class, soil rating or other soil designation of a specific lot or parcel if the property owner:

(A) Submits a statement of agreement from the NRCS that the soil class, soil rating or other soil designation should be adjusted based on new information; or

(B) Submits a report from a soils scientist whose credentials are acceptable to the Oregon Department of Agriculture that the soil class, soil rating or other soil designation should be changed; and

(C) Submits a statement from the Oregon Department of Agriculture that the Director of Agriculture or the director’s designee has reviewed the report described in paragraph (a)(B) of this section and finds the analysis in the report to be soundly and scientifically based.

(b) Soil classes, soil ratings or other soil designations used in or made pursuant to this section are those of the NRCS Web Soil Survey for that class, rating or designation before November 4, 1993, except for changes made pursuant to subsection (a) of this section.

(8) For the purposes of approving a land use application on high-value farmland under OAR 660-033-0090, 660-033-0120, 660-033-0130 and 660-033-0135, soil classes, soil ratings or other soil designations used in or made pursuant to this definition are those of the NRCS Web Soil Survey as of January 2, 2012 for that class, rating or designation.

Stat. Auth.: ORS 197.040

Stats. Implemented: ORS 197.015, 197.040, 197.230, 197.245, 215.203, 215.243 & 215.700 - 215.710

Hist.: LCDC 6-1992, f. 12-10-92, cert. ef. 8-7-93; LCDD 5-2000, f. & cert. ef. 4-24-00; LCDD 3-2008, f. & cert. ef. 4-18-08; LCDD 4-2011, f. & cert. ef. 3-16-11; LCDD 10-2011, f. & cert. ef. 12-20-11; LCDD 7-2012, f. & cert. ef. 2-14-12; LCDD 6-2013, f. 12-20-13, cert. ef. 1-1-14

660-033-0120

Uses Authorized on Agricultural Lands

The specific development and uses listed in the following table are allowed or may be allowed in the areas that qualify for the designation pursuant to this division. All uses are subject to the general provisions, special conditions, additional restrictions and exceptions set forth in this division. The abbreviations used within the schedule shall have the following meanings:

(1) A — Use is allowed. Authorization of some uses may require notice and the opportunity for a hearing because the authorization qualifies as a land use decision pursuant to ORS chapter 197. Minimum standards for uses in the table that include a numerical reference are specified in OAR 660-033-0130. Counties may prescribe additional limitations and requirements to meet local concerns only to the extent authorized by law.

(2) R — Use may be allowed, after required review. The use requires notice and the opportunity for a hearing. Minimum standards for uses in the table that include a numerical reference are specified in OAR 660-033-0130. Counties may prescribe additional limitations and requirements to meet local concerns.

(3) * — Use not allowed.

(4) # — Numerical references for specific uses shown on the chart refer to the corresponding section of OAR 660-033-0130. Where no numerical reference is noted for a use on the chart, this rule does not establish criteria for the use.

[ED. NOTE: Tables referenced are available from the agency.]

Stat. Auth.: ORS 197.040 & 197.245

Stats. Implemented: ORS 197.015, 197.040, 197.230, 197.245, 215.203, 215.243, 215.283, 215.700 - 215.710 & 215.780

Hist.: LCDC 6-1992, f. 12-10-92, cert. ef. 8-7-93; LCDC 3-1994, f. & cert. ef. 3-1-94; LCDC 6-1994, f. & cert. ef. 6-3-94; LCDC 2-1995(Temp), f. & cert. ef. 3-14-95; LCDC 7-1995, f. & cert. ef. 6-16-95; LCDC 5-1996, f. & cert. ef. 12-23-96; LCDD 2-1998, f. & cert. ef. 6-1-98; LCDD 1-2002, f. & cert. ef. 5-22-02; LCDD 1-2004, f. & cert. ef. 4-30-04; LCDD 2-2006, f. & cert. ef. 2-15-06; LCDD 3-2008, f. & cert. ef. 4-18-08; LCDD 5-2008, f. 12-31-08, cert. ef. 1-2-09; LCDD 5-2009, f. & cert. ef. 12-7-09; LCDD 6-2010, f. & cert. ef. 6-17-10; LCDD 4-2011, f. & cert. ef. 3-16-11; LCDD 9-2011, f. & cert. ef. 11-23-11; LCDD 7-2012, f. & cert. ef. 2-14-12; LCDD 6-2013, f. 12-20-13, cert. ef. 1-1-14

660-033-0130

Minimum Standards Applicable to the Schedule of Permitted and Conditional Uses

The following standards apply to uses listed in OAR 660-033-0120 where the corresponding section number is shown on the chart for a specific use under consideration. Where no numerical reference is indicated on the chart, this division does not specify any minimum review or approval criteria. Counties may include procedures and conditions in addition to those listed in the chart as authorized by law:

(1) A dwelling on farmland may be considered customarily provided in conjunction with farm use if it meets the requirements of OAR 660-033-0135.

(2)(a) No enclosed structure with a design capacity greater than 100 people, or group of structures with a total design capacity of greater than 100 people, shall be approved in connection with the use within three miles of an urban growth boundary, unless an exception is approved pursuant to ORS 197.732 and OAR chapter 660, division 4, or unless the structure is described in a master plan adopted under the provisions of OAR chapter 660, division 34.

(b) Any enclosed structures or group of enclosed structures described in subsection (a) within a tract must be separated by at least one-half mile. For purposes of this section, “tract” means a tract as defined by ORS 215.010(2) that is in existence as of June 17, 2010.

(c) Existing facilities wholly within a farm use zone may be maintained, enhanced or expanded on the same tract, subject to other requirements of law, but enclosed existing structures within a farm use zone within three miles of an urban growth boundary may not be expanded beyond the requirements of this rule.

(3)(a) A dwelling may be approved on a pre-existing lot or parcel if:

(A) The lot or parcel on which the dwelling will be sited was lawfully created and was acquired and owned continuously by the present owner as defined in subsection (3)(g) of this rule:

(i) Since prior to January 1, 1985; or

(ii) By devise or by intestate succession from a person who acquired and had owned continuously the lot or parcel since prior to January 1, 1985.

(B) The tract on which the dwelling will be sited does not include a dwelling;

(C) The lot or parcel on which the dwelling will be sited was part of a tract on November 4, 1993, no dwelling exists on another lot or parcel that was part of that tract;

(D) The proposed dwelling is not prohibited by, and will comply with, the requirements of the acknowledged comprehensive plan and land use regulations and other provisions of law;

(E) The lot or parcel on which the dwelling will be sited is not high-value farmland except as provided in subsections (3)(c) and (d) of this rule; and

(F) When the lot or parcel on which the dwelling will be sited lies within an area designated in an acknowledged comprehensive plan as habitat of big game, the siting of the dwelling is consistent with the limitations on density upon which the acknowledged comprehensive plan and land use regulations intended to protect the habitat are based.

(b) When the lot or parcel on which the dwelling will be sited is part of a tract, the remaining portions of the tract are consolidated into a single lot or parcel when the dwelling is allowed;

(c) Notwithstanding the requirements of paragraph (3)(a)(E) of this rule, a single-family dwelling may be sited on high-value farmland if:

(A) It meets the other requirements of subsections (3)(a) and (b) of this rule;

(B) The lot or parcel is protected as high-value farmland as defined in OAR 660-033-0020(8)(a);

(C) A hearings officer of a county determines that:

(i) The lot or parcel cannot practicably be managed for farm use, by itself or in conjunction with other land, due to extraordinary circumstances inherent in the land or its physical setting that do not apply generally to other land in the vicinity. For the purposes of this section, this criterion asks whether the subject lot or parcel can be physically put to farm use without undue hardship or difficulty because of extraordinary circumstances inherent in the land or its physical setting. Neither size alone nor a parcel’s limited economic potential demonstrates that a lot of parcel cannot be practicably managed for farm use. Examples of “extraordinary circumstances inherent in the land or its physical setting” include very steep slopes, deep ravines, rivers, streams, roads, railroad or utility lines or other similar natural or physical barriers that by themselves or in combination separate the subject lot or parcel from adjacent agricultural land and prevent it from being practicably managed for farm use by itself or together with adjacent or nearby farms. A lot or parcel that has been put to farm use despite the proximity of a natural barrier or since the placement of a physical barrier shall be presumed manageable for farm use;

(ii) The dwelling will comply with the provisions of ORS 215.296(1); and

(iii) The dwelling will not materially alter the stability of the overall land use pattern in the area by applying the standards set forth in paragraph (4)(a)(D) of this rule; and

(D) A local government shall provide notice of all applications for dwellings allowed under subsection (3)(c) of this rule to the Oregon Department of Agriculture. Notice shall be provided in accordance with the governing body’s land use regulations but shall be mailed at least 20 calendar days prior to the public hearing before the hearings officer under paragraph (3)(c)(C) of this rule.

(d) Notwithstanding the requirements of paragraph (3)(a)(E) of this rule, a single-family dwelling may be sited on high-value farmland if:

(A) It meets the other requirements of subsections (3)(a) and (b) of this rule;

(B) The tract on which the dwelling will be sited is:

(i) Identified in OAR 660-033-0020(8)(c) or (d);

(ii) Not high-value farmland defined in OAR 660-033-0020(8)(a); and

(iii) Twenty-one acres or less in size; and

(C) The tract is bordered on at least 67 percent of its perimeter by tracts that are smaller than 21 acres, and at least two such tracts had dwellings on January 1, 1993; or

(D) The tract is not a flaglot and is bordered on at least 25 percent of its perimeter by tracts that are smaller than 21 acres, and at least four dwellings existed on January 1, 1993, within one-quarter mile of the center of the subject tract. Up to two of the four dwellings may lie within an urban growth boundary, but only if the subject tract abuts an urban growth boundary; or

(E) The tract is a flaglot and is bordered on at least 25 percent of its perimeter by tracts that are smaller than 21 acres, and at least four dwellings existed on January 1, 1993, within one-quarter mile of the center of the subject tract and on the same side of the public road that provides access to the subject tract. The governing body of a county must interpret the center of the subject tract as the geographic center of the flaglot if the applicant makes a written request for that interpretation and that interpretation does not cause the center to be located outside the flaglot. Up to two of the four dwellings may lie within an urban growth boundary, but only if the subject tract abuts an urban growth boundary:

(i) “flaglot” means a tract containing a narrow strip or panhandle of land providing access from the public road to the rest of the tract.

(ii) “Geographic center of the flaglot” means the point of intersection of two perpendicular lines of which the first line crosses the midpoint of the longest side of a flaglot, at a 90-degree angle to the side, and the second line crosses the midpoint of the longest adjacent side of the flaglot.

(e) If land is in a zone that allows both farm and forest uses, is acknowledged to be in compliance with both Goals 3 and 4 and may qualify as an exclusive farm use zone under ORS chapter 215, a county may apply the standards for siting a dwelling under either section (3) of this rule or OAR 660-006-0027, as appropriate for the predominant use of the tract on January 1, 1993;

(f) A county may, by application of criteria adopted by ordinance, deny approval of a dwelling allowed under section (3) of this rule in any area where the county determines that approval of the dwelling would:

(A) Exceed the facilities and service capabilities of the area;

(B) Materially alter the stability of the overall land use pattern of the area; or

(C) Create conditions or circumstances that the county determines would be contrary to the purposes or intent of its acknowledged comprehensive plan or land use regulations.

(g) For purposes of subsection (3)(a) of this rule, “owner” includes the wife, husband, son, daughter, mother, father, brother, brother-in-law, sister, sister-in-law, son-in-law, daughter-in-law, mother-in-law, father-in-law, aunt, uncle, niece, nephew, stepparent, stepchild, grandparent or grandchild of the owner or a business entity owned by any one or a combination of these family members;

(h) The county assessor shall be notified that the governing body intends to allow the dwelling.

(i) When a local government approves an application for a single-family dwelling under section (3) of this rule, the application may be transferred by a person who has qualified under section (3) of this rule to any other person after the effective date of the land use decision.

(4) A single-family residential dwelling not provided in conjunction with farm use requires approval of the governing body or its designate in any farmland area zoned for exclusive farm use:

(a) In the Willamette Valley, the use may be approved if:

(A) The dwelling or activities associated with the dwelling will not force a significant change in or significantly increase the cost of accepted farming or forest practices on nearby lands devoted to farm or forest use;

(B) The dwelling will be sited on a lot or parcel that is predominantly composed of Class IV through VIII soils that would not, when irrigated, be classified as prime, unique, Class I or II soils;

(C) The dwelling will be sited on a lot or parcel created before January 1, 1993;

(D) The dwelling will not materially alter the stability of the overall land use pattern of the area. In determining whether a proposed nonfarm dwelling will alter the stability of the land use pattern in the area, a county shall consider the cumulative impact of possible new nonfarm dwellings and parcels on other lots or parcels in the area similarly situated. To address this standard, the county shall:

(i) Identify a study area for the cumulative impacts analysis. The study area shall include at least 2000 acres or a smaller area not less than 1000 acres, if the smaller area is a distinct agricultural area based on topography, soil types, land use pattern, or the type of farm or ranch operations or practices that distinguish it from other, adjacent agricultural areas. Findings shall describe the study area, its boundaries, the location of the subject parcel within this area, why the selected area is representative of the land use pattern surrounding the subject parcel and is adequate to conduct the analysis required by this standard. Lands zoned for rural residential or other urban or nonresource uses shall not be included in the study area;

(ii) Identify within the study area the broad types of farm uses (irrigated or nonirrigated crops, pasture or grazing lands), the number, location and type of existing dwellings (farm, nonfarm, hardship, etc.), and the dwelling development trends since 1993. Determine the potential number of nonfarm/lot-of-record dwellings that could be approved under subsection(3)(a) and section (4) of this rule, including identification of predominant soil classifications, the parcels created prior to January 1, 1993 and the parcels larger than the minimum lot size that may be divided to create new parcels for nonfarm dwellings under ORS 215.263(4). The findings shall describe the existing land use pattern of the study area including the distribution and arrangement of existing uses and the land use pattern that could result from approval of the possible nonfarm dwellings under this subparagraph; and

(iii) Determine whether approval of the proposed nonfarm/lot-of-record dwellings together with existing nonfarm dwellings will materially alter the stability of the land use pattern in the area. The stability of the land use pattern will be materially altered if the cumulative effect of existing and potential nonfarm dwellings will make it more difficult for the existing types of farms in the area to continue operation due to diminished opportunities to expand, purchase or lease farmland, acquire water rights or diminish the number of tracts or acreage in farm use in a manner that will destabilize the overall character of the study area; and

(E) The dwelling complies with such other conditions as the governing body or its designate considers necessary.

(b) In the Willamette Valley, on a lot or parcel allowed under OAR 660-033-0100(7), the use may be approved if:

(A) The dwelling or activities associated with the dwelling will not force a significant change in or significantly increase the cost of accepted farming or forest practices on nearby lands devoted to farm or forest use;

(B) The dwelling will not materially alter the stability of the overall land use pattern of the area. In determining whether a proposed nonfarm dwelling will alter the stability of the land use pattern in the area, a county shall consider the cumulative impact of nonfarm dwellings on other lots or parcels in the area similarly situated and whether creation of the parcel will lead to creation of other nonfarm parcels, to the detriment of agriculture in the area by applying the standards set forth in paragraph (4)(a)(D) of this rule; and

(C) The dwelling complies with such other conditions as the governing body or its designate considers necessary.

(c) In counties located outside the Willamette Valley require findings that:

(A) The dwelling or activities associated with the dwelling will not force a significant change in or significantly increase the cost of accepted farming or forest practices on nearby lands devoted to farm or forest use;

(B)(i) The dwelling is situated upon a lot or parcel, or a portion of a lot or parcel, that is generally unsuitable land for the production of farm crops and livestock or merchantable tree species, considering the terrain, adverse soil or land conditions, drainage and flooding, vegetation, location and size of the tract. A lot or parcel or portion of a lot or parcel shall not be considered unsuitable solely because of size or location if it can reasonably be put to farm or forest use in conjunction with other land; and

(ii) A lot or parcel or portion of a lot or parcel is not “generally unsuitable” simply because it is too small to be farmed profitably by itself. If a lot or parcel or portion of a lot or parcel can be sold, leased, rented or otherwise managed as a part of a commercial farm or ranch, then the lot or parcel or portion of the lot or parcel is not “generally unsuitable”. A lot or parcel or portion of a lot or parcel is presumed to be suitable if, in Western Oregon it is composed predominantly of Class I-IV soils or, in Eastern Oregon, it is composed predominantly of Class I-VI soils. Just because a lot or parcel or portion of a lot or parcel is unsuitable for one farm use does not mean it is not suitable for another farm use; or

(iii) If the parcel is under forest assessment, the dwelling shall be situated upon generally unsuitable land for the production of merchantable tree species recognized by the Forest Practices Rules, considering the terrain, adverse soil or land conditions, drainage and flooding, vegetation, location and size of the parcel. If a lot or parcel is under forest assessment, the area is not “generally unsuitable” simply because it is too small to be managed for forest production profitably by itself. If a lot or parcel under forest assessment can be sold, leased, rented or otherwise managed as a part of a forestry operation, it is not “generally unsuitable”. If a lot or parcel is under forest assessment, it is presumed suitable if, in Western Oregon, it is composed predominantly of soils capable of producing 50 cubic feet of wood fiber per acre per year, or in Eastern Oregon it is composed predominantly of soils capable of producing 20 cubic feet of wood fiber per acre per year. If a lot or parcel is under forest assessment, to be found compatible and not seriously interfere with forest uses on surrounding land it must not force a significant change in forest practices or significantly increase the cost of those practices on the surrounding land;

(C) The dwelling will not materially alter the stability of the overall land use pattern of the area. In determining whether a proposed nonfarm dwelling will alter the stability of the land use pattern in the area, a county shall consider the cumulative impact of nonfarm dwellings on other lots or parcels in the area similarly situated by applying the standards set forth in paragraph (4)(a)(D) of this rule. If the application involves the creation of a new parcel for the nonfarm dwelling, a county shall consider whether creation of the parcel will lead to creation of other nonfarm parcels, to the detriment of agriculture in the area by applying the standards set forth in paragraph (4)(a)(D) of this rule; and

(D) The dwelling complies with such other conditions as the governing body or its designate considers necessary.

(d) If a single-family dwelling is established on a lot or parcel as set forth in section (3) of this rule or OAR 660-006-0027, no additional dwelling may later be sited under the provisions of section (4) of this rule;

(e) Counties that have adopted marginal lands provisions before January 1, 1993, shall apply the standards in ORS 215.213(3) through 215.213(8) for nonfarm dwellings on lands zoned exclusive farm use that are not designated marginal or high-value farmland.

(5) Approval requires review by the governing body or its designate under ORS 215.296. Uses may be approved only where such uses:

(a) Will not force a significant change in accepted farm or forest practices on surrounding lands devoted to farm or forest use; and

(b) Will not significantly increase the cost of accepted farm or forest practices on surrounding lands devoted to farm or forest use.

(6) A facility for the primary processing of forest products shall not seriously interfere with accepted farming practices and shall be compatible with farm uses described in ORS 215.203(2). Such facility may be approved for a one-year period that is renewable and is intended to be only portable or temporary in nature. The primary processing of a forest product, as used in this section, means the use of a portable chipper or stud mill or other similar methods of initial treatment of a forest product in order to enable its shipment to market. Forest products as used in this section means timber grown upon a tract where the primary processing facility is located.

(7) A personal-use airport as used in this section means an airstrip restricted, except for aircraft emergencies, to use by the owner, and, on an infrequent and occasional basis, by invited guests, and by commercial aviation activities in connection with agricultural operations. No aircraft may be based on a personal-use airport other than those owned or controlled by the owner of the airstrip. Exceptions to the activities allowed under this definition may be granted through waiver action by the Oregon Department of Aviation in specific instances. A personal-use airport lawfully existing as of September 13, 1975, shall continue to be allowed subject to any applicable rules of the Oregon Department of Aviation.

(8)(a) A lawfully established dwelling may be altered, restored or replaced under ORS 215.213(1)(q) or 215.283(1)(p) if, when an application for a permit is submitted, the permitting authority finds to its satisfaction, based on substantial evidence that:

(A) The dwelling to be altered, restored or replaced has, or formerly had:

(i) Intact exterior walls and roof structure;

(ii) Indoor plumbing consisting of a kitchen sink, toilet and bathing facilities connected to a sanitary waste disposal system;

(iii) Interior wiring for interior lights; and

(iv) A heating system; and

(B) The dwelling was assessed as a dwelling for purposes of ad valorem taxation for the previous five property tax years, or, if the dwelling has existed for less than five years, from that time; and

(C) Notwithstanding paragraph (B), if the value of the dwelling was eliminated as a result of either of the following circumstances, the dwelling was assessed as a dwelling until such time as the value of the dwelling was eliminated:

(i) The destruction (i.e by fire or natural hazard), or demolition in the case of restoration, of the dwelling; or

(ii) The applicant establishes to the satisfaction of the permitting authority that the dwelling was improperly removed from the tax roll by a person other than the current owner. “Improperly removed” means that the dwelling has taxable value in its present state, or had taxable value when the dwelling was first removed from the tax roll or was destroyed by fire or natural hazard, and the county stopped assessing the dwelling even though the current or former owner did not request removal of the dwelling from the tax roll.

(b) For replacement of a lawfully established dwelling under ORS 215.213(1)(q) or 215.283(1)(p):

(A) The dwelling to be replaced must be removed, demolished or converted to an allowable nonresidential use:

(i) Within one year after the date the replacement dwelling is certified for occupancy pursuant to ORS 455.055; or

(ii) If the dwelling to be replaced is, in the discretion of the permitting authority, in such a state of disrepair that the structure is unsafe for occupancy or constitutes an attractive nuisance, on or before a date set by the permitting authority that is not less than 90 days after the replacement permit is issued; and

(iii) If a dwelling is removed by moving it off the subject parcel to another location, the applicant must obtain approval from the permitting authority for the new location.

(B) The applicant must cause to be recorded in the deed records of the county a statement that the dwelling to be replaced has been removed, demolished or converted.

(C) As a condition of approval, if the dwelling to be replaced is located on a portion of the lot or parcel that is not zoned for exclusive farm use, the applicant shall execute and cause to be recorded in the deed records of the county in which the property is located a deed restriction prohibiting the siting of another dwelling on that portion of the lot or parcel. The restriction imposed is irrevocable unless the county planning director, or the director’s designee, places a statement of release in the deed records of the county to the effect that the provisions of 2013 Oregon Laws, chapter 462, section 2 and either ORS 215.213 or 215.283 regarding replacement dwellings have changed to allow the lawful siting of another dwelling.

(D) The county planning director, or the director’s designee, shall maintain a record of:

(i) The lots and parcels for which dwellings to be replaced have been removed, demolished or converted; and

(ii) The lots and parcels that do not qualify for the siting of a new dwelling under subsection (b) of this section, including a copy of the deed restrictions filed under paragraph (B) of this subsection.

(c) A replacement dwelling under ORS 215.213(1)(q) or 215.283(1)(p) must comply with applicable building codes, plumbing codes, sanitation codes and other requirements relating to health and safety or to siting at the time of construction. However, the standards may not be applied in a manner that prohibits the siting of the replacement dwelling.

(A) The siting standards of paragraph (B) of this subsection apply when a dwelling under ORS 215.213(1)(q) or 215.213(1)(p) qualifies for replacement because the dwelling:

(i) Formerly had the features described in paragraph (a)(A) of this section;

(ii) Was removed from the tax roll as described in paragraph (C) of subsection (a); or

(iii) Had a permit that expired as described under paragraph (d)(C) of this section.

(B) The replacement dwelling must be sited on the same lot or parcel:

(i) Using all or part of the footprint of the replaced dwelling or near a road, ditch, river, property line, forest boundary or another natural boundary of the lot or parcel; and

(ii) If possible, for the purpose of minimizing the adverse impacts on resource use of land in the area, within a concentration or cluster of structures or within 500 yards of another structure.

(C) Replacement dwellings that currently have the features described in paragraph (a)(A) of this subsection and that have been on the tax roll as described in paragraph (B) of subsection (a) may be sited on any part of the same lot or parcel.

(d) A replacement dwelling permit that is issued under ORS 215.213(1)(q) or 215.283(1)(p):

(A) Is a land use decision as defined in ORS 197.015 where the dwelling to be replaced:

(i) Formerly had the features described in paragraph (a)(A) of this section; or

(ii) Was removed from the tax roll as described in paragraph (a)(C) of this section;

(B) Is not subject to the time to act limits of ORS 215.417; and

(C) If expired before January 1, 2014, shall be deemed to be valid and effective if, before January 1, 2015, the holder of the permit:

(i) Removes, demolishes or converts to an allowable nonresidential use the dwelling to be replaced; and

(ii) Causes to be recorded in the deed records of the county a statement that the dwelling to be replaced has been removed, demolished or converted.

(9)(a) To qualify for a relative farm help dwelling, a dwelling shall be occupied by relatives whose assistance in the management and farm use of the existing commercial farming operation is required by the farm operator. The farm operator shall continue to play the predominant role in the management and farm use of the farm. A farm operator is a person who operates a farm, doing the work and making the day-to-day decisions about such things as planting, harvesting, feeding and marketing.

(b) Notwithstanding ORS 92.010 to 92.192 or the minimum lot or parcel requirements under 215.780, if the owner of a dwelling described in this section obtains construction financing or other financing secured by the dwelling and the secured party forecloses on the dwelling, the secured party may also foreclose on the “homesite,” as defined in 308A.250, and the foreclosure shall operate as a partition of the homesite to create a new parcel. Prior conditions of approval for the subject land and dwelling remain in effect.

(c) For the purpose of subsection(b), “foreclosure” means only those foreclosures that are exempt from partition under ORS 92.010(9)(a).

(10) A manufactured dwelling, or recreational vehicle, or the temporary residential use of an existing building allowed under this provision is a temporary use for the term of the hardship suffered by the existing resident or relative as defined in ORS Chapter 215. The manufactured dwelling shall use the same subsurface sewage disposal system used by the existing dwelling, if that disposal system is adequate to accommodate the additional dwelling. If the manufactured home will use a public sanitary sewer system, such condition will not be required. Governing bodies shall review the permit authorizing such manufactured homes every two years. Within three months of the end of the hardship, the manufactured dwelling or recreational vehicle shall be removed or demolished or, in the case of an existing building, the building shall be removed, demolished or returned to an allowed nonresidential use. A temporary residence approved under this section is not eligible for replacement under 215.213(1)(q) or 215.283(1)(p). Department of Environmental Quality review and removal requirements also apply. As used in this section “hardship” means a medical hardship or hardship for the care of an aged or infirm person or persons.

(11) Subject to the issuance of a license, permit or other approval by the Department of Environmental Quality under ORS 454.695, 459.205, 468B.050, 468B.053 or 468B.055, or in compliance with rules adopted under 468B.095, and with the requirements of 215.246, 215.247, 215.249 and 215.251, the land application of reclaimed water, agricultural process or industrial process water or biosolids for agricultural, horticultural or silvicultural production, or for irrigation in connection with a use allowed in an exclusive farm use zones under this division is allowed.

(12) In order to meet the requirements specified in the statute, a historic dwelling shall be listed on the National Register of Historic Places.

(13) Roads, highways and other transportation facilities, and improvements not otherwise allowed under this rule may be established, subject to the adoption of the governing body or its designate of an exception to Goal 3, Agricultural Lands, and to any other applicable goal with which the facility or improvement does not comply. In addition, transportation uses and improvements may be authorized under conditions and standards as set forth in OAR 660-012-0035 and 660-012-0065.

(14) Home occupations and the parking of vehicles may be authorized. Home occupations shall be operated substantially in the dwelling or other buildings normally associated with uses permitted in the zone in which the property is located. A home occupation shall be operated by a resident or employee of a resident of the property on which the business is located, and shall employ on the site no more than five full-time or part-time persons.

(15) New uses that batch and blend mineral and aggregate into asphalt cement may not be authorized within two miles of a planted vineyard. Planted vineyard means one or more vineyards totaling 40 acres or more that are planted as of the date the application for batching and blending is filed.

(16)(a) A utility facility established under ORS 215.213(1)(c) or 215.283(1)(c) is necessary for public service if the facility must be sited in an exclusive farm use zone in order to provide the service. To demonstrate that a utility facility is necessary, an applicant must:

(A) Show that reasonable alternatives have been considered and that the facility must be sited in an exclusive farm use zone due to one or more of the following factors:

(i) Technical and engineering feasibility;

(ii) The proposed facility is locationally-dependent. A utility facility is locationally-dependent if it must cross land in one or more areas zoned for exclusive farm use in order to achieve a reasonably direct route or to meet unique geographical needs that cannot be satisfied on other lands;

(iii) Lack of available urban and nonresource lands;

(iv) Availability of existing rights of way;

(v) Public health and safety; and

(vi) Other requirements of state and federal agencies.

(B) Costs associated with any of the factors listed in paragraph (A) of this subsection may be considered, but cost alone may not be the only consideration in determining that a utility facility is necessary for public service. Land costs shall not be included when considering alternative locations for substantially similar utility facilities and the siting of utility facilities that are not substantially similar.

(C) The owner of a utility facility approved under this section shall be responsible for restoring, as nearly as possible, to its former condition any agricultural land and associated improvements that are damaged or otherwise disturbed by the siting, maintenance, repair or reconstruction of the facility. Nothing in this paragraph shall prevent the owner of the utility facility from requiring a bond or other security from a contractor or otherwise imposing on a contractor the responsibility for restoration.

(D) The governing body of the county or its designee shall impose clear and objective conditions on an application for utility facility siting to mitigate and minimize the impacts of the proposed facility, if any, on surrounding lands devoted to farm use in order to prevent a significant change in accepted farm practices or a significant increase in the cost of farm practices on surrounding farmlands.

(E) Utility facilities necessary for public service may include on-site and off-site facilities for temporary workforce housing for workers constructing a utility facility. Such facilities must be removed or converted to an allowed use under OAR 660-033-0130(19) or other statute or rule when project construction is complete. Off-site facilities allowed under this paragraph are subject to 660-033-0130(5). Temporary workforce housing facilities not included in the initial approval may be considered through a minor amendment request. A minor amendment request shall have no effect on the original approval.

(F) In addition to the provisions of paragraphs (A) to (D) of this subsection, the establishment or extension of a sewer system as defined by OAR 660-011-0060(1)(f) in an exclusive farm use zone shall be subject to the provisions of 660-011-0060.

(G) The provisions of paragraphs (A) to (D) of this subsection do not apply to interstate natural gas pipelines and associated facilities authorized by and subject to regulation by the Federal Energy Regulatory Commission.

(b) An associated transmission line is necessary for public service and shall be approved by the governing body of a county or its designee if an applicant for approval under ORS 215.213(1)(c) or 215.283(1)(c) demonstrates to the governing body of a county or its designee that the associated transmission line meets either the requirements of paragraph (A) of this subsection or the requirements of paragraph (B) of this subsection.

(A) An applicant demonstrates that the entire route of the associated transmission line meets at least one of the following requirements:

(i) The associated transmission line is not located on high-value farmland, as defined in ORS 195.300, or on arable land;

(ii) The associated transmission line is co-located with an existing transmission line;

(iii) The associated transmission line parallels an existing transmission line corridor with the minimum separation necessary for safety; or

(iv) The associated transmission line is located within an existing right of way for a linear facility, such as a transmission line, road or railroad, that is located above the surface of the ground.

(B) After an evaluation of reasonable alternatives, an applicant demonstrates that the entire route of the associated transmission line meets, subject to paragraphs (C) and (D) of this subsection, two or more of the following criteria:

(i) Technical and engineering feasibility;

(ii) The associated transmission line is locationally-dependent because the associated transmission line must cross high-value farmland, as defined in ORS 195.300, or arable land to achieve a reasonably direct route or to meet unique geographical needs that cannot be satisfied on other lands;

(iii) Lack of an available existing right of way for a linear facility, such as a transmission line, road or railroad, that is located above the surface of the ground;

(iv) Public health and safety; or

(v) Other requirements of state or federal agencies.

(C) As pertains to paragraph (B), the applicant shall present findings to the governing body of the county or its designee on how the applicant will mitigate and minimize the impacts, if any, of the associated transmission line on surrounding lands devoted to farm use in order to prevent a significant change in accepted farm pratices or a significant increase in the cost of farm practices on the surrounding farmland.

(D) The governing body of a county or its designee may consider costs associated with any of the factors listed in paragraph (B) of this subsection, but consideration of cost may not be the only consideration in determining whether the associated transmission line is necessary for public service.

(17) A power generation facility may include on-site and off-site facilities for temporary workforce housing for workers constructing a power generation facility. Such facilities must be removed or converted to an allowed use under OAR 660-033-0130(19) or other statute or rule when project construction is complete. Temporary workforce housing facilities not included in the initial approval may be considered through a minor amendment request. A minor amendment request shall be subject to 660-033-0130(5) and shall have no effect on the original approval. Permanent features of a power generation facility shall not preclude more than 12 acres from use as a commercial agricultural enterprise unless an exception is taken pursuant to ORS 197.732 and OAR chapter 660, division 4.

(18)(a) Existing facilities wholly within a farm use zone may be maintained, enhanced or expanded on the same tract, subject to other requirements of law. An existing golf course may be expanded consistent with the requirements of sections (5) and (20) of this rule, but shall not be expanded to contain more than 36 total holes.

(b) In addition to and not in lieu of the authority in ORS 215.130 to continue, alter, restore or replace a use that has been disallowed by the enactment or amendment of a zoning ordinance or regulation, a use formerly allowed pursuant to 215.213(1)(a) or 215.283(1)(a), as in effect before January 1, 2010, the effective date of 2009 Oregon Laws, chapter 850, section 14, may be expanded subject to:

(A) The requirements of subsection (c) of this section; and

(B) Conditional approval of the county in the manner provided in ORS 215.296.

(c) A nonconforming use described in subsection (b) of this section may be expanded under this section if:

(A) The use was established on or before January 1, 2009; and

(B) The expansion occurs on:

(i) The tax lot on which the use was established on or before January 1, 2009; or

(ii) A tax lot that is contiguous to the tax lot described in subparagraph (i) of this paragraph and that was owned by the applicant on January 1, 2009.

(19)(a) Except on a lot or parcel contiguous to a lake or reservoir, private campgrounds shall not be allowed within three miles of an urban growth boundary unless an exception is approved pursuant to ORS 197.732 and OAR chapter 660, division 4. A campground is an area devoted to overnight temporary use for vacation, recreational or emergency purposes, but not for residential purposes and is established on a site or is contiguous to lands with a park or other outdoor natural amenity that is accessible for recreational use by the occupants of the campground. A campground shall be designed and integrated into the rural agricultural and forest environment in a manner that protects the natural amenities of the site and provides buffers of existing native trees and vegetation or other natural features between campsites. Campgrounds authorized by this rule shall not include intensively developed recreational uses such as swimming pools, tennis courts, retail stores or gas stations. Overnight temporary use in the same campground by a camper or camper’s vehicle shall not exceed a total of 30 days during any consecutive six-month period.

(b) Campsites may be occupied by a tent, travel trailer, yurt or recreational vehicle. Separate sewer, water or electric service hook-ups shall not be provided to individual camp sites except that electrical service may be provided to yurts allowed for by subsection (19)(c) of this rule.

(c) Subject to the approval of the county governing body or its designee, a private campground may provide yurts for overnight camping. No more than one-third or a maximum of 10 campsites, whichever is smaller, may include a yurt. The yurt shall be located on the ground or on a wood floor with no permanent foundation. Upon request of a county governing body, the commission may provide by rule for an increase in the number of yurts allowed on all or a portion of the campgrounds in a county if the commission determines that the increase will comply with the standards described in ORS 215.296(1). As used in this section, “yurt” means a round, domed shelter of cloth or canvas on a collapsible frame with no plumbing, sewage disposal hook-up or internal cooking appliance.

(20) “Golf Course” means an area of land with highly maintained natural turf laid out for the game of golf with a series of nine or more holes, each including a tee, a fairway, a putting green, and often one or more natural or artificial hazards. A “golf course” for purposes of ORS 215.213(2)(f), 215.283(2)(f), and this division means a nine or 18 hole regulation golf course or a combination nine and 18 hole regulation golf course consistent with the following:

(a) A regulation 18 hole golf course is generally characterized by a site of about 120 to 150 acres of land, has a playable distance of 5,000 to 7,200 yards, and a par of 64 to 73 strokes;

(b) A regulation nine hole golf course is generally characterized by a site of about 65 to 90 acres of land, has a playable distance of 2,500 to 3,600 yards, and a par of 32 to 36 strokes;

(c) Non-regulation golf courses are not allowed uses within these areas. “Non-regulation golf course” means a golf course or golf course-like development that does not meet the definition of golf course in this rule, including but not limited to executive golf courses, Par three golf courses, pitch and putt golf courses, miniature golf courses and driving ranges;

(d) Counties shall limit accessory uses provided as part of a golf course consistent with the following standards:

(A) An accessory use to a golf course is a facility or improvement that is incidental to the operation of the golf course and is either necessary for the operation and maintenance of the golf course or that provides goods or services customarily provided to golfers at a golf course. An accessory use or activity does not serve the needs of the non-golfing public. Accessory uses to a golf course may include: Parking; maintenance buildings; cart storage and repair; practice range or driving range; clubhouse; restrooms; lockers and showers; food and beverage service; pro shop; a practice or beginners course as part of an 18 hole or larger golf course; or golf tournament. Accessory uses to a golf course do not include: Sporting facilities unrelated to golfing such as tennis courts, swimming pools, and weight rooms; wholesale or retail operations oriented to the non-golfing public; or housing;

(B) Accessory uses shall be limited in size and orientation on the site to serve the needs of persons and their guests who patronize the golf course to golf. An accessory use that provides commercial services (e.g., pro shop, etc.) shall be located in the clubhouse rather than in separate buildings; and

(C) Accessory uses may include one or more food and beverage service facilities in addition to food and beverage service facilities located in a clubhouse. Food and beverage service facilities must be part of and incidental to the operation of the golf course and must be limited in size and orientation on the site to serve only the needs of persons who patronize the golf course and their guests. Accessory food and beverage service facilities shall not be designed for or include structures for banquets, public gatherings or public entertainment.

(21) “Living History Museum” means a facility designed to depict and interpret everyday life and culture of some specific historic period using authentic buildings, tools, equipment and people to simulate past activities and events. As used in this rule, a living history museum shall be related to resource based activities and shall be owned and operated by a governmental agency or a local historical society. A living history museum may include limited commercial activities and facilities that are directly related to the use and enjoyment of the museum and located within authentic buildings of the depicted historic period or the museum administration building, if areas other than an exclusive farm use zone cannot accommodate the museum and related activities or if the museum administration buildings and parking lot are located within one quarter mile of an urban growth boundary. “Local historical society” means the local historical society, recognized as such by the county governing body and organized under ORS Chapter 65.

(22) A power generation facility may include on-site and off-site facilities for temporary workforce housing for workers constructing a power generation facility. Such facilities must be removed or converted to an allowed use under OAR 660-033-0130(19) or other statute or rule when project construction is complete. Temporary workforce housing facilities not included in the initial approval may be considered through a minor amendment request. A minor amendment request shall be subject to 660-033-0130(5) and shall have no effect on the original approval. Permanent features of a power generation facility shall not preclude more than 20 acres from use as a commercial agricultural enterprise unless an exception is taken pursuant to ORS 197.732 and OAR chapter 660, division 4.

(23) A farm stand may be approved if:

(a) The structures are designed and used for sale of farm crops and livestock grown on the farm operation, or grown on the farm operation and other farm operations in the local agricultural area, including the sale of retail incidental items and fee-based activity to promote the sale of farm crops or livestock sold at the farm stand if the annual sales of the incidental items and fees from promotional activity do not make up more than 25 percent of the total annual sales of the farm stand; and

(b) The farm stand does not include structures designed for occupancy as a residence or for activities other than the sale of farm crops and livestock and does not include structures for banquets, public gatherings or public entertainment.

(c) As used in this section, “farm crops or livestock” includes both fresh and processed farm crops and livestock grown on the farm operation, or grown on the farm operation and other farm operations in the local agricultural area. As used in this subsection, “processed crops and livestock” includes jams, syrups, apple cider, animal products and other similar farm crops and livestock that have been processed and converted into another product but not prepared food items.

(d) As used in this section, “local agricultural area” includes Oregon or an adjacent county in Washington, Idaho, Nevada or California that borders the Oregon county in which the farm stand is located.

(24) Accessory farm dwellings as defined by subsection (e) of this section may be considered customarily provided in conjunction with farm use if:

(a) Each accessory farm dwelling meets all the following requirements:

(A) The accessory farm dwelling will be occupied by a person or persons who will be principally engaged in the farm use of the land and whose seasonal or year-round assistance in the management of the farm use, such as planting, harvesting, marketing or caring for livestock, is or will be required by the farm operator;

(B) The accessory farm dwelling will be located:

(i) On the same lot or parcel as the primary farm dwelling;

(ii) On the same tract as the primary farm dwelling when the lot or parcel on which the accessory farm dwelling will be sited is consolidated into a single parcel with all other contiguous lots and parcels in the tract;

(iii) On a lot or parcel on which the primary farm dwelling is not located, when the accessory farm dwelling is limited to only a manufactured dwelling with a deed restriction. The deed restriction shall be filed with the county clerk and require the manufactured dwelling to be removed when the lot or parcel is conveyed to another party. The manufactured dwelling may remain if it is reapproved under these rules;

(iv) On any lot or parcel, when the accessory farm dwelling is limited to only attached multi-unit residential structures allowed by the applicable state building code or similar types of farmworker housing as that existing on farm or ranch operations registered with the Department of Consumer and Business Services, Oregon Occupational Safety and Health Division under ORS 658.750. A county shall require all accessory farm dwellings approved under this subparagraph to be removed, demolished or converted to a nonresidential use when farmworker housing is no longer required. “Farmworker housing” shall have the meaning set forth in 215.278 and not the meaning in 315.163; or

(v) On a lot or parcel on which the primary farm dwelling is not located, when the accessory farm dwelling is located on a lot or parcel at least the size of the applicable minimum lot size under ORS 215.780 and the lot or parcel complies with the gross farm income requirements in OAR 660-033-0135(3) or (4), whichever is applicable; and

(C) There is no other dwelling on the lands designated for exclusive farm use owned by the farm operator that is vacant or currently occupied by persons not working on the subject farm or ranch and that could reasonably be used as an accessory farm dwelling.

(b) In addition to the requirements in subsection (a) of this section, the primary farm dwelling to which the proposed dwelling would be accessory, meets one of the following:

(A) On land not identified as high-value farmland, the primary farm dwelling is located on a farm or ranch operation that is currently employed for farm use, as defined in ORS 215.203, on which, in each of the last two years or three of the last five years or in an average of three of the last five years, the farm operator earned the lower of the following:

(i) At least $40,000 in gross annual income from the sale of farm products. In determining the gross income, the cost of purchased livestock shall be deducted from the total gross income attributed to the tract; or

(ii) Gross annual income of at least the midpoint of the median income range of gross annual sales for farms in the county with the gross annual sales of $10,000 or more according to the 1992 Census of Agriculture, Oregon. In determining the gross income, the cost of purchased livestock shall be deducted from the total gross income attributed to the tract;

(B) On land identified as high-value farmland, the primary farm dwelling is located on a farm or ranch operation that is currently employed for farm use, as defined in ORS 215.203, on which the farm operator earned at least $80,000 in gross annual income from the sale of farm products in each of the last two years or three of the last five years or in an average of three of the last five years. In determining the gross income, the cost of purchased livestock shall be deducted from the total gross income attributed to the tract;

(C) On land not identified as high-value farmland in counties that have adopted marginal lands provisions under former ORS 197.247 (1991 Edition) before January 1, 1993, the primary farm dwelling is located on a farm or ranch operation that meets the standards and requirements of 215.213(2)(a) or (b) or paragraph (A) of this subsection; or

(D) It is located on a commercial dairy farm as defined by OAR 660-033-0135(8); and

(i) The building permits, if required, have been issued and construction has begun or been completed for the buildings and animal waste facilities required for a commercial dairy farm;

(ii) The Oregon Department of Agriculture has approved a permit for a “confined animal feeding operation” under ORS 468B.050 and 468B.200 to 468B.230; and

(iii) A Producer License for the sale of dairy products under ORS 621.072.

(c) The governing body of a county shall not approve any proposed division of a lot or parcel for an accessory farm dwelling approved pursuant to this section. If it is determined that an accessory farm dwelling satisfies the requirements of OAR 660-033-0135, a parcel may be created consistent with the minimum parcel size requirements in 660-033-0100.

(d) An accessory farm dwelling approved pursuant to this section cannot later be used to satisfy the requirements for a dwelling not provided in conjunction with farm use pursuant to section (4) of this rule.

(e) For the purposes of OAR 660-033-0130(24), “accessory farm dwelling” includes all types of residential structures allowed by the applicable state building code.

(25) In counties that have adopted marginal lands provisions under former ORS 197.247 (1991 Edition) before January 1, 1993, an armed forces reserve center is allowed, if the center is within one-half mile of a community college. An “armed forces reserve center” includes an armory or National Guard support facility.

(26) Buildings and facilities associated with a site for the takeoff and landing of model aircraft shall not be more than 500 square feet in floor area or placed on a permanent foundation unless the building or facility preexisted the use approved under this section. The site shall not include an aggregate surface or hard surface area unless the surface preexisted the use approved under this section. An owner of property used for the purpose authorized in this section may charge a person operating the use on the property rent for the property. An operator may charge users of the property a fee that does not exceed the operator’s cost to maintain the property, buildings and facilities. As used in this section, “model aircraft” means a small-scale version of an airplane, glider, helicopter, dirigible or balloon that is used or intended to be used for flight and is controlled by radio, lines or design by a person on the ground.

(27) Insect species shall not include any species under quarantine by the Oregon Department of Agriculture or the United States Department of Agriculture. The county shall provide notice of all applications under this section to the Oregon Department of Agriculture. Notice shall be provided in accordance with the county’s land use regulations but shall be mailed at least 20 calendar days prior to any administrative decision or initial public hearing on the application.

(28) A farm on which a processing facility is located must provide at least one-quarter of the farm crops processed at the facility. A farm may also be used for an establishment for the slaughter, processing or selling of poultry or poultry products pursuant to ORS 603.038. If a building is established or used for the processing facility or establishment, the farm operator may not devote more than 10,000 square feet of floor area to the processing facility or establishment, exclusive of the floor area designated for preparation, storage or other farm use. A processing facility or establishment must comply with all applicable siting standards but the standards may not be applied in a manner that prohibits the siting of the processing facility or establishment. A county may not approve any division of a lot or parcel that separates a processing facility or establishment from the farm operation on which it is located.

(29)(a) Composting operations and facilities allowed on high-value farmland are limited to those that are accepted farming practices in conjunction with and auxiliary to farm use on the subject tract, and that meet the performance and permitting requirements of the Department of Environmental Quality under OAR 340-093-0050 and 340-096-0060. Excess compost may be sold to neighboring farm operations in the local area and shall be limited to bulk loads of at least one unit (7.5 cubic yards) in size. Buildings and facilities used in conjunction with the composting operation shall only be those required for the operation of the subject facility.

(b) Composting operations and facilities allowed on land not defined as high-value farmland shall meet the performance and permitting requirements of the Department of Environmental Quality under OAR 340-093-0050 and 340-096-0060. Composting operations that are accepted farming practices in conjunction with and auxiliary to farm use on the subject tract are allowed uses, while other composting operations are subject to the review standards of ORS 215.296. Buildings and facilities used in conjunction with the composting operation shall only be those required for the operation of the subject facility. Onsite sales shall be limited to bulk loads of at least one unit (7.5 cubic yards) in size that are transported in one vehicle.

(30) The County governing body or its designate shall require as a condition of approval of a single-family dwelling under ORS 215.213, 215.283 or 215.284 or otherwise in a farm or forest zone, that the landowner for the dwelling sign and record in the deed records for the county a document binding the landowner, and the landowner’s successors in interest, prohibiting them from pursuing a claim for relief or cause of action alleging injury from farming or forest practices for which no action or claim is allowed under 30.936 or 30.937.

(31) Public parks including only the uses specified under OAR 660-034-0035 or 660-034-0040, whichever is applicable.

(32) Utility facility service lines are utility lines and accessory facilities or structures that end at the point where the utility service is received by the customer and that are located on one or more of the following:

(a) A public right of way;

(b) Land immediately adjacent to a public right of way, provided the written consent of all adjacent property owners has been obtained; or

(c) The property to be served by the utility.

(33) An outdoor mass gathering as defined in ORS 433.735 or other gathering of 3,000 or fewer persons that is not anticipated to continue for more than 120 hours in any three-month period is not a “land use decision” as defined in 197.015(10) or subject to review under this division. Agri-tourism and other commercial events or activities may not be permitted as mass gatherings under 215.213(11) and 215.283(4).

(34) Any outdoor gathering of more than 3,000 persons that is anticipated to continue for more than 120 hours in any three-month planning period is subject to review by a county planning commission under the provisions of ORS 433.763.

(35)(a) As part of the conditional use approval process under ORS 215.296 and OAR 660-033-0130(5), for the purpose of verifying the existence, continuity and nature of the business described in ORS 215.213(2)(w) or 215.283(2)(y), representatives of the business may apply to the county and submit evidence including, but not limited to, sworn affidavits or other documentary evidence that the business qualifies; and

(b) Alteration, restoration or replacement of a use authorized in ORS 215.213(2)(w) or 215.283(2)(y) may be altered, restored or replaced pursuant to 215.130(5), (6) and (9).

(36) For counties subject to ORS 215.283 and not 215.213, a community center authorized under this section may provide services to veterans, including but not limited to emergency and transitional shelter, preparation and service of meals, vocational and educational counseling and referral to local, state or federal agencies providing medical, mental health, disability income replacement and substance abuse services, only in a facility that is in existence on January 1, 2006. The services may not include direct delivery of medical, mental health, disability income replacement or substance abuse services.

(37) For purposes of this rule a wind power generation facility includes, but is not limited to, the following system components: all wind turbine towers and concrete pads, permanent meteorological towers and wind measurement devices, electrical cable collection systems connecting wind turbine towers with the relevant power substation, new or expanded private roads (whether temporary or permanent) constructed to serve the wind power generation facility, office and operation and maintenance buildings, temporary lay-down areas and all other necessary appurtenances, including but not limited to on-site and off-site facilities for temporary workforce housing for workers constructing a wind power generation facility. Such facilities must be removed or converted to an allowed use under OAR 660-033-0130(19) or other statute or rule when project construction is complete. Temporary workforce housing facilities not included in the initial approval may be considered through a minor amendment request filed after a decision to approve a power generation facility. A minor amendment request shall be subject to 660-033-0130(5) and shall have no effect on the original approval. A proposal for a wind power generation facility shall be subject to the following provisions:

(a) For high-value farmland soils described at ORS 195.300(10), the governing body or its designate must find that all of the following are satisfied:

(A) Reasonable alternatives have been considered to show that siting the wind power generation facility or component thereof on high-value farmland soils is necessary for the facility or component to function properly or if a road system or turbine string must be placed on such soils to achieve a reasonably direct route considering the following factors:

(i) Technical and engineering feasibility;

(ii) Availability of existing rights of way; and

(iii) The long term environmental, economic, social and energy consequences of siting the facility or component on alternative sites, as determined under paragraph (B);

(B) The long-term environmental, economic, social and energy consequences resulting from the wind power generation facility or any components thereof at the proposed site with measures designed to reduce adverse impacts are not significantly more adverse than would typically result from the same proposal being located on other agricultural lands that do not include high-value farmland soils;

(C) Costs associated with any of the factors listed in paragraph (A) may be considered, but costs alone may not be the only consideration in determining that siting any component of a wind power generation facility on high-value farmland soils is necessary;

(D) The owner of a wind power generation facility approved under subsection (a) shall be responsible for restoring, as nearly as possible, to its former condition any agricultural land and associated improvements that are damaged or otherwise disturbed by the siting, maintenance, repair or reconstruction of the facility. Nothing in this subsection shall prevent the owner of the facility from requiring a bond or other security from a contractor or otherwise imposing on a contractor the responsibility for restoration; and

(E) The criteria of subsection (b) are satisfied.

(b) For arable lands, meaning lands that are cultivated or suitable for cultivation, including high-value farmland soils described at ORS 195.300(10), the governing body or its designate must find that:

(A) The proposed wind power facility will not create unnecessary negative impacts on agricultural operations conducted on the subject property. Negative impacts could include, but are not limited to, the unnecessary construction of roads, dividing a field or multiple fields in such a way that creates small or isolated pieces of property that are more difficult to farm, and placing wind farm components such as meteorological towers on lands in a manner that could disrupt common and accepted farming practices;

(B) The presence of a proposed wind power facility will not result in unnecessary soil erosion or loss that could limit agricultural productivity on the subject property. This provision may be satisfied by the submittal and county approval of a soil and erosion control plan prepared by an adequately qualified individual, showing how unnecessary soil erosion will be avoided or remedied and how topsoil will be stripped, stockpiled and clearly marked. The approved plan shall be attached to the decision as a condition of approval;

(C) Construction or maintenance activities will not result in unnecessary soil compaction that reduces the productivity of soil for crop production. This provision may be satisfied by the submittal and county approval of a plan prepared by an adequately qualified individual, showing how unnecessary soil compaction will be avoided or remedied in a timely manner through deep soil decompaction or other appropriate practices. The approved plan shall be attached to the decision as a condition of approval; and

(D) Construction or maintenance activities will not result in the unabated introduction or spread of noxious weeds and other undesirable weeds species. This provision may be satisfied by the submittal and county approval of a weed control plan prepared by an adequately qualified individual that includes a long-term maintenance agreement. The approved plan shall be attached to the decision as a condition of approval.

(c) For nonarable lands, meaning lands that are not suitable for cultivation, the governing body or its designate must find that the requirements of OAR 660-033-0130(37)(b)(D) are satisfied.

(d) In the event that a wind power generation facility is proposed on a combination of arable and nonarable lands as described in OAR 660-033-0130(37)(b) and (c) the approval criteria of 660-033-0130(37)(b) shall apply to the entire project.

(38) A proposal to site a photovoltaic solar power generation facility shall be subject to the following definitions and provisions:

(a) “Arable land” means land in a tract that is predominantly cultivated or, if not currently cultivated, predominantly comprised of arable soils.

(b) “Arable soils” means soils that are suitable for cultivation as determined by the governing body or its designate based on substantial evidence in the record of a local land use application, but “arable soils” does not include high-value farmland soils described at ORS 195.300(10) unless otherwise stated.

(c) “Nonarable land” means land in a tract that is predominantly not cultivated and predominantly comprised of nonarable soils.

(d) “Nonarable soils” means soils that are not suitable for cultivation. Soils with an NRCS agricultural capability class V–VIII and no history of irrigation shall be considered nonarable in all cases. The governing body or its designate may determine other soils, including soils with a past history of irrigation, to be nonarable based on substantial evidence in the record of a local land use application.

(e) “Photovoltaic solar power generation facility” includes, but is not limited to, an assembly of equipment that converts sunlight into electricity and then stores, transfers, or both, that electricity. This includes photovoltaic modules, mounting and solar tracking equipment, foundations, inverters, wiring, storage devices and other components. Photovoltaic solar power generation facilities also include electrical cable collection systems connecting the photovoltaic solar generation facility to a transmission line, all necessary grid integration equipment, new or expanded private roads constructed to serve the photovoltaic solar power generation facility, office, operation and maintenance buildings, staging areas and all other necessary appurtenances. For purposes of applying the acreage standards of this section, a photovoltaic solar power generation facility includes all existing and proposed facilities on a single tract, as well as any existing and proposed facilities determined to be under common ownership on lands with fewer than 1320 feet of separation from the tract on which the new facility is proposed to be sited. Projects connected to the same parent company or individuals shall be considered to be in common ownership, regardless of the operating business structure. A photovoltaic solar power generation facility does not include a net metering project established consistent with ORS 757.300 and OAR chapter 860, division 39 or a Feed-in-Tariff project established consistent with ORS 757.365 and OAR chapter 860, division 84.

(f) For high-value farmland described at ORS 195.300(10), a photovoltaic solar power generation facility shall not preclude more than 12 acres from use as a commercial agricultural enterprise unless an exception is taken pursuant to ORS 197.732 and OAR chapter 660, division 4. The governing body or its designate must find that:

(A) The proposed photovoltaic solar power generation facility will not create unnecessary negative impacts on agricultural operations conducted on any portion of the subject property not occupied by project components. Negative impacts could include, but are not limited to, the unnecessary construction of roads dividing a field or multiple fields in such a way that creates small or isolated pieces of property that are more difficult to farm, and placing photovoltaic solar power generation facility project components on lands in a manner that could disrupt common and accepted farming practices;

(B) The presence of a photovoltaic solar power generation facility will not result in unnecessary soil erosion or loss that could limit agricultural productivity on the subject property. This provision may be satisfied by the submittal and county approval of a soil and erosion control plan prepared by an adequately qualified individual, showing how unnecessary soil erosion will be avoided or remedied and how topsoil will be stripped, stockpiled and clearly marked. The approved plan shall be attached to the decision as a condition of approval;

(C) Construction or maintenance activities will not result in unnecessary soil compaction that reduces the productivity of soil for crop production. This provision may be satisfied by the submittal and county approval of a plan prepared by an adequately qualified individual, showing how unnecessary soil compaction will be avoided or remedied in a timely manner through deep soil decompaction or other appropriate practices. The approved plan shall be attached to the decision as a condition of approval;

(D) Construction or maintenance activities will not result in the unabated introduction or spread of noxious weeds and other undesirable weed species. This provision may be satisfied by the submittal and county approval of a weed control plan prepared by an adequately qualified individual that includes a long-term maintenance agreement. The approved plan shall be attached to the decision as a condition of approval;

(E) The project is not located on high-value farmland soils unless it can be demonstrated that:

(i) Non high-value farmland soils are not available on the subject tract;

(ii) Siting the project on non high-value farmland soils present on the subject tract would significantly reduce the project’s ability to operate successfully; or

(iii) The proposed site is better suited to allow continuation of an existing commercial farm or ranching operation on the subject tract than other possible sites also located on the subject tract, including those comprised of non high-value farmland soils; and

(F) A study area consisting of lands zoned for exclusive farm use located within one mile measured from the center of the proposed project shall be established and:

(i) If fewer than 48 acres of photovoltaic solar power generation facilities have been constructed or received land use approvals and obtained building permits within the study area, no further action is necessary.

(ii) When at least 48 acres of photovoltaic solar power generation have been constructed or received land use approvals and obtained building permits, either as a single project or as multiple facilities within the study area, the local government or its designate must find that the photovoltaic solar energy generation facility will not materially alter the stability of the overall land use pattern of the area. The stability of the land use pattern will be materially altered if the overall effect of existing and potential photovoltaic solar energy generation facilities will make it more difficult for the existing farms and ranches in the area to continue operation due to diminished opportunities to expand, purchase or lease farmland or acquire water rights, or will reduce the number of tracts or acreage in farm use in a manner that will destabilize the overall character of the study area.

(g) For arable lands, a photovoltaic solar power generation facility shall not preclude more than 20 acres from use as a commercial agricultural enterprise unless an exception is taken pursuant to ORS 197.732 and OAR chapter 660, division 4. The governing body or its designate must find that:

(A) The project is not located on high-value farmland soils or arable soils unless it can be demonstrated that:

(i) Nonarable soils are not available on the subject tract;

(ii) Siting the project on nonarable soils present on the subject tract would significantly reduce the project’s ability to operate successfully; or

(iii) The proposed site is better suited to allow continuation of an existing commercial farm or ranching operation on the subject tract than other possible sites also located on the subject tract, including those comprised of nonarable soils;

(B) No more than 12 acres of the project will be sited on high-value farmland soils described at ORS 195.300(10) unless an exception is taken pursuant to 197.732 and OAR chapter 660, division 4;

(C) A study area consisting of lands zoned for exclusive farm use located within one mile measured from the center of the proposed project shall be established and:

(i) If fewer than 80 acres of photovoltaic solar power generation facilities have been constructed or received land use approvals and obtained building permits within the study area no further action is necessary.

(ii) When at least 80 acres of photovoltaic solar power generation have been constructed or received land use approvals and obtained building permits, either as a single project or as multiple facilities, within the study area the local government or its designate must find that the photovoltaic solar energy generation facility will not materially alter the stability of the overall land use pattern of the area. The stability of the land use pattern will be materially altered if the overall effect of existing and potential photovoltaic solar energy generation facilities will make it more difficult for the existing farms and ranches in the area to continue operation due to diminished opportunities to expand, purchase or lease farmland, acquire water rights or diminish the number of tracts or acreage in farm use in a manner that will destabilize the overall character of the study area; and

(D) The requirements of OAR 660-033-0130(38)(f)(A), (B), (C) and (D) are satisfied.

(h) For nonarable lands, a photovoltaic solar power generation facility shall not preclude more than 250 acres from use as a commercial agricultural enterprise unless an exception is taken pursuant to ORS 197.732 and OAR chapter 660, division 4. The governing body or its designate must find that:

(A) The project is not located on high-value farmland soils or arable soils unless it can be demonstrated that:

(i) Siting the project on nonarable soils present on the subject tract would significantly reduce the project’s ability to operate successfully; or

(ii) The proposed site is better suited to allow continuation of an existing commercial farm or ranching operation on the subject tract as compared to other possible sites also located on the subject tract, including sites that are comprised of nonarable soils;

(B) No more than 12 acres of the project will be sited on high-value farmland soils described at ORS 195.300(10);

(C) No more than 20 acres of the project will be sited on arable soils unless an exception is taken pursuant to ORS 197.732 and OAR chapter 660, division 4;

(D) The requirements of OAR 660-033-0130(38)(f)(D) are satisfied;

(E) If a photovoltaic solar power generation facility is proposed to be developed on lands that contain a Goal 5 resource protected under the county’s comprehensive plan, and the plan does not address conflicts between energy facility development and the resource, the applicant and the county, together with any state or federal agency responsible for protecting the resource or habitat supporting the resource, will cooperatively develop a specific resource management plan to mitigate potential development conflicts. If there is no program present to protect the listed Goal 5 resource(s) present in the local comprehensive plan or implementing ordinances and the applicant and the appropriate resource management agency(ies) cannot successfully agree on a cooperative resource management plan, the county is responsible for determining appropriate mitigation measures; and

(F) If a proposed photovoltaic solar power generation facility is located on lands where the potential exists for adverse effects to state or federal special status species (threatened, endangered, candidate, or sensitive), or to wildlife species of concern identified and mapped by the Oregon Department of Fish and Wildlife (including big game winter range and migration corridors, golden eagle and prairie falcon nest sites, and pigeon springs), the applicant shall conduct a site-specific assessment of the subject property in consultation with all appropriate state, federal, and tribal wildlife management agencies. A professional biologist shall conduct the site-specific assessment by using methodologies accepted by the appropriate wildlife management agency and shall determine whether adverse effects to special status species or wildlife species of concern are anticipated. Based on the results of the biologist’s report, the site shall be designed to avoid adverse effects to state or federal special status species or to wildlife species of concern as described above. If the applicant’s site-specific assessment shows that adverse effects cannot be avoided, the applicant and the appropriate wildlife management agency will cooperatively develop an agreement for project-specific mitigation to offset the potential adverse effects of the facility. Where the applicant and the resource management agency cannot agree on what mitigation will be carried out, the county is responsible for determining appropriate mitigation, if any, required for the facility.

(G) The provisions of paragraph (F) are repealed on January 1, 2022.

(i) The county governing body or its designate shall require as a condition of approval for a photovoltaic solar power generation facility, that the project owner sign and record in the deed records for the county a document binding the project owner and the project owner’s successors in interest, prohibiting them from pursuing a claim for relief or cause of action alleging injury from farming or forest practices as defined in ORS 30.930(2) and (4).

(j) Nothing in this section shall prevent a county from requiring a bond or other security from a developer or otherwise imposing on a developer the responsibility for retiring the photovoltaic solar power generation facility.

(k) The commission may re-evaluate the acreage thresholds identified in subsections (f), (g) and (h) should ORS 469.300(11)(a)(D) be amended.

(39) Dog training classes or testing trials conducted outdoors or in farm buildings that existed on January 1, 2013, when:

(a) The number of dogs participating in training does not exceed 10 per training class and the number of training classes to be held on-site does not exceed six per day; and

(b) The number of dogs participating in a testing trial does not exceed 60 and the number of testing trials to be conducted on-site does not exceed four per calendar year.

Stat. Auth.: ORS 197.040

Stats. Implemented: ORS 197.040, 215.213, 215.275, 215.282, 215.283, 215.301, 215.448, 215.459 & 215.705

Hist.: LCDC 6-1992, f. 12-10-92, cert. ef. 8-7-93; LCDC 3-1994, f. & cert. ef. 3-1-94; LCDC 6-1994 , f. & cert. ef. 6-3-94; LCDC 8-1995, f. & cert. ef. 6-29-95; LDCD 5-1996, f. & cert. ef. 12-23-96; LCDD 5-1997, f. & cert. ef. 12-23-97; LCDD 2-1998, f. & cert. ef. 6-1-98; LCDD 5-2000, f. & cert. ef. 4-24-00; LCDD 9-2000, f. & cert. ef. 11-3-00; LCDD 1-2002, f. & cert. ef. 5-22-02; LCDD 1-2004, f. & cert. ef. 4-30-04; LCDD 2-2006, f. & cert. ef. 2-15-06; LCDD 3-2008, f. & cert. ef. 4-18-08; LCDD 5-2008, f. 12-31-08, cert. ef. 1-2-09; LCDD 5-2009, f. & cert. ef. 12-7-09; LCDD 6-2010, f. & cert. ef. 6-17-10; LCDD 7-2010(Temp), f. & cert. ef. 6-17-10 thru 11-30-10; LCDD 9-2010, f. & cert. ef. 9-24-10; LCDD 11-2010, f. & cert. ef. 11-23-10; LCDD 4-2011, f. & cert. ef. 3-16-11; LCDD 9-2011, f. & cert. ef. 11-23-11; LCDD 7-2012, f. & cert. ef. 2-14-12; LCDD 2-2013, f. & cert. ef. 1-29-13; LCDD 6-2013, f. 12-20-13, cert. ef. 1-1-14

660-033-0140

Permit Expiration Dates

(1) Except as provided for in section (5) of this rule, a discretionary decision, except for a land division, made after the effective date of this division approving a proposed development on agricultural or forest land outside an urban growth boundary under ORS 215.010 to 215.293 and 215.317 to 215.438 or under county legislation or regulation adopted pursuant thereto is void two years from the date of the final decision if the development action is not initiated in that period.

(2) A county may grant one extension period of up to 12 months if:

(a) An applicant makes a written request for an extension of the development approval period;

(b) The request is submitted to the county prior to the expiration of the approval period;

(c) The applicant states reasons that prevented the applicant from beginning or continuing development within the approval period; and

(d) The county determines that the applicant was unable to begin or continue development during the approval period for reasons for which the applicant was not responsible.

(3) Approval of an extension granted under this rule is an administrative decision, is not a land use decision as described in ORS 197.015 and is not subject to appeal as a land use decision.

(4) Additional one-year extensions may be authorized where applicable criteria for the decision have not changed.

(5)(a) If a permit is approved for a proposed residential development on agricultural or forest land outside of an urban growth boundary, the permit shall be valid for four years.

(b) An extension of a permit described in subsection (5)(a) of this rule shall be valid for two years.

(6) For the purposes of section (5) of this rule, “residential development” only includes the dwellings provided for under ORS 215.213(3) and (4), 215.284, 215.705(1) to (3), 215.720, 215.740, 215.750 and 215.755(1) and (3).

Stat. Auth.: ORS 197.040 & 215

Stats. Implemented: ORS 197.015, 197.040, 197.230 & 197.245

Hist.: LCDC 6-1992, f. 12-10-92, cert. ef. 8-7-93; LCDD 1-2002, f. & cert. ef. 5-22-02; LCDD 4-2011, f. & cert. ef. 3-16-11; LCDD 6-2013, f. 12-20-13, cert. ef. 1-1-14

Notes
1.) This online version of the OREGON BULLETIN is provided for convenience of reference and enhanced access. The official, record copy of this publication is contained in the original Administrative Orders and Rulemaking Notices filed with the Secretary of State, Archives Division. Discrepancies, if any, are satisfied in favor of the original versions. Use the OAR Revision Cumulative Index found in the Oregon Bulletin to access a numerical list of rulemaking actions after November 15, 2013.

2.) Copyright Oregon Secretary of State: Terms and Conditions of Use

Oregon Secretary of State • 136 State Capitol • Salem, OR 97310-0722
Phone: (503) 986-1523 • Fax: (503) 986-1616 • oregon.sos@state.or.us

© 2013 State of Oregon All Rights Reserved​