DEPARTMENT OF ENVIRONMENTAL QUALITY

 

DIVISION 97

SOLID WASTE: PERMIT FEES

340-097-0001

Applicability

This division applies to persons owning or operating or applying to DEQ to own or operate, a municipal solid waste landfill, a non-municipal land disposal site, an energy recovery facility or an incinerator receiving solid waste delivered by the public or by a solid waste collection service, a composting facility, a sludge disposal site, a land application disposal site, a transfer station, a material recovery facility, a solid waste treatment facility, a solid waste conversion technology facility or any other solid waste disposal site required to obtain a solid waste permit from DEQ. It also applies to persons who transport solid waste out of Oregon for final disposal or destruction at a disposal site that receives domestic solid waste. Beginning April 1, 2019, it also applies to persons who transport solid waste out of Oregon for final disposal or destruction at a disposal site that receives construction and demolition waste, land clearing debris, or waste tires for final disposal or destruction.

Stat. Auth.: ORS 459.045, 459A.100 - 459A.120 & 468.020
Stats. Implemented: ORS 459.235
Hist.: DEQ 5-1993, f. & cert. ef. 3-10-93; DEQ 10-1994, f. & cert. ef. 5-4-94; DEQ 7-2013, f. & cert. ef. 8-29-13; DEQ 2-2016, f. & cert. ef. 2-4-16

340-097-0110

Solid Waste Permit and Disposal Fees

(1) Each person required to have a solid waste disposal permit is subject to the following fees:

(a) An application processing fee for new facilities which must be submitted with the application for a new permit as specified in OAR 340-097-0120(2); and

(b) A solid waste permit compliance fee as listed in OAR 340-097-0120(6).

(2) Each disposal site receiving domestic solid waste for final disposal or destruction must pay the per-ton solid waste disposal fees on solid waste as specified in OAR 340-097-0120(7). Beginning April 1, 2019, and first payable beginning July 1, 2019, land disposal sites receiving construction and demolition wastes, land clearing debris, or tires for final disposal or destruction must also pay this fee.

(3) Oregon solid waste disposed of out-of-state. A person who transports solid waste, generated in Oregon, for final disposal or destruction at a disposal site located outside of Oregon that receives domestic solid waste, or beginning April 1, 2019, a land disposal site that receives construction and demolition waste, land clearing debris, or waste tires for final disposal or destruction, must pay the per-ton solid waste disposal fees as specified in OAR 340-097-0120(7).

(a) For purposes of this rule and OAR 340-097-0120(7), a person is the transporter if the person transports or arranges for the transport of solid waste out of Oregon for final disposal or destruction at a disposal site that receives domestic solid waste, or beginning April 1, 2019, a land disposal site that receives construction and demolition waste, land clearing debris, or waste tires for final disposal or destruction, and is:

(A) A solid waste collection service or any other person who hauls, under an agreement, solid waste out of Oregon;

(B) A person who hauls his or her own industrial, commercial or institutional waste or other waste such as cleanup materials contaminated with hazardous substances;

(C) An operator of a transfer station, when Oregon waste is delivered to a transfer station located in Oregon and from there is transported out of Oregon for final disposal or destruction;

(D) A person who authorizes or retains the services of another person for disposal of cleanup materials contaminated with hazardous substances; or

(E) A person who transports infectious waste.

(b) Notification requirement:

(A) Before transporting or arranging for transport of solid waste for final disposal or destruction out of Oregon to a disposal site that receives domestic solid waste, or beginning April 1, 2019, to a land disposal site that receives construction and demolition wastes, land clearing debris, or waste tires, the person identified in subsection (3)(a) must notify DEQ in writing on a form DEQ provides.

(B) The notification must state whether the person will transport the waste on an on-going basis.

(c) As used in this section, "person" does not include an individual transporting only the individual's own residential solid waste to a disposal site located out of the state.

(4) Fees. The solid waste permit compliance fee must be paid for each year a disposal site requiring a solid waste permit is in operation or under permit. The fee period is prospective and is as follows:

(a) New sites requiring a solid waste permit:

(A) Any new disposal site must pay a solid waste permit compliance fee 30 days after the end of the calendar quarter in which solid waste is received at the facility, except as specified in paragraph (4)(a)(B), (C) and (D);

(B) A new disposal site that receives less than 1,000 tons of solid waste per year, other than a transfer station, material recovery facility or composting facility, must pay the entire permit compliance fee for the first year's operation if the facility is placed into operation on or before September 1. A new facility placed into operation after September 1 will not owe a permit compliance fee until the following January 31. An application for a new disposal site receiving less than 1,000 tons of solid waste a year must include the applicable permit compliance fee for the first year of operation;

(C) A new industrial solid waste disposal site, sludge or land application disposal site or solid waste treatment facility receiving more than 1,000 but less than 20,000 tons of solid waste a year must pay a solid waste permit compliance fee on January 31 following the calendar year in which the facility is placed into operation;

(D) A new transfer station, material recovery facility or composting facility must pay the entire permit compliance fee for the first fiscal year's operation, based on the state's fiscal year, if the facility is placed into operation on or before April 1. Any new facility placed into operation after April 1 will not owe a permit compliance fee until DEQ's annual billing for the next fiscal year. An application for a new transfer station, material recovery facility or composting facility must include the applicable permit compliance fee for the first year of operation.

(b) Existing permitted sites. Any existing disposal site that is in operation and is permitted to receive or receives solid waste in a calendar year must pay the solid waste permit compliance fee for that year as specified in OAR 340-097-0120(6)(a), (b), and (c). A facility is deemed to be an "existing permitted site" from the time of permit issuance;

(c) Closed sites. If a land disposal site stops receiving waste before April 1 of the fiscal year in which the site permanently ceases active operations, based on the state's fiscal year, the permittee must pay the solid waste permit compliance fee for the "year of closure" OAR 340-097-0120(6)(d)(A) specifies as well as the permit compliance fee the permittee pays quarterly based on the waste received in the previous calendar quarters. If a land disposal site has permanently ceased receiving waste and the site is closed, a solid waste permittee must pay the solid waste permit compliance fee for closed sites as specified in OAR 340-097-0120(6)(d);

(d) DEQ may alter the due date for the solid waste permit compliance fee upon receipt of a justifiable request from a permittee.

(5) Tonnage reporting. The permit compliance fee and per-ton solid waste disposal fees, if applicable, must be submitted together with a form DEQ approves. Information reported must include the amount and type of solid waste and any other information DEQ requires to substantiate the tonnage or to calculate the state material recovery rate.

(6) Calculation of tonnage. Permittees and registrants are responsible for accurately calculating solid waste tonnage. For purposes of determining appropriate fees under OAR 340-097-0120(6) and (7), annual tonnage of solid waste received must be calculated as follows:

(a) Municipal solid waste facilities. Annual tonnage of solid waste received at municipal solid waste facilities, including construction and demolition sites and municipal solid waste composting facilities, receiving 50,000 or more tons annually must be based on weight from certified scales. When certified scales are required, all solid waste received at the facility for disposal must be weighed at the facility's scales, except as DEQ otherwise approves in writing. If certified scales are required but are temporarily not functioning, all solid waste received at the facility must either use other certified scales in the area or estimate tonnage as specified in this section. If certified scales are not required, estimated annual tonnage for municipal solid waste, including that at municipal solid waste composting facilities, will be based upon 300 pounds per cubic yard of uncompacted waste received, and 700 pounds per cubic yard of compacted waste received. If yardage is not known, the solid waste facility may use one ton per resident in the service area of the disposal site, unless the permittee demonstrates a more accurate estimate. For other types of wastes received at municipal solid waste sites and where certified scales are not required or not available, the conversions and provisions in subsection (b) must be used;

(b) Industrial facilities. Annual tonnage of solid waste received at industrial facilities receiving 50,000 or more tons annually must be based on weight from certified scales. When certified scales are required, all solid waste received at the facility must be weighed at the facility's scales, except as DEQ otherwise approves in writing. If certified scales are required but are temporarily not functioning, all solid waste received at the facility must either use other certified scales in the area or estimate tonnage as specified in this section. If certified scales are not required, industrial sites must use the following conversion factors to determine tonnage of solid waste disposed. Composting facilities must use the following conversion factors for those materials appropriate for composting:

(A) Asbestos: 500 pounds per cubic yard;

(B) Pulp and paper waste other than sludge: 1,000 pounds per cubic yard;

(C) Construction, demolition and land clearing wastes: 1,100 pounds per cubic yard;

(D) Wood waste:

(i) Wood waste, mixed, including log sort waste (as defined in OAR 340-093-0030): 1,200 pounds per cubic yard;

(ii) Wood waste including scrap lumber, pallets, wood from construction and demolition activities: 250 pounds per cubic yard;

(iii) Wood chips, green: 473 pounds per cubic yard;

(iv) Wood chips, dry: 243 pounds per cubic yard;

(v) Sawdust, wet: 530 pounds per cubic yard;

(vi) Sawdust, bone dry: 275 pounds per cubic yard.

(E) Yard debris:

(i) Grass clippings: 950 pounds per cubic yard;

(ii) Leaves: 375 pounds per cubic yard;

(iii) Compacted yard debris: 640 pounds per cubic yard; and

(iv) Uncompacted yard debris: 250 pounds per cubic yard.

(F) Manure, sludge, septage, grits, screenings and other wet wastes: 1,600 pounds per cubic yard;

(G) Food waste: 700 pounds per cubic yard;

(H) Ash and slag: 2,000 pounds per cubic yard;

(I) Contaminated soils: 2,400 pounds per cubic yard;

(J) Asphalt, mining and milling wastes, foundry sand, silica: 2,500 pounds per cubic yard;

(K) For wastes other than the above, the permittee or registrant must determine the density of the wastes subject to DEQ’s written approval;

(L) As an alternative to the above conversion factors, the permittee or registrant may determine the density of their own waste, subject to DEQ’s written approval.

(7) DEQ may refund the application processing fee, in whole or in part, after taking into consideration any costs DEQ may have incurred in processing the application, when submitted with an application if either of the following conditions exists:

(a) DEQ determines that no permit is required;

(b) The applicant withdraws the application before DEQ has granted or denied preliminary approval or, if no preliminary approval has been granted or denied, DEQ has approved or denied the application.

(8) Exemptions:

(a) Persons treating petroleum contaminated soils are exempt from the application processing and renewal fees for a Letter Authorization if the following conditions are met:

(A) The soil is being treated as part of a site cleanup authorized under ORS Chapters 465 or 466; and

(B) DEQ and the applicant for the Letter Authorization have entered into a written agreement under which the applicant must pay for costs DEQ incurred for oversight of the cleanup and for processing of the Letter Authorization.

(b) Persons to whom a Letter Authorization has been issued are not subject to the solid waste permit compliance fee.

(9) All fees must be made payable to the Department of Environmental Quality.

(10) Submittal schedule:

(a) DEQ bills the solid waste permit compliance fee to the holder of the following permits: transfer station, material recovery facility, composting facility and closed solid waste disposal site. The fee period is the state's fiscal year, July 1 through June 30, and the fee is due annually by the date indicated on the invoice. Any "year of closure" pro-rated fee will be billed to the permittee of a closed site together with the site's first regular billing as a closed site;

(b) For solid waste disposal site permit holders other than those in subsection (10)(a), DEQ does not bill the solid waste permit compliance fee to the permittee. The permittee must self-report these fees to DEQ, under sections (4) and (5). The fee period is either the calendar quarter or the calendar year, and the fees are due to DEQ as follows:

(A) For any disposal site required to pay the per-ton fee on any solid waste as specified in OAR 340-097-0120(7) (e.g., landfills, municipal waste incinerators, municipal energy recovery facilities, conversion technology facilities, and solid waste treatment facilities that receive domestic solid waste for final disposal or destruction), plus construction and demolition and tire landfills: on the same schedule as specified in subsection (10)(c);

(B) For industrial solid waste disposal sites, sludge or land application disposal sites and other disposal sites not required to pay the per-ton fee on solid waste as specified in OAR 340-097-0120(7), except construction and demolition and tire landfills:

(i) For sites receiving over 20,000 tons of waste a year: quarterly, on the 30th day of the month following the end of the calendar quarter; or

(ii) For sites receiving 20,000 tons of waste a year or less: annually, on the 31st day of January;

(iii) For a site that has received less than 20,000 tons of waste in past years but exceeds that amount in a given year, DEQ will in general grant a one-year delay before the site is required to begin submitting permit fees on a quarterly basis. If the site appears likely to continue to exceed the 20,000 annual ton limit, then DEQ will require the site to report tonnage and submit applicable permit fees on a quarterly basis.

(c) DEQ does not bill the per-ton solid waste disposal fees on solid waste and the Orphan Site Account fee. They must be paid on the following schedule:

(A) Quarterly, on the 30th day of the month following the end of the calendar quarter; or

(B) Annually, on the 31st day of January, for solid waste disposal site permit holders for sites receiving less than 1,000 tons of solid waste a year.

(d) The fees on Oregon solid waste disposed of out-of-state must be paid to DEQ quarterly on the 30th day of the month following the end of the calendar quarter or on the schedule specified in OAR 340-097-0120(7)(d)(C). The fees must be submitted together with a form DEQ approves, which must include the amount of solid waste, type, county of origin of the solid waste, and state to which the solid waste is being transported for final disposal.

Stat. Auth.: ORS 459.045, 459.235, 459.236, 459A.025, 459A.110, 459A.115 , 468.065
Stats. Implemented: ORS 459.235, 459.236, 459A.110 & 459A.115
Hist.: DEQ 3-1984, f. & ef. 3-7-84; DEQ 45-1990, f. & cert. ef. 12-26-90; DEQ 12-1991(Temp), f. & cert. ef. 8-2-91; DEQ 28-1991, f. & cert. ef. 12-18-91; DEQ 8-1992, f. & cert. ef. 4-30-92; DEQ 5-1993, f. & cert. ef. 3-10-93, Renumbered from 340-061-0115; DEQ 23-1993, f. 12-16-93, cert. ef. 1-1-94; DEQ 10-1994, f. & cert. ef. 5-4-94; DEQ 9-1996, f. & cert. ef. 7-10-96; DEQ 17-1997, f. & cert. ef. 8-14-97; DEQ 27-1998, f. & cert. ef. 11-13-98; DEQ 6-2009, f. & cert. ef. 9-14-09; DEQ 7-2013, f. & cert. ef. 8-29-13; DEQ 2-2016, f. & cert. ef. 2-4-16

340-097-0120

Permit/Registration Categories and Fee Schedule

(1) For purposes of OAR chapter 340, division 97:

(a) A "new facility" means a facility at a location not previously used or permitted, and does not include an expansion to an existing permitted site;

(b) An "off-site industrial facility" means all industrial solid waste disposal sites other than a "captive industrial facility;"

(c) A "captive industrial facility" means an industrial solid waste disposal site where the permittee is the owner and operator of the site and is the generator of all the solid waste received at the site.

(d) As used in this rule, the term "mixed solid waste" means solid wastes that include paper, plastic, and other materials at least partly made up of domestic waste, where the materials have not been separated from each other.

(2) Application Processing Fee. Except as provided in sections (3), (4), and (5) with respect to composting facilities, an application processing fee must be submitted with each application for a new facility, including application for preliminary approval pursuant to OAR 340-093-0090. The amount of the fee depends on the type of facility and the required action as follows:

(a) A new municipal solid waste landfill facility, construction and demolition landfill, incinerator, energy recovery facility, solid waste treatment facility, off-site industrial facility or sludge disposal facility:

(A) Designed to receive over 7,500 tons of solid waste per year: $10,000;

(B) Designed to receive 7,500 tons and less of solid waste per year: $5,000.

(b) A new captive industrial facility, other than a transfer station or material recovery facility: $1,000;

(c) A new transfer station or material recovery facility:

(A) Receiving over 50,000 tons of solid waste per year: $500;

(B) Receiving over 10,000 and less than or equal to 50,000 tons of solid waste per year: $200;

(C) Receiving 10,000 tons and less of solid waste per year: $100.

(d) Letter Authorization underto OAR 340-093-0060:

(A) New site: $500;

(B) Renewal: $500.

(e) Permit Exemption Determination under OAR 340-093-0080(2): $500.

(f) Beneficial use of solid waste application and reporting fees punder OAR 340-093-0260 through 340-093-0290:

(A) The review of an annual or other report required under a beneficial use determination: $250;

(B) A Tier One beneficial use determination: $1,000;

(C) A Tier Two beneficial use determination: $2,000;

(D) A Tier Three beneficial use determination: $5,000;

(E) Annual extension to a demonstration project authorization: $1,000.

(g) A new conversion technology facility:

(A) Designed to receive over 7,500 tons of feedstocks per year: $2,000;

(B) Designed to receive 7,500 tons or less of feedstocks per year: $1,500.

(3) Composting Facility Screening Fee. Every composting facility that is required to comply with OAR 340-096-0080 must pay a screening fee of $150. The fee must be submitted with the application for screening, as provided in OAR 340-096-0080(1).

(4) Facility Plan Review and Approval Fee.

(a) Every composting facility that is required to comply with OAR 340-096-0090 must pay an Operations Plan Approval fee as provided below. The fee must be submitted with the proposed Operations Plan, as provided in OAR 340-096-0090(1). Agricultural composting facilities for which the Oregon Department of Agriculture is providing facility plan review and approval are not required to pay this fee.

(A) For facilities composting over 100 tons and less than or equal to 3,500 tons of feedstocks per year: $500;

(B) For facilities composting over 3,500 tons and less than or equal to 7,500 tons of feedstocks per year: $750;

(C) For facilities composting over 7,500 tons and less than or equal to 10,000 tons of feedstocks per year: $1000;

(D) For facilities composting over 10,000 tons and less than or equal to 50,000 tons of feedstocks per year: $2,000;

(E) For facilities composting over 50,000 tons of feedstocks per year: $5,000.

(b) Every conversion technology facility that is required to comply with OAR 340-096-0180 must pay a fee as provided below. The fee must be submitted with the proposed Operations Plan, as provided in OAR 340-096-0180.

(A) For facilities designed to receive 3,500 tons of feedstocks or less per year: $1,000;

(B) For facilities designed to receive over 3,500 tons but no more than 7,500 tons of feedstocks per year: $1,500;

(C) For facilities designed to receive over 7,500 tons but no more than 20,000 tons of feedstocks per year: $2,200;

(D) For facilities designed to receive over 20,000 tons but no more than 50,000 tons of feedstocks per year: $3,000;

(E) For facilities designed to receive over 50,000 tons of feedstocks per year: $5,000.

(5) Composting Facility Engineering Review Fee. Every composting facility that requires DEQ review of engineering plans and specifications under OAR 340-096-0130 must pay a fee of $500. This fee is in addition to the fee required by section (4). Agricultural composting facilities for which the Oregon Department of Agriculture provides review of engineering plans and specifications are not required to pay this fee.

(6) Solid Waste Permit Compliance Fee. The following is the fee schedule including base per-ton rates to be used to determine the solid waste permit compliance fee. The per-ton rates are based on the estimated solid waste to be received at all permitted solid waste disposal sites and on DEQ's Legislatively Approved Budget. DEQ reviews annually the amount of revenue generated by this fee schedule. To determine the solid waste permit compliance fee, DEQ may use the base per-ton rates or any lower rates if the rates generate more revenue than provided in DEQ's Legislatively Approved Budget. Any increase in the base rates must be established by rule. In any case where a facility fits into more than one category, the permittee must pay only the highest fee:

(a) All facilities accepting or permitted to accept solid waste for final disposal or destruction, excluding transfer stations, material recovery facilities and composting facilities:

(A) The greater of $200; or

(B) A solid waste permit compliance fee based on the total amount of solid waste received at the facility in the previous calendar quarter or year, as applicable, at the following rate:

(i) All municipal landfills, construction and demolition landfills, industrial landfills, sludge disposal facilities, incinerators and solid waste treatment facilities: $.21 per ton through June 30, 2016, and $.58 per ton beginning July 1, 2016;

(ii) Energy recovery facilities. $.13 per ton through June 30, 2016, and $.58 per ton beginning July 1, 2016; and

(iii) Conversion technology facilities: $.10 per ton through June 30, 2016, and $.58 per ton beginning July 1, 2016.

(C) If DEQ does not require a disposal site, other than a municipal solid waste facility, to monitor and report volumes of solid waste collected, the solid waste permit compliance fee may be based on the estimated tonnage received in the previous quarter or year.

(D) Ash or residue received by a landfill from an energy recovery facility, incinerator, or conversion technology facility is not subject to the solid waste permit compliance fee paid on a per-ton basis under paragraph (B) if the energy recovery facility, incinerator, or conversion technology facility has paid this fee on all incoming waste. Alternatively, DEQ can make arrangements to split this fee between a landfill and an energy recovery facility, incinerator, or conversion technology facility, based on the proportion by weight of the ash and residue received by the landfill and the total weight of incoming waste received by the energy recovery facility, incinerator, or conversion technology facility.

(b) Transfer stations and material recovery facilities:

(A) Facilities accepting over 50,000 tons of solid waste per year: $1,000;

(B) Facilities accepting over 10,000 and less than or equal to 50,000 tons of solid waste per year: $500;

(C) Facilities accepting 10,000 tons or less of solid waste per year: $50.

(c) Composting facilities with a composting permit, except agricultural composting facilities for which the Oregon Department of Agriculture is providing facility oversight:

(A) Utilizing over 50,000 tons of feedstocks for composting per year: $5,000;

(B) Utilizing over 7,500 and less than or equal to 50,000 tons of feedstocks for composting per year: $1,000;

(C) Utilizing over 3,500 and less than or equal to 7,500 tons of feedstocks for composting per year: $500;

(D) Utilizing over 100 tons and less than or equal to 3,500 tons of feedstocks for composting per year: $100.

(d) Closed Disposal Sites:

(A) Year of closure. If a land disposal site stops receiving waste before April 1 of the fiscal year in which the site permanently ceases active operations, DEQ will determine a pro-rated permit compliance fee for those quarters of the fiscal year not covered by the permit compliance fee paid on solid waste received at the site. The pro-rated fee for the quarters the site was closed is based on the calculation in paragraph (B);

(B) Each land disposal site that closes after July 1, 1984: $150 or the average tonnage of solid waste received in the three most active years of site operation multiplied by $.025 per ton, whichever is greater; but the maximum permit compliance fee is $2,500.

(7) Per-ton solid waste disposal fees on solid waste. Each solid waste disposal site that receives domestic solid waste for final disposal or destruction, and each person transporting solid waste out of Oregon for disposal at a disposal site that receives domestic solid waste, except as excluded under OAR 340-097-0110(3)(c), must submit fees to DEQ for solid waste received at the disposal site or transported out of Oregon. Beginning April 1, 2019, each solid waste land disposal site that receives construction or demolition waste, land clearing debris, or tires for final disposal or destruction, and each person transporting solid waste out of Oregon for disposal at a land disposal site that receives construction or demolition waste, land clearing debris, or tires for final disposal or destruction, except as excluded under OAR 340-097-0110(3)(c), must also submit fees to DEQ for solid waste received at the disposal site or transported out of Oregon.

(a) These fees include:

(A) A fee of $.81 per ton through March 31, 2016, raised to $1.11 per ton beginning April 1, 2016, through March 31, 2019, and raised to $1.18 per ton beginning April 1, 2019;

(B) An additional per-ton fee of $.13 for the Orphan Site Account.

(b) Tons subject to these fees include:

(A) All solid wastes landfilled, incinerated without energy recovery or treated for disposal by an Oregon disposal site that receives domestic solid waste, except as excluded in subsections (c) and (f);

(B) All Oregon solid wastes that are transported out-of-state for disposal or destruction at a disposal site that receives domestic solid waste, except as excluded under OAR 340-097-0110(3)(c) and subsections (c) and (f);

(C) Mixed solid wastes that are processed by a conversion technology facility, burned for energy recovery, or composted by an Oregon disposal site that receives domestic waste;

(D) Mixed solid waste that includes at least some domestic solid waste, that has been processed into refuse-derived fuel to be burned for energy recovery by a facility that does not have a solid waste permit, or that does not pay per-ton fees as specified in this section;

(E) Beginning April 1, 2019, all solid wastes landfilled at an Oregon land disposal site that receives construction or demolition waste, land clearing debris, or tires for final disposal or destruction, except as excluded in subsections (c) and (f); and

(F) Beginning April 1, 2019, all Oregon solid wastes that are transported out-of-state for disposal at a land disposal site that receives construction or demolition waste, land clearing debris, or tires for final disposal or destruction, except as excluded in subsections (c) and (f).

(c) Tons not subject to these fees include:

(A) Through March 31, 2019, all solid wastes received at a facility that does not receive domestic solid waste;

(B) Beginning April 1, 2019, all solid wastes received at a facility that does not receive domestic solid waste or construction or demolition waste, land clearing debris, or tires;

(C) Source-separated recyclables or other materials separated and recycled from mixed solid waste, including separated organics that are composted;

(D) Construction and demolition wastes and industrial wastes that are processed by a material recovery facility or a conversion technology facility to make a fuel to be burned off-site for energy recovery (e.g., in a wood fuel boiler);

(E) All solid wastes sent by a disposal site to another disposal site, where the per-ton fees are paid by a disposal site that subsequently receives that waste;

(F) Solid waste used as daily cover at a landfill as described in subsection (f);

(G) Ash from an energy recovery facility or incinerator that has paid these fees; and

(H) Sewage sludge or septic tank and cesspool pumpings.

(d) Submittal schedule:

(A) These per-ton fees must be submitted to DEQ quarterly. Quarterly remittals are due on the 30th day of the month following the end of the calendar quarter;

(B) Disposal sites receiving less than 1,000 tons of solid waste per year must submit the fees annually on January 31. If DEQ does not require the disposal site to monitor and report volumes of solid waste collected, the disposal site must submit with the fees an estimate of the population the disposal site serves;

(C) For solid waste transported out-of-state for disposal, the per-ton fees must be paid to DEQ quarterly. Quarterly remittals are due on the 30th day of the month following the end of the calendar quarter in which the disposal occurred. If the transportation is not on-going, the fee must be paid to DEQ within 60 days after the disposal occurs.

(e) Solid waste that is used as daily cover at a landfill in place of virgin soil is not subject to the per-ton solid waste fees in this section, provided that:

(A) The amount of solid waste used as daily cover does not exceed the amount needed to provide the equivalent of six inches of soil used as daily cover;

(B) If disposed of in Oregon, the solid waste is not being used on a trial basis, but instead has received necessary approvals from DEQ for use as daily cover; and

(C) If disposed of in a landfill outside of Oregon, the solid waste has received final approval from the appropriate state or local regulatory agency that regulates the landfill.

(f) For solid waste delivered to disposal facilities owned or operated by a Metropolitan Service District, the fees established in this section are levied on the district, not on the disposal site.

(8) 1991 Recycling Act Permit Fee

(a) Through June 30, 2016, a 1991 Recycling Act permit fee of $.09 per ton must be submitted by each solid waste permittee which received solid waste in the previous calendar quarter or year, as applicable, except transfer stations, material recovery facilities, composting facilities, conversion technology facilities that process only separated solid wastes, industrial facilities that do not receive wastes from off-site, and persons with letter authorizations. The fee must be paid along with the solid waste permit compliance fee as specified in OAR 340-097-0110. Disposal sites that receive less than 1,000 tons per year of solid waste for final disposal are exempt from paying the 1991 Recycling Act permit fee for 2016.

(b) Effective July 1, 2016, the 1991 Recycling Act permit fee is eliminated.

Stat. Auth.: ORS 459.045, 459.235 & 468.065
Stats. Implemented: ORS 459.235, 459.236, 459A.110 & 459A.115
Hist.: DEQ 3-1984, f. & ef. 3-7-84; DEQ 12-1988, f. & cert. ef. 6-14-88; DEQ 14-1990, f. & cert. ef. 3-22-90; DEQ 45-1990, f. & cert. ef. 12-26-90; DEQ 12-1991(Temp), f. & cert. ef. 8-2-91; DEQ 28-1991, f. & cert. ef. 12-18-91; DEQ 8-1992, f. & cert. ef. 4-30-92; DEQ 5-1993, f. & cert. ef. 3-10-93, Renumbered from 340-061-0120; DEQ 23-1993, f. 12-16-93, cert. ef. 1-1-94; DEQ 10-1994, f. & cert. ef. 5-4-94; DEQ 9-1996, f. & cert. ef. 7-10-96; DEQ 17-1997, f. & cert. ef. 8-14-97; DEQ 27-1998, f. & cert. ef. 11-13-98; DEQ 6-2009, f. & cert. ef. 9-14-09; DEQ 4-2010, f. & cert. ef. 5-14-10; DEQ 7-2013, f. & cert. ef. 8-29-13; DEQ 2-2016, f. & cert. ef. 2-4-16

The official copy of an Oregon Administrative Rule is contained in the Administrative Order filed at the Archives Division, 800 Summer St. NE, Salem, Oregon 97310. Any discrepancies with the published version are satisfied in favor of the Administrative Order. The Oregon Administrative Rules and the Oregon Bulletin are copyrighted by the Oregon Secretary of State. Terms and Conditions of Use